BUYER CONTACT- 703-969-7036 |
|
|
|
-- |
-- |
Remove steps from front foyer |
|
|
-- |
-- |
This starving is covered with drywall, but the wall is definitely boTeed |
Bowed |
|
-- |
-- |
Top dormer windows have black plastic in them. That’s going to be removed, correct? |
|
|
-- |
-- |
Paint garage |
|
|
-- |
-- |
Hardware needed on cabinetry |
|
|
-- |
-- |
Remove pile of damaged drywall in living room |
Before may 10. They are walking through with realtor |
|
-- |
-- |
Very large squeak at middle landing of stairs leading to upper level |
Denny |
|
-- |
-- |
There are large holes at the bottom of all of the trim in this townhouse. Any reason why? |
Painter |
|
-- |
-- |
Replace molding behind master bedroom door |
George |
|
-- |
-- |
Trim upstairs bedroom doors so they open easily over carpet |
George |
|
-- |
-- |
Cover carpet |
Jill |
|
-- |
-- |
Have painters patch holes from trim screws |
|
|
-- |
-- |
Fit splash box under gutters |
Tom |
|
-- |
-- |
Hole needs to be patched behind bonus bath? |
|
|
-- |
-- |
Powder bath light needs installed |
Electrician |
|
-- |
-- |
Attic cover needed |
Painters |
|
-- |
-- |
Trim door to utility space |
George |
|
-- |
-- |
CODED LOCKBOX 7272 |
|
|
-- |
-- |
Thermostat needs installed |
|
|
-- |
-- |
Final paint touchup needed |
Painters |
|
-- |
-- |
Hole in powder bath |
Painter |
|
-- |
-- |
Side trim needed on kitchen island |
George, corner piece |
|
-- |
-- |
Gap and molding on staircase leading to upper level |
Painter |
|
-- |
-- |
Drywall issues in hall bathroom |
Drywaller, Painter |
|
-- |
-- |
Repaint exterior door trim on front door |
Painter |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Shower rod needs installed |
Paul |
|
-- |
-- |
Remove blue tape bonus bath |
Jill |
|
-- |
-- |
Remove glue bonus bath |
Jill |
|
-- |
-- |
Touch up paint trim bonus bath |
Painter |
|
-- |
-- |
Install cable cover garage |
Jill |
|
-- |
-- |
Few screws needed switchplate hall bath |
Jill |
|
-- |
-- |
Glue on hall tub |
Jill |
|
-- |
-- |
Glue in master bath |
Jill |
|
-- |
-- |
Paint throughout |
Painter |
|
-- |
-- |
remove paint for upper kitchen cabinet |
Painter |
|
-- |
-- |
remove mud from carpet on bonus room floor |
Jill |
|
-- |
-- |
replace garage door to interior |
|
|
-- |
-- |
Adjust bonus room closet and bonus closet door |
|
|
-- |
-- |
Pressure wash front and back |
|
|
-- |
-- |
Paint deck and bonus exterior door trim |
Painter |
|
-- |
-- |
Fix broken piece bonus room window |
Tom |
|
-- |
-- |
caulk kitchen counter backsplash |
Painter |
|
-- |
-- |
clean paint off stair hinges |
Painter |
|
-- |
-- |
hammer down nails in carpet up hallway |
Tom |
|
-- |
-- |
adjust pantry pocket door |
|
|
-- |
-- |
Fix master tray ceiling |
Drywall |
|
-- |
-- |
Missing screw in hall bath switchplate |
Jill |
|
-- |
-- |
adjust water pressure all showers |
Tom |
|
-- |
-- |
Adjust upstairs closet doors |
Jill |
|
-- |
-- |
leave extra paint |
Painter |
|
-- |
-- |
add small piece of drywall to utility closet |
Painter |
|
-- |
-- |
Remove glue in bonus bath |
|
|
-- |
-- |
CODED LOCKBOX 7272 |
|
|
-- |
-- |
Ratified Contract? (0) 11.10.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.17.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 11.10.2023 |
|
|
-- |
-- |
Association Packet Received (0) 11.15.2023 |
|
|
-- |
-- |
Selections Meeting (0) 12.06.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.28.2023 |
12/6: sent to Chris for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.22.2024 |
1/22: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.22.2024 |
|
|
-- |
-- |
Building Permit (30) 11.06.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 01.25.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 02.12.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.26.2023 |
|
|
-- |
-- |
Excavate (2) 12.26.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.26.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.26.2023 |
|
|
-- |
-- |
Pour Footers (1) 12.26.2023 |
|
|
-- |
-- |
Set Forms (2) 12.26.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.26.2023 |
|
|
-- |
-- |
Plumb Slab (2) 12.26.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 01.04.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 01.04.2024 |
|
|
-- |
-- |
Prepare Slab (1) 01.04.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 01.04.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 01.04.2024 |
|
|
-- |
-- |
Pour Slab (1) * 01.04.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.24.2024 |
|
|
-- |
-- |
Framing I (9) 01.29.2024 |
|
|
-- |
-- |
Order Steps (0) 02.14.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.14.2024 |
|
|
-- |
-- |
