| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Farmhouse sink | ||||
| Three draw base in place of 36” | ||||
| Master vanity center drawer stack | ||||
| Painted stairs to bedroom level- treads and risers painted black | ||||
| Expanded driveway | ||||
| Ceiling, fan living room | ||||
| Shower Door with black trim | ||||
| Comfort Height Toilets | ||||
| Farmhouse Plumbing Package | ||||
| Vinyl Wrap over insulation in bonus room | ||||
| LVP upstairs hallway and bedrooms | ||||
| Amendment to increase price by $9,635 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 01.04.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 01.04.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 02.08.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 02.08.2024 | ||
| -- | -- | Inspection (Slab) (1) 02.08.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 02.08.2024 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 04.24.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 04.24.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 04.24.2024 | ||
| -- | -- | Inspection (Framing) (1) * 04.24.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 04.24.2024 | ||
| -- | -- | Inspection (Insulation) (1) 05.02.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 05.20.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Final HVAC) (0) 07.08.2024 | ||
| -- | -- | Inspection (Final Plumbing) (0) 07.08.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 07.08.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 07.08.2024 | Mon, July 8 | |