Patch a few holes and garage trim |
Davenport |
|
-- |
-- |
Buyer Number- 770-359-8183 |
|
|
|
-- |
-- |
We need hardwood treads installed to the upper level |
Hardwood treads are in the garage |
|
-- |
-- |
Confirm, the deck is at 12:18 |
In process 6/5 |
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Missing handle on one kitchen cabinet |
fred is aware |
|
-- |
-- |
Add a few more rocks to meet the landscaping |
|
|
-- |
-- |
Can we do another color besides white on the kitchen island? For the electric outlet |
|
|
-- |
-- |
Steps are wet and stopped back by to get keys |
|
|
-- |
-- |
CODED LOCKBOX 7070 |
|
|
-- |
-- |
Few lightbulbs needed |
In bonus bathroom - Jill |
|
-- |
-- |
Powder bathroom light fixture needed |
Electrician |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Two additional exterior lights in closet under stairs |
Jill |
|
-- |
-- |
New transition strip needed on second set of stairs at landing. Has gashes in it. |
Eric |
|
-- |
-- |
Adjust upstairs, closet doors |
Jill |
|
-- |
-- |
Please flip fan blades to black in master bedroom. And Jill, can you please let electricians know this for all future fans? |
Electrician |
|
-- |
-- |
Staying on stairs looks incredible! Way to go Painter! |
|
|
-- |
-- |
Painter has repairs in powder bathroom |
Painter |
|
-- |
-- |
Home inspection - August 14 at 1pm |
|
|
-- |
-- |
Can the corner of the garage door be wrapped a little bit bit better? Concrete is exposed. |
davenport |
|
-- |
-- |
Cable box cover needed |
Tom |
|
-- |
-- |
Clean or repaint attic cover |
Painter |
|
-- |
-- |
A few scratches on bonus bathtub |
Jill |
|
-- |
-- |
Is there an extra shelf on the top of the cabinets? |
Jill |
|
-- |
-- |
Clean up paint in foyer on floors |
Painter |
|
-- |
-- |
Install screens to patio doors |
Tom |
|
-- |
-- |
Install bonus bathroom drain |
|
|
-- |
-- |
Bulge in siding on right side of the house |
Davenport |
|
-- |
-- |
Gaps in rear decking, lifted and cracking deck boards |
Tom |
|
-- |
-- |
Add cap to radon pipe |
|
|
-- |
-- |
Paint edges of interior doors |
Painter |
|
-- |
-- |
Rear bedroom window, bottom sash, not connected to cord |
Tom |
|
-- |
-- |
Right side bedroom window missing - does not function properly |
|
|
-- |
-- |
Shower door does not open and close as intended |
Joe will look at it |
|
-- |
-- |
Basement bath tub overflow cap is missing |
Plumber |
|
-- |
-- |
Right side bedroom window spring missing - does not function properly |
Tom |
|
-- |
-- |
Paint touch up ceiling bonus room |
Painter |
|
-- |
-- |
Does drain in front yard need to be uncovered? |
Tom |
|
-- |
-- |
Paint touchup throughout |
Painter |
|
-- |
-- |
Touch up ceiling bonus room |
Painter - bathroom - skim coat |
|
-- |
-- |
Overflow drain bathtub |
|
|
-- |
-- |
Vacuum floors in master closet |
Jill |
|
-- |
-- |
Sweep floors in master bath |
Jill |
|
-- |
-- |
C clean love LVT laundry- pencil marks |
Remove pencil marks on floor by vent |
|
-- |
-- |
Missing screw light switch laundry |
Jill |
|
-- |
-- |
Touch up corners tray ceiling |
Painter |
|
-- |
-- |
Loose shower head pipe master |
Plumber |
|
-- |
-- |
Scuffs island trim piece |
Jill will look at it |
|
-- |
-- |
Few replacement boards need to be screwed down to the deck and maybe trimmed? |
|
|
-- |
-- |
Messy footprints in the bonus room and bonus bathroom |
|
|
-- |
-- |
Secure dishwasher |
CJ |
|
-- |
-- |
Ratified Contract? (0)
04.04.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0)
04.16.2024 |
|
|
-- |
-- |
Association Packet Requested (0)
04.04.2024 |
|
|
-- |
-- |
Association Packet Received (0)
04.05.2024 |
|
|
-- |
-- |
Selections Meeting (0)
04.26.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0)
04.28.2024 |
4/25: sent to Pete |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
05.09.2024 |
5/9: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0)
05.09.2024 |
|
|
-- |
-- |
Building Permit (30)
02.08.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
04.18.2024 |
|
|
-- |
-- |
Order Windows & Doors (0)
04.27.2024 |
|
|
-- |
-- |
Stake Out Home (1)
01.04.2024 |
|
|
-- |
-- |
Excavate (2)
01.04.2024 |
|
|
-- |
-- |
Inspection (Footers) (1)
02.08.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
02.08.2024 |
|
|
-- |
-- |
Pour Footers (1)
02.08.2024 |
|
|
-- |
-- |
Set Forms (2)
02.08.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1)
02.08.2024 |
|
|
-- |
-- |
Plumb Slab (2)
03.14.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
03.14.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
03.14.2024 |
|
|
-- |
-- |
Prepare Slab (1)
03.14.2024 |
|
|
-- |
-- |
Inspection (Slab) (1)
03.14.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
03.14.2024 |
|
|
-- |
-- |
Pour Slab (1)
04.18.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