Framing II (8) 01.29.2024 |
|
|
-- |
-- |
Framing III (8) * 02.14.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 02.14.2024 |
|
|
-- |
-- |
Install Stairs (0) 02.14.2024 |
|
|
-- |
-- |
Windows & Doors (0) 02.14.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 03.04.2024 |
|
|
-- |
-- |
Roofing (0) 03.04.2024 |
|
|
-- |
-- |
Order Cabinets (0) 03.23.2024 |
|
|
-- |
-- |
Order Appliances (0) 05.20.2024 |
STANDARD |
|
-- |
-- |
Deck (0) 02.14.2024 |
|
|
-- |
-- |
Gutters (0) 04.24.2024 |
|
|
-- |
-- |
Driveway (0) 05.08.2024 |
|
|
-- |
-- |
Patio (0) 04.27.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.27.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 05.22.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 02.21.2024 |
In process 2/14 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.21.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 03.02.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.16.2024 |
In process 3/13 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 03.21.2024 |
|
|
-- |
-- |
Electric Rough In (4) 03.16.2024 |
In process 3/13 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 03.21.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 05.20.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) 03.21.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.27.2024 |
|
|
-- |
-- |
Exterior Stone (0) 05.08.2024 |
|
|
-- |
-- |
Insulation (2) 03.30.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 03.30.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 04.11.2024 |
|
|
-- |
-- |
Set Electric Meter (0) 05.02.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.21.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.21.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.12.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 03.30.2024 |
|
|
-- |
-- |
Loan Approval (0) 06.11.2024 |
Melissa Hoover, Mission Mortgage (96% LTV) |
|
-- |
-- |
Deed Preparation (0) 05.20.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.06.2024 |
In process 4/3 |
|
-- |
-- |
Paint 1 (1) 04.06.2024 |
|
|
-- |
-- |
Garage Door (0) 05.08.2024 |
|
|
-- |
-- |
House Numbers (0) 05.15.2024 |
|
|
-- |
-- |
Mailbox (0) 05.18.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.19.2024 |
Install April 19 |
|
-- |
-- |
Granite Installation (1) * 04.27.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 04.19.2024 |
In process 4/17 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 05.13.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 05.04.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.11.2024 |
In process 5/8 |
|
-- |
-- |
Luxury Vinyl Tile (0) 05.11.2024 |
In process 5/8 |
|
-- |
-- |
Paint 2 (3) 05.11.2024 |
|
|
-- |
-- |
Cover Floors (1) 06.01.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 05.13.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 05.18.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 06.01.2024 |
In process 5/29 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.05.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.16.2024 |
|
|
-- |
-- |
Set Water Meter (0) 05.30.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 06.01.2024 |
Standard Black. In process 5/29 |
|
-- |
-- |
Ceiling Fans (0) 05.26.2024 |
Master |
|
-- |
-- |
HVAC Trim Out (1) 06.05.2024 |
|
|
-- |
-- |
Blower Door Test (1) 06.17.2024 |
6/6 |
|
-- |
-- |
Plumbing Trim Out (2) 06.12.2024 |
Standard Black. In process 6/9 |
|
-- |
-- |
Install Appliances (0) * 06.12.2024 |
Leisa- being delivered Monday, June 10th |
|
-- |
-- |
Paint 3 (2) * 05.15.2024 |
|
|
-- |
-- |
Carpet (2) 05.11.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.20.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 06.17.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 06.17.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 06.17.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.17.2024 |
Thurs, June 13 |
|
-- |
-- |
Pre Walk Through (0) 06.17.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.01.2024 |
In process 5/29 |
|
-- |
-- |
Cleaning (1) 06.17.2024 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 06.20.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 06.20.2024 |
|
|
-- |
-- |
Schedule Closing (0) 06.20.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.18.2024 |
Mon, Jun 17 at 4:00 PM |
|
-- |
-- |
Payment for Upgrades (0) 06.20.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.10.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.21.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.13.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.13.2024 |
|
|
-- |
-- |
Closing (1) 06.21.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 06.24.2024 |
|
|