1 87 73 ADDR
CONGERS-2 - 51  ::  1398 Appaloosa Court
[ BUILD: 20231956 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Holly - 706-399-4412
--   --   There’s a bird nest in the upper vent of this home Can someone pressure wash the back of the house?
--   --   Raise master shower head connection
--   --   Few kitchen cabinets need hardware
--   --   Is the farmhouse sink here?
--   --   Staircase going to upper floor has a very large squeak on the second set of steps at the bottom
--   --   Finish trim in garage George
--   --   Caulk farmhouse sink
--   --   Bottom stair going to upper level is very squeaky Tom
--   --   Set of appliances here also CJ
--   --   Add scribe to farmhouse sink Fred - on order
--   --   Clean out back bonus room, and garage Jill
--   --   Paint risers to bedroom level black
--   --   Remove ladder from master closet
--   --   Is there something missing below the garage door?
--   --   All door hardware needs installed.
--   --   Correction by qualified roofing contractor of loose trim and incorrectly terminated seams (reference 1.1) Front Porch Awning- Tom will take a look and tell Joel
--   --   Repair or replace range door (2.3) Leisa initiated a service call
--   --   seller request engineer approved repair plan or have repair evaluated and approved (6.2) Roof Truss- Tom
--   --   Adjust master bedroom door for better operation George
--   --   Adjust master bedroom door for better operation
--   --   Are the new fridges the exact same size as the previous ones? There seems to be extra space on each side of the refrigerator. Kate will talk to Kimberly
--   --   Call mirror and bath light look extremely close together Hall
--   --   Remove glue from master bathroom Drywaller removing 7/15
--   --   Few paint touchups needed on front of house and in closets
--   --   Replace light fixture in hall bath
--   --   Remove glue pantry door
--   --   touch up scratches on kitchen cabinets
--   --   clean off deck Lynn
--   --   adjust smaller BR closet door Jill
--   --   smaller bedroom one piece of plan cut too short. Denny 7/18
--   --   clean half bath toilet and check flush Lynn & Munzur
--   --   tighten half bath towel ring Paul
--   --   adjust water pressure
--   --   Master Bath- clean paint off light fixtures Lynn
--   --   Adjust laundry door Jill
--   --   Adjust laundry door
--   --   cover hole in bonus bath floor Tom
--   --   Bonus Room- fill nail hole from bathroom frmaing
--   --   nail down plastic in HVAC closet
--   --   coal exterior ground of cigarettes Jill
--   --   extend splash bloacks
--   --   extend splash blocks Tom
--   --   pressure wash front and back Buddy. I think done?
--   --   PLEASE DONT REMOVE OR HARM BIRDS NESTS
--   --   Adjust Master BR door
--   --   remove cabinet paper Jill
--   --   pvc board around the garage door on outside needs work davenport
--   --   Both sides of the slatting door on the deck on the outside is spongy feeling at the bottom where the siding is Davenport
--   --   Adjust front door lock Difficult to lock deadbolt - Paul
--   --   Loose LVP plank Denny
--   --   Dryer plug - beeping
-- -- Ratified Contract? (0)  04.08.2024    
    Farmhouse sink  
    Three draw base in place of 36”  
    Master vanity center drawer stack  
    Painted stairs to bedroom level- treads and risers painted black  
    Expanded driveway  
    Ceiling, fan living room  
    Shower Door with black trim  
    Comfort Height Toilets  
    Farmhouse Plumbing Package  
    Vinyl Wrap over insulation in bonus room  
    LVP upstairs hallway and bedrooms  
    Amendment to increase price by $9,635  
-- -- $2500 Deposit Received (0)  04.08.2024    
-- -- Association Packet Requested (0)  04.08.2024    
-- -- Association Packet Received (0)  04.16.2024    
-- -- Selections Meeting (0)  04.08.2024    
-- -- Selections Sheet Signed (0)  04.16.2024     4/12: sent to Lauren for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  04.20.2024     4/16: sent to Lauren
-- -- Deposit For Upgrades Received (0)  04.21.2024     4/20: sent to Jerry
-- -- Building Permit (30)  01.04.2024    
-- -- Order Roof & Floor Trusses (1)  02.12.2024    
-- -- Order Windows & Doors (0)  02.12.2024    
-- -- Stake Out Home (1)  01.04.2024    
-- -- Excavate (2)  01.04.2024    
-- -- Inspection (Footers) (1)  01.04.2024    
-- -- Inspection (Concrete Wall) (1)  01.04.2024    
-- -- Pour Footers (1) *   01.04.2024    
-- -- Set Forms (2)  01.04.2024    
-- -- Pour Foundation Walls (1)  01.04.2024    
-- -- Plumb Slab (2)  01.07.2024    
-- -- Inspection (Plumbing Under Slab) (1)  02.08.2024    