04.19.2024 |
|
|
-- |
-- |
Framing I (9)
04.18.2024 |
|
|
-- |
-- |
Order Steps (0)
04.18.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0)
04.18.2024 |
|
|
-- |
-- |
Framing II (8)
04.18.2024 |
|
|
-- |
-- |
Framing III (8)
04.18.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
04.25.2024 |
|
|
-- |
-- |
Install Stairs (0)
03.14.2024 |
|
|
-- |
-- |
Windows & Doors (0)
04.27.2024 |
|
|
-- |
-- |
House Number and Status in Window (0)
04.27.2024 |
|
|
-- |
-- |
Roofing (0)
04.27.2024 |
|
|
-- |
-- |
Order Cabinets (0)
06.07.2024 |
|
|
-- |
-- |
Order Appliances (0)
07.17.2024 |
Ordered 5/28 |
|
-- |
-- |
Deck (0)
07.17.2024 |
|
|
-- |
-- |
Gutters (0)
06.22.2024 |
|
|
-- |
-- |
Driveway (0)
07.17.2024 |
|
|
-- |
-- |
Patio (0)
05.08.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
07.24.2024 |
in process 7/20 |
|
-- |
-- |
Sod / Seed / Landscaping (0)
07.24.2024 |
|
|
-- |
-- |
HVAC Rough In (4)
04.27.2024 |
In process 4/24 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
05.18.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
04.27.2024 |
|
|
-- |
-- |
Plumbing Rough In (4)
05.11.2024 |
In process 5/8 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
05.18.2024 |
|
|
-- |
-- |
Electric Rough In (4)
05.11.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
05.18.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
05.18.2024 |
|
|
-- |
-- |
Inspection (Framing) (1)
05.18.2024 |
|
|
-- |
-- |
Exterior Vinyl (0)
06.13.2024 |
In process 6/5 |
|
-- |
-- |
Exterior Stone (0)
07.07.2024 |
In process 6/26 |
|
-- |
-- |
Insulation (2)
05.18.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1)
05.22.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
07.11.2024 |
|
|
-- |
-- |
Set Electric Meter (0)
08.06.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
06.10.2024 |
|
|
-- |
-- |
Drywall (Hang) (4)
05.26.2024 |
In process 5/22 |
|
-- |
-- |
Loan Approval (0)
04.26.2024 |
JoDee (100% VA) |
|
-- |
-- |
Deed Preparation (0)
07.28.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
06.05.2024 |
In process 6/1 |
|
-- |
-- |
Paint 1 (1)
06.05.2024 |
|
|
-- |
-- |
Garage Door (0)
06.22.2024 |
|
|
-- |
-- |
House Numbers (0)
07.24.2024 |
|
|
-- |
-- |
Mailbox (0)
07.17.2024 |
|
|
-- |
-- |
Cabinet Installation (2)
07.07.2024 |
Mon, July 1 |
|
-- |
-- |
Granite Installation (1)
07.07.2024 |
|
|
-- |
-- |
Interior Trim - Install (3)
06.15.2024 |
In process 6/12 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
07.08.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1)
06.26.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
06.30.2024 |
In process 6/26 |
|
-- |
-- |
Luxury Vinyl Tile (0)
06.30.2024 |
In process 6/26 |
|
-- |
-- |
Paint 2 (3)
06.22.2024 |
|
|
-- |
-- |
Cover Floors (1)
07.17.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
07.11.2024 |
|
|
-- |
-- |
Shoe Moulding (0)
07.07.2024 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
07.24.2024 |
In process 7/20 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
07.25.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
08.05.2024 |
Jerry paying 7/25 |
|
-- |
-- |
Set Water Meter (0)
08.05.2024 |
|
|
-- |
-- |
Electric Trim Out (3)
07.20.2024 |
|
|
-- |
-- |
Ceiling Fans (0)
07.26.2024 |
Master |
|
-- |
-- |
HVAC Trim Out (1)
08.07.2024 |
|
|
-- |
-- |
Blower Door Test (1)
08.08.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2)
07.26.2024 |
On site 7/24 |
|
-- |
-- |
Install Appliances (0)
07.26.2024 |
On site 7/17 |
|
-- |
-- |
Paint 3 (2)
07.17.2024 |
|
|
-- |
-- |
Carpet (2)
06.30.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
08.22.2024 |
Tell Sara Gordon, JoDee Lambert |
|
-- |
-- |
Inspection (Final HVAC) (1)
08.12.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
08.12.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
08.12.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2)
08.12.2024 |
Friday, August 9 |
|
-- |
-- |
Pre Walk Through (0)
07.29.2024 |
Completed 7/29 |
|
-- |
-- |
Stain Hardwood Stairs (1)
07.24.2024 |
In process 7/20 |
|
-- |
-- |
Cleaning (1)
08.12.2024 |
In process 8/10 |
|
-- |
-- |
Certificate of Occupancy (1)
08.15.2024 |
|
|
-- |
-- |
C.O. to Lender (0)
08.15.2024 |
Sara Gordon, JoDee Lambert |
|
-- |
-- |
Schedule Closing (0)
08.19.2024 |
|
|
-- |
-- |
Buyer Walk Through (1)
08.18.2024 |
Sunday, Aug 18, 2PM |
|
-- |
-- |
Payment for Upgrades (0)
08.08.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
08.08.2024 |
|
|
-- |
-- |
Review Settlement Statement (0)
08.13.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
08.15.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
08.08.2024 |
|
|
-- |
-- |
Closing (1)
08.24.2024 |
Brittany @ West View Title, Thu Aug 22 |
|
-- |
-- |
Remove Coded Lockbox (0)
08.26.2024 |
|
|