37 ADDR
CONGERS-2 - 70  ::  1399 Appaloosa Court
[ BUILD: 20232176 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
Paint touchup throughout
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
We need hardwood treads installed to the upper level Hardwood treads are in the garage
Confirm, the deck is at 12:18 In process 6/5
Cover carpet
Missing handle on one kitchen cabinet fred is aware
Patch a few holes and garage trim Jill
Add a few more rocks to meet the landscaping
Can we do another color besides white on the kitchen island? For the electric outlet
Steps are wet and stopped back by to get keys
CODED LOCKBOX 7070
Few lightbulbs needed In bonus bathroom - Jill
Powder bathroom light fixture needed Electrician
Clean out garage Jill
Install window screens Jill
Two additional exterior lights in closet under stairs Jill
New transition strip needed on second set of stairs at landing. Has gashes in it. Eric
Adjust upstairs, closet doors Jill
Please flip fan blades to black in master bedroom. And Jill, can you please let electricians know this for all future fans? Electrician
Staying on stairs looks incredible! Way to go Painter!
Painter has repairs in powder bathroom Painter
Home inspection - August 14 at 1pm
Can the corner of the garage door be wrapped a little bit bit better? Concrete is exposed. davenport
Cable box cover needed Tom
Clean or repaint attic cover Painter
A few scratches on bonus bathtub Jill
Is there an extra shelf on the top of the cabinets? Jill
Clean up paint in foyer on floors Painter
Install screens to patio doors Tom
Install bonus bathroom drain
Bulge in siding on right side of the house Davenport
Gaps in rear decking, lifted and cracking deck boards Tom
Add cap to radon pipe
Paint edges of interior doors Painter
Rear bedroom window, bottom sash, not connected to cord Tom
Right side bedroom window missing - does not function properly
Shower door does not open and close as intended Joe will look at it
Basement bath tub overflow cap is missing Plumber
Right side bedroom window spring missing - does not function properly Tom
Paint touch up ceiling bonus room Painter
Does drain in front yard need to be uncovered? Tom
Paint touchup throughout Painter
Touch up ceiling bonus room Painter - bathroom - skim coat
Overflow drain bathtub
Vacuum floors in master closet Jill
Sweep floors in master bath Jill
C clean love LVT laundry- pencil marks Remove pencil marks on floor by vent
Missing screw light switch laundry Jill
Touch up corners tray ceiling Painter
Loose shower head pipe master Plumber
Scuffs island trim piece Jill will look at it
Buyer Number- 770-359-8183
Few replacement boards need to be screwed down to the deck and maybe trimmed?
Messy footprints in the bonus room and bonus bathroom
Secure dishwasher CJ
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Luxury Vinyl Plank in Bonus Room  
    Oak steps to bedroom level  
    Shower Door, heavy glass with black trim  
    Expanded Driveway  
    Expanded 12 x 18 deck  
    Amendment to increase price by $25,550  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  04.04.2024    
-- -- $2500 Deposit Received (0)  04.16.2024    
-- -- Association Packet Requested (0)  04.04.2024    
-- -- Association Packet Received (0)  04.05.2024    
-- -- Selections Meeting (0)  04.26.2024    
-- -- Selections Sheet Signed (0)  04.28.2024     4/25: sent to Pete
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  05.09.2024     5/9: sent to Jerry
-- -- Deposit For Upgrades Received (0)  05.09.2024    
-- -- Building Permit (30) *   02.08.2024    
-- -- Order Roof & Floor Trusses (1)  04.18.2024    
-- -- Order Windows & Doors (0)  04.27.2024    
-- -- Stake Out Home (1)  01.04.2024    
-- -- Excavate (2)  01.04.2024    
-- -- Inspection (Footers) (1)  02.08.2024    
-- -- Inspection (Concrete Wall) (1)  02.08.2024    
-- -- Pour Footers (1) *   02.08.2024    
-- -- Set Forms (2)  02.08.2024    
-- -- Pour Foundation Walls (1)  02.08.2024    
-- -- Plumb Slab (2)  03.14.2024    
-- -- Inspection (Plumbing Under Slab) (1)  03.14.2024    
-- -- Inspection (Conduit Under Slab) (1)  03.14.2024    
-- -- Prepare Slab (1)  03.14.2024    
-- -- Inspection (Slab) (1)  03.14.2024    
-- -- Inspection (Drain Tile) (0)  03.14.2024    
-- -- Pour Slab (1) *   04.18.2024    
-- -- Settlement Agent Confirmed (0)  04.19.2024    
