CONGERS-2 - 70  ::  1399 Appaloosa Court
[ BUILD: 20232176 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Paint touchup throughout
--   --   We need hardwood treads installed to the upper level Hardwood treads are in the garage
--   --   Confirm, the deck is at 12:18 In process 6/5
--   --   Cover carpet
--   --   Missing handle on one kitchen cabinet fred is aware
--   --   Patch a few holes and garage trim Jill
--   --   Add a few more rocks to meet the landscaping
--   --   Can we do another color besides white on the kitchen island? For the electric outlet
--   --   Steps are wet and stopped back by to get keys
--   --   CODED LOCKBOX 7070
--   --   Few lightbulbs needed In bonus bathroom - Jill
--   --   Powder bathroom light fixture needed Electrician
--   --   Clean out garage Jill
--   --   Install window screens Jill
--   --   Two additional exterior lights in closet under stairs Jill
--   --   New transition strip needed on second set of stairs at landing. Has gashes in it. Eric
--   --   Adjust upstairs, closet doors Jill
--   --   Please flip fan blades to black in master bedroom. And Jill, can you please let electricians know this for all future fans? Electrician
--   --   Staying on stairs looks incredible! Way to go Painter!
--   --   Painter has repairs in powder bathroom Painter
--   --   Home inspection - August 14 at 1pm
--   --   Can the corner of the garage door be wrapped a little bit bit better? Concrete is exposed. davenport
--   --   Cable box cover needed Tom
--   --   Clean or repaint attic cover Painter
--   --   A few scratches on bonus bathtub Jill
--   --   Is there an extra shelf on the top of the cabinets? Jill
--   --   Clean up paint in foyer on floors Painter
--   --   Install screens to patio doors Tom
--   --   Install bonus bathroom drain
--   --   Bulge in siding on right side of the house Davenport
--   --   Gaps in rear decking, lifted and cracking deck boards Tom
--   --   Add cap to radon pipe
--   --   Paint edges of interior doors Painter
--   --   Rear bedroom window, bottom sash, not connected to cord Tom
--   --   Right side bedroom window missing - does not function properly
--   --   Shower door does not open and close as intended Joe will look at it
--   --   Basement bath tub overflow cap is missing Plumber
--   --   Right side bedroom window spring missing - does not function properly Tom
--   --   Paint touch up ceiling bonus room Painter
--   --   Does drain in front yard need to be uncovered? Tom
--   --   Paint touchup throughout Painter
--   --   Touch up ceiling bonus room Painter - bathroom - skim coat
--   --   Overflow drain bathtub
--   --   Vacuum floors in master closet Jill
--   --   Sweep floors in master bath Jill
--   --   C clean love LVT laundry- pencil marks Remove pencil marks on floor by vent
--   --   Missing screw light switch laundry Jill
--   --   Touch up corners tray ceiling Painter
--   --   Loose shower head pipe master Plumber
--   --   Scuffs island trim piece Jill will look at it
--   --   Buyer Number- 770-359-8183
--   --   Few replacement boards need to be screwed down to the deck and maybe trimmed?
--   --   Messy footprints in the bonus room and bonus bathroom
--   --   Secure dishwasher CJ
-- -- Ratified Contract? (0)  04.04.2024    
-- -- $2500 Deposit Received (0)  04.16.2024    
-- -- Association Packet Requested (0)  04.04.2024    
-- -- Association Packet Received (0)  04.05.2024    
-- -- Selections Meeting (0)  04.26.2024    
-- -- Selections Sheet Signed (0)  04.28.2024     4/25: sent to Pete
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  05.09.2024     5/9: sent to Jerry
-- -- Deposit For Upgrades Received (0)  05.09.2024    
-- -- Building Permit (30)  02.08.2024    
-- -- Order Roof & Floor Trusses (1)  04.18.2024    
-- -- Order Windows & Doors (0)  04.27.2024    
-- -- Stake Out Home (1)  01.04.2024    
-- -- Excavate (2)  01.04.2024    
-- -- Inspection (Footers) (1)  02.08.2024    
-- -- Inspection (Concrete Wall) (1)  02.08.2024    
-- -- Pour Footers (1)  02.08.2024    
-- -- Set Forms (2)  02.08.2024    
-- -- Pour Foundation Walls (1)  02.08.2024    
-- -- Plumb Slab (2)  03.14.2024    
-- -- Inspection (Plumbing Under Slab) (1)  03.14.2024    
-- -- Inspection (Conduit Under Slab) (1)  03.14.2024    
-- -- Prepare Slab (1)  03.14.2024    
-- -- Inspection (Slab) (1)  03.14.2024    
-- -- Inspection (Drain Tile) (0)  03.14.2024    
