CONGERS-2 - 72  ::  1413 Appaloosa Court
[ BUILD: 20231884 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   BUYER CONTACT- 703-969-7036
--   --   Remove steps from front foyer
--   --   This starving is covered with drywall, but the wall is definitely boTeed Bowed
--   --   Top dormer windows have black plastic in them. That’s going to be removed, correct?
--   --   Paint garage
--   --   Hardware needed on cabinetry
--   --   Remove pile of damaged drywall in living room Before may 10. They are walking through with realtor
--   --   Very large squeak at middle landing of stairs leading to upper level Denny
--   --   There are large holes at the bottom of all of the trim in this townhouse. Any reason why? Painter
--   --   Replace molding behind master bedroom door George
--   --   Trim upstairs bedroom doors so they open easily over carpet George
--   --   Cover carpet Jill
--   --   Have painters patch holes from trim screws
--   --   Fit splash box under gutters Tom
--   --   Hole needs to be patched behind bonus bath?
--   --   Powder bath light needs installed Electrician
--   --   Attic cover needed Painters
--   --   Trim door to utility space George
--   --   CODED LOCKBOX 7272
--   --   Thermostat needs installed
--   --   Final paint touchup needed Painters
--   --   Hole in powder bath Painter
--   --   Side trim needed on kitchen island George, corner piece
--   --   Gap and molding on staircase leading to upper level Painter
--   --   Drywall issues in hall bathroom Drywaller, Painter
--   --   Repaint exterior door trim on front door Painter
--   --   Clean out garage Jill
--   --   Shower rod needs installed Paul
--   --   Remove blue tape bonus bath Jill
--   --   Remove glue bonus bath Jill
--   --   Touch up paint trim bonus bath Painter
--   --   Install cable cover garage Jill
--   --   Few screws needed switchplate hall bath Jill
--   --   Glue on hall tub Jill
--   --   Glue in master bath Jill
--   --   Paint throughout Painter
--   --   remove paint for upper kitchen cabinet Painter
--   --   remove mud from carpet on bonus room floor Jill
--   --   replace garage door to interior
--   --   Adjust bonus room closet and bonus closet door
--   --   Pressure wash front and back
--   --   Paint deck and bonus exterior door trim Painter
--   --   Fix broken piece bonus room window Tom
--   --   caulk kitchen counter backsplash Painter
--   --   clean paint off stair hinges Painter
--   --   hammer down nails in carpet up hallway Tom
--   --   adjust pantry pocket door
--   --   Fix master tray ceiling Drywall
--   --   Missing screw in hall bath switchplate Jill
--   --   adjust water pressure all showers Tom
--   --   Adjust upstairs closet doors Jill
--   --   leave extra paint Painter
--   --   add small piece of drywall to utility closet Painter
--   --   Remove glue in bonus bath
--   --   CODED LOCKBOX 7272
-- -- Ratified Contract? (0)  11.10.2023    
-- -- $2500 Deposit Received (0)  11.17.2023    
-- -- Association Packet Requested (0)  11.10.2023    
-- -- Association Packet Received (0)  11.15.2023    
-- -- Selections Meeting (0)  12.06.2023    
-- -- Selections Sheet Signed (0)  12.28.2023     12/6: sent to Chris for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  01.22.2024     1/22: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  01.22.2024    
-- -- Building Permit (30)  11.06.2023    
-- -- Order Roof & Floor Trusses (1)  01.25.2024    
-- -- Order Windows & Doors (0)  02.12.2024    
-- -- Stake Out Home (1)  12.26.2023    
-- -- Excavate (2)  12.26.2023    
-- -- Inspection (Footers) (1)  12.26.2023    
-- -- Inspection (Concrete Wall) (1)  12.26.2023    
-- -- Pour Footers (1)  12.26.2023    
-- -- Set Forms (2)  12.26.2023    
-- -- Pour Foundation Walls (1)  12.26.2023    
-- -- Plumb Slab (2)  12.26.2023    
-- -- Inspection (Plumbing Under Slab) (1)  01.04.2024    
-- -- Inspection (Conduit Under Slab) (1)  01.04.2024    
-- -- Prepare Slab (1)  01.04.2024    
-- -- Inspection (Slab) (1)  01.04.2024    
-- -- Inspection (Drain Tile) (0)  01.04.2024    
-- -- Pour Slab (1) *   01.04.2024    
-- -- Settlement Agent Confirmed (0)  01.24.2024    
-- -- Framing I (9)  01.29.2024    
-- -- Order Steps (0)  02.14.2024    