-- -- Framing I (9)  04.18.2024    
-- -- Order Steps (0)  04.18.2024    
-- -- Order Tubs / Showers (0)  04.18.2024    
-- -- Framing II (8)  04.18.2024    
-- -- Framing III (8) *   04.18.2024    
-- -- Verify Window & Roof Structure (0)  04.25.2024    
-- -- Install Stairs (0) *   03.14.2024    
-- -- Windows & Doors (0) *   04.27.2024    
-- -- House Number and Status in Window (0)  04.27.2024    
-- -- Roofing (0) *   04.27.2024    
-- -- Order Cabinets (0)  06.07.2024    
-- -- Order Appliances (0)  07.17.2024     Ordered 5/28
-- -- Deck (0)  07.17.2024    
-- -- Gutters (0)  06.22.2024    
-- -- Driveway (0) *   07.17.2024    
-- -- Patio (0)  05.08.2024    
-- -- Privacy Divider / Fence (0) *   07.24.2024     in process 7/20
-- -- Sod / Seed / Landscaping (0)  07.24.2024    
-- -- HVAC Rough In (4)  04.27.2024     In process 4/24
-- -- Rough In Microwave Vent (0)  04.27.2024    
-- -- Plumbing Rough In (4)  05.11.2024     In process 5/8
-- -- Electric Rough In (4)  05.11.2024    
-- -- Inspection (Rough In HVAC) (1)  05.18.2024    
-- -- Inspection (Rough In Plumbing) (1)  05.18.2024    
-- -- Inspection (Rough In Electric) (1)  05.18.2024    
-- -- Inspection (Framing) (1) *   05.18.2024    
-- -- Inspection (Deck Piers) (0)  05.18.2024    
-- -- Exterior Vinyl (0) *   06.13.2024     In process 6/5
-- -- Exterior Stone (0)  07.07.2024     In process 6/26
-- -- Insulation (2) *   05.18.2024    
-- -- Inspection (Insulation) (1)  05.22.2024    
-- -- Inspection (Electric Service) (0)  07.11.2024    
-- -- Set Electric Meter (0) *   08.06.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  06.10.2024    
-- -- Drywall (Hang) (4) *   05.26.2024     In process 5/22
-- -- Loan Approval (0)  04.26.2024     JoDee (100% VA)
-- -- Deed Preparation (0)  07.28.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   06.05.2024     In process 6/1
-- -- Paint 1 (1)  06.05.2024    
-- -- Garage Door (0)  06.22.2024    
-- -- House Numbers (0)  07.24.2024    
-- -- Mailbox (0)  07.17.2024    
-- -- Cabinet Installation (2) *   07.07.2024     Mon, July 1
-- -- Granite Installation (1) *   07.07.2024    
-- -- Interior Trim - Install (3) *   06.15.2024     In process 6/12
-- -- Order Plumbing / Lighting Fixtures (0)  07.08.2024    
-- -- Interior Trim - Paint (1)  06.26.2024    
-- -- Luxury Vinyl Plank (3) *   06.30.2024     In process 6/26
-- -- Luxury Vinyl Tile (0)  06.30.2024     In process 6/26
-- -- Paint 2 (3)  06.22.2024    
-- -- Cover Floors (0)  07.17.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  07.11.2024    
-- -- Shoe Moulding (0)  07.07.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   07.24.2024     In process 7/20
-- -- Install Coded Lockbox (add extra keys) (0)  07.25.2024    
-- -- Pay Water / Sewer Taps (0)  08.05.2024     Jerry paying 7/25
-- -- Set Water Meter (1) *   08.05.2024    
-- -- Electric Trim Out (3) *   07.20.2024    
-- -- Ceiling Fans (0)  07.26.2024     Master
-- -- HVAC Trim Out (1) *   08.07.2024    
-- -- Blower Door Test (1)  08.08.2024    
-- -- Plumbing Trim Out (2) *   07.26.2024     On site 7/24
-- -- Install Appliances (0) *   07.26.2024     On site 7/17
-- -- Paint 3 (2) *   07.17.2024    
-- -- Carpet (2)  06.30.2024    
-- -- Appraiser Confirms Construction Completion (0)  08.22.2024     Tell Sara Gordon, JoDee Lambert
-- -- Inspection (Final HVAC) (0)  08.12.2024    
-- -- Inspection (Final Plumbing) (0)  08.12.2024    
-- -- Inspection (Final Electric) (0)  08.12.2024    
-- -- Inspection (Final Building) (4) *   08.12.2024     Friday, August 9
-- -- Pre Walk Through (0)  07.29.2024     Completed 7/29
-- -- Stain Hardwood Stairs (1) *   07.24.2024     In process 7/20
-- -- Cleaning (1)  08.12.2024     In process 8/10
-- -- Certificate of Occupancy (1) *   08.15.2024    
-- -- C.O. to Lender (0)  08.15.2024     Sara Gordon, JoDee Lambert
-- -- Schedule Closing (0)  08.19.2024    
-- -- Buyer Walk Through (1) *   08.18.2024     Sunday, Aug 18, 2PM
-- -- Payment for Upgrades (0)  08.08.2024    
-- -- Keys to Settlement Agent (0)  08.08.2024    
-- -- Review Settlement Statement (0)  08.13.2024    
-- -- Jerry Signs Closing Documents (0)  08.15.2024    
-- -- Request Trash Tote From POA Manager (0)  08.08.2024    
-- -- Closing (1)  08.24.2024     Brittany @ West View Title, Thu Aug 22
-- -- Remove Coded Lockbox (0)  08.26.2024