-- -- Pour Slab (1) *   04.18.2024    
-- -- Settlement Agent Confirmed (0)  04.19.2024    
-- -- Framing I (9)  04.18.2024    
-- -- Order Steps (0)  04.18.2024    
-- -- Order Tubs / Showers (0)  04.18.2024    
-- -- Framing II (8)  04.18.2024    
-- -- Framing III (8) *   04.18.2024    
-- -- Verify Window & Roof Structure (0)  04.25.2024    
-- -- Install Stairs (0)  03.14.2024    
-- -- Windows & Doors (0)  04.27.2024    
-- -- House Number and Status in Window (0)  04.27.2024    
-- -- Roofing (0)  04.27.2024    
-- -- Order Cabinets (0)  06.07.2024    
-- -- Order Appliances (0)  07.17.2024     Ordered 5/28
-- -- Deck (0)  07.17.2024    
-- -- Gutters (0)  06.22.2024    
-- -- Driveway (0)  07.17.2024    
-- -- Patio (0)  05.08.2024    
-- -- Privacy Divider / Fence (0)  07.24.2024     in process 7/20
-- -- Sod / Seed / Landscaping (0)  07.24.2024    
-- -- HVAC Rough In (4)  04.27.2024     In process 4/24
-- -- Inspection (Rough In HVAC) (1)  05.18.2024    
-- -- Rough In Microwave Vent (0)  04.27.2024    
-- -- Plumbing Rough In (4)  05.11.2024     In process 5/8
-- -- Inspection (Rough In Plumbing) (1)  05.18.2024    
-- -- Electric Rough In (4)  05.11.2024    
-- -- Inspection (Rough In Electric) (1)  05.18.2024    
-- -- Inspection (Deck Piers) (0)  05.18.2024    
-- -- Inspection (Framing) (1)  05.18.2024    
-- -- Exterior Vinyl (0) *   06.13.2024     In process 6/5
-- -- Exterior Stone (0)  07.07.2024     In process 6/26
-- -- Insulation (2)  05.18.2024    
-- -- Inspection (Insulation) (1)  05.22.2024    
-- -- Inspection (Electric Service) (0)  07.11.2024    
-- -- Set Electric Meter (0)  08.06.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  06.10.2024    
-- -- Drywall (Hang) (4) *   05.26.2024     In process 5/22
-- -- Loan Approval (0)  04.26.2024     JoDee (100% VA)
-- -- Deed Preparation (0)  07.28.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   06.05.2024     In process 6/1
-- -- Paint 1 (1)  06.05.2024    
-- -- Garage Door (0)  06.22.2024    
-- -- House Numbers (0)  07.24.2024    
-- -- Mailbox (0)  07.17.2024    
-- -- Cabinet Installation (2) *   07.07.2024     Mon, July 1
-- -- Granite Installation (1) *   07.07.2024    
-- -- Interior Trim - Install (3)  06.15.2024     In process 6/12
-- -- Order Plumbing / Lighting Fixtures (0)  07.08.2024    
-- -- Interior Trim - Paint (1)  06.26.2024    
-- -- Luxury Vinyl Plank (3) *   06.30.2024     In process 6/26
-- -- Luxury Vinyl Tile (0)  06.30.2024     In process 6/26
-- -- Paint 2 (3)  06.22.2024    
-- -- Cover Floors (1)  07.17.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  07.11.2024    
-- -- Shoe Moulding (0)  07.07.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  07.24.2024     In process 7/20
-- -- Install Coded Lockbox (add extra keys) (0)  07.25.2024    
-- -- Pay Water / Sewer Taps (0)  08.05.2024     Jerry paying 7/25
-- -- Set Water Meter (0)  08.05.2024    
-- -- Electric Trim Out (3)  07.20.2024    
-- -- Ceiling Fans (0)  07.26.2024     Master
-- -- HVAC Trim Out (1)  08.07.2024    
-- -- Blower Door Test (1)  08.08.2024    
-- -- Plumbing Trim Out (2)  07.26.2024     On site 7/24
-- -- Install Appliances (0) *   07.26.2024     On site 7/17
-- -- Paint 3 (2) *   07.17.2024    
-- -- Carpet (2)  06.30.2024    
-- -- Appraiser Confirms Construction Completion (0)  08.22.2024     Tell Sara Gordon, JoDee Lambert
-- -- Inspection (Final HVAC) (1)  08.12.2024    
-- -- Inspection (Final Plumbing) (1)  08.12.2024    
-- -- Inspection (Final Electric) (1)  08.12.2024    
-- -- Inspection (Final Building) (2) *   08.12.2024     Friday, August 9
-- -- Pre Walk Through (0)  07.29.2024     Completed 7/29
-- -- Stain Hardwood Stairs (1)  07.24.2024     In process 7/20
-- -- Cleaning (1)  08.12.2024     In process 8/10
-- -- Certificate of Occupancy (1) *   08.15.2024    
-- -- C.O. to Lender (0)  08.15.2024     Sara Gordon, JoDee Lambert
-- -- Schedule Closing (0)  08.19.2024    
-- -- Buyer Walk Through (1)  08.18.2024     Sunday, Aug 18, 2PM
-- -- Payment for Upgrades (0)  08.08.2024    
-- -- Keys to Settlement Agent (0)  08.08.2024    
-- -- Review Settlement Statement (0)  08.13.2024    
-- -- Jerry Signs Closing Documents (0)  08.15.2024    
-- -- Request Trash Tote From POA Manager (0)  08.08.2024    
-- -- Closing (1)  08.24.2024     Brittany @ West View Title, Thu Aug 22
-- -- Remove Coded Lockbox (0)  08.26.2024