-- -- Order Tubs / Showers (0)  02.14.2024    
-- -- Framing II (8)  01.29.2024    
-- -- Framing III (8) *   02.14.2024    
-- -- Verify Window & Roof Structure (0)  02.14.2024    
-- -- Install Stairs (0)  02.14.2024    
-- -- Windows & Doors (0)  02.14.2024    
-- -- House Number and Status in Window (0)  03.04.2024    
-- -- Roofing (0)  03.04.2024    
-- -- Order Cabinets (0)  03.23.2024    
-- -- Order Appliances (0)  05.20.2024     STANDARD
-- -- Deck (0)  02.14.2024    
-- -- Gutters (0)  04.24.2024    
-- -- Driveway (0)  05.08.2024    
-- -- Patio (0)  04.27.2024    
-- -- Privacy Divider / Fence (0)  04.27.2024    
-- -- Sod / Seed / Landscaping (0)  05.22.2024    
-- -- HVAC Rough In (4)  02.21.2024     In process 2/14
-- -- Inspection (Rough In HVAC) (1)  03.21.2024    
-- -- Rough In Microwave Vent (0)  03.02.2024    
-- -- Plumbing Rough In (4)  03.16.2024     In process 3/13
-- -- Inspection (Rough In Plumbing) (1)  03.21.2024    
-- -- Electric Rough In (4)  03.16.2024     In process 3/13
-- -- Inspection (Rough In Electric) (1)  03.21.2024    
-- -- Inspection (Deck Piers) (0)  05.20.2024    
-- -- Inspection (Framing) (1)  03.21.2024    
-- -- Exterior Vinyl (0) *   04.27.2024    
-- -- Exterior Stone (0)  05.08.2024    
-- -- Insulation (2)  03.30.2024    
-- -- Inspection (Insulation) (1)  03.30.2024    
-- -- Inspection (Electric Service) (0)  04.11.2024    
-- -- Set Electric Meter (0)  05.02.2024    
-- -- Inspection (Main Sewer Line) (0)  03.21.2024    
-- -- Inspection (Main Water Line) (0)  03.21.2024    
-- -- Order Interior Doors & Trim (0)  04.12.2024    
-- -- Drywall (Hang) (4) *   03.30.2024    
-- -- Loan Approval (0)  06.11.2024     Melissa Hoover, Mission Mortgage (96% LTV)
-- -- Deed Preparation (0)  05.20.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   04.06.2024     In process 4/3
-- -- Paint 1 (1)  04.06.2024    
-- -- Garage Door (0)  05.08.2024    
-- -- House Numbers (0)  05.15.2024    
-- -- Mailbox (0)  05.18.2024    
-- -- Cabinet Installation (2) *   04.19.2024     Install April 19
-- -- Granite Installation (1) *   04.27.2024    
-- -- Interior Trim - Install (3)  04.19.2024     In process 4/17
-- -- Order Plumbing / Lighting Fixtures (0)  05.13.2024    
-- -- Interior Trim - Paint (1)  05.04.2024    
-- -- Luxury Vinyl Plank (3) *   05.11.2024     In process 5/8
-- -- Luxury Vinyl Tile (0)  05.11.2024     In process 5/8
-- -- Paint 2 (3)  05.11.2024    
-- -- Cover Floors (1)  06.01.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  05.13.2024    
-- -- Shoe Moulding (0)  05.18.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  06.01.2024     In process 5/29
-- -- Install Coded Lockbox (add extra keys) (0)  06.05.2024    
-- -- Pay Water / Sewer Taps (0)  05.16.2024    
-- -- Set Water Meter (0)  05.30.2024    
-- -- Electric Trim Out (3)  06.01.2024     Standard Black. In process 5/29
-- -- Ceiling Fans (0)  05.26.2024     Master
-- -- HVAC Trim Out (1)  06.05.2024    
-- -- Blower Door Test (1)  06.17.2024     6/6
-- -- Plumbing Trim Out (2)  06.12.2024     Standard Black. In process 6/9
-- -- Install Appliances (0) *   06.12.2024     Leisa- being delivered Monday, June 10th
-- -- Paint 3 (2) *   05.15.2024    
-- -- Carpet (2)  05.11.2024    
-- -- Appraiser Confirms Construction Completion (0)  06.20.2024    
-- -- Inspection (Final HVAC) (1)  06.17.2024    
-- -- Inspection (Final Plumbing) (1)  06.17.2024    
-- -- Inspection (Final Electric) (1)  06.17.2024    
-- -- Inspection (Final Building) (2) *   06.17.2024     Thurs, June 13
-- -- Pre Walk Through (0)  06.17.2024    
-- -- Stain Hardwood Stairs (1)  06.01.2024     In process 5/29
-- -- Cleaning (1)  06.17.2024    
-- -- Certificate of Occupancy (1) *   06.20.2024    
-- -- C.O. to Lender (0)  06.20.2024    
-- -- Schedule Closing (0)  06.20.2024    
-- -- Buyer Walk Through (1)  06.18.2024     Mon, Jun 17 at 4:00 PM
-- -- Payment for Upgrades (0)  06.20.2024    
-- -- Keys to Settlement Agent (0)  06.10.2024    
-- -- Review Settlement Statement (0)  06.21.2024    
-- -- Jerry Signs Closing Documents (0)  06.13.2024    
-- -- Request Trash Tote From POA Manager (0)  06.13.2024    
-- -- Closing (1)  06.21.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  06.24.2024