-- -- Inspection (Conduit Under Slab) (1)  02.08.2024    
-- -- Prepare Slab (1)  02.08.2024    
-- -- Inspection (Slab) (1)  02.08.2024    
-- -- Inspection (Drain Tile) (0)  02.08.2024    
-- -- Pour Slab (1) *   02.08.2024    
-- -- Settlement Agent Confirmed (0)  04.26.2024    
-- -- Framing I (9)  02.15.2024    
-- -- Order Steps (0)  03.11.2024    
-- -- Order Tubs / Showers (0)  03.11.2024    
-- -- Framing II (8)  02.19.2024    
-- -- Framing III (8) *   02.22.2024    
-- -- Verify Window & Roof Structure (0)  03.04.2024    
-- -- Install Stairs (0)  03.11.2024    
-- -- Windows & Doors (0) *   04.03.2024    
-- -- House Number and Status in Window (0)  04.03.2024    
-- -- Roofing (0) *   03.11.2024    
-- -- Order Cabinets (0)  04.22.2024    
-- -- Order Appliances (0)  06.10.2024     STANDARD
-- -- Deck (0)  04.03.2024    
-- -- Gutters (0)  05.26.2024    
-- -- Driveway (0) *   05.22.2024    
-- -- Patio (0)  04.03.2024    
-- -- Privacy Divider / Fence (0)  05.26.2024    
-- -- Sod / Seed / Landscaping (0)  07.22.2024     All but front small areas between concrete
-- -- HVAC Rough In (4)  03.16.2024     in process 3/9
-- -- Inspection (Rough In HVAC) (1)  04.24.2024    
-- -- Rough In Microwave Vent (0)  03.20.2024    
-- -- Plumbing Rough In (4)  04.17.2024     In process 4/12
-- -- Inspection (Rough In Plumbing) (1)  04.24.2024    
-- -- Electric Rough In (4)  04.19.2024    
-- -- Inspection (Rough In Electric) (1)  04.24.2024    
-- -- Inspection (Deck Piers) (0)  04.24.2024    
-- -- Inspection (Framing) (1) *   04.24.2024    
-- -- Exterior Vinyl (0) *   05.06.2024    
-- -- Exterior Stone (0)  05.22.2024    
-- -- Insulation (2) *   04.24.2024    
-- -- Inspection (Insulation) (1)  05.02.2024    
-- -- Inspection (Electric Service) (0)  05.20.2024    
-- -- Set Electric Meter (0) *   05.30.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  06.05.2024    
-- -- Drywall (Hang) (4) *   05.04.2024     Stocked 5/1
-- -- Loan Approval (0)  07.17.2024     Garrett Locklear, Locklear Lending (100% VA)
-- -- Deed Preparation (0)  06.24.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   05.18.2024     In process 5/15
-- -- Paint 1 (1)  05.22.2024    
-- -- Garage Door (0) *   05.26.2024    
-- -- House Numbers (0)  06.22.2024    
-- -- Mailbox (0)  06.22.2024    
-- -- Cabinet Installation (2) *   05.18.2024     Install May 17
-- -- Granite Installation (1) *   06.01.2024    
-- -- Interior Trim - Install (3) *   06.05.2024     In process 6/1
-- -- Order Plumbing / Lighting Fixtures (0)  06.10.2024    
-- -- Interior Trim - Paint (1)  06.05.2024    
-- -- Luxury Vinyl Plank (3) *   06.15.2024     In process 6/12
-- -- Luxury Vinyl Tile (0)  06.15.2024    
-- -- Paint 2 (3)  06.09.2024    
-- -- Cover Floors (1)  07.08.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  06.17.2024    
-- -- Shoe Moulding (0)  06.22.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   07.10.2024     Few mirrors and all door hardware needs installed
-- -- Install Coded Lockbox (add extra keys) (0)  07.17.2024    
-- -- Pay Water / Sewer Taps (0)  06.10.2024    
-- -- Set Water Meter (0) *   06.20.2024    
-- -- Electric Trim Out (3)  07.06.2024     Standard Black
-- -- Ceiling Fans (0)  07.06.2024     Master
-- -- HVAC Trim Out (1)  07.06.2024    
-- -- Blower Door Test (1)  07.08.2024    
-- -- Plumbing Trim Out (2)  07.06.2024     Farmhouse Black
-- -- Install Appliances (0) *   07.06.2024    
-- -- Paint 3 (2) *   06.15.2024    
-- -- Carpet (2)  06.15.2024    
-- -- Appraiser Confirms Construction Completion (0)  07.17.2024    
-- -- Inspection (Final HVAC) (1)  07.08.2024    
-- -- Inspection (Final Plumbing) (1)  07.08.2024    
-- -- Inspection (Final Electric) (1)  07.08.2024    
-- -- Inspection (Final Building) (2) *   07.08.2024     Mon, July 8
-- -- Pre Walk Through (0)  07.17.2024    
-- -- Stain Hardwood Stairs (1)  07.10.2024     In process 7/6
-- -- Cleaning (1)  07.15.2024     Lynn starting after completion of 50. Lynn is planning to start tomorrow?
-- -- Certificate of Occupancy (1) *   07.10.2024    
-- -- C.O. to Lender (0)  07.10.2024    
-- -- Schedule Closing (0)  07.17.2024    
-- -- Buyer Walk Through (1)  07.17.2024     7/15 at 11am
-- -- Payment for Upgrades (0)  07.17.2024    
-- -- Keys to Settlement Agent (0)  07.17.2024    
-- -- Review Settlement Statement (0)  07.22.2024    
-- -- Jerry Signs Closing Documents (0)  06.13.2024    
-- -- Request Trash Tote From POA Manager (0)  07.01.2024    
-- -- Closing (1)  07.18.2024     Wed, July 17 - Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  07.24.2024