CRITICAL PATH
Tue    Feb 3      Inspection (Plumbing Under Slab) (1)  04.18.2024    
    Install Stairs (0) *   05.23.2024    
    Windows & Doors (0) *   07.15.2024    
    House Numbers (0)  09.18.2024    
Wed    Feb 4      Granite Installation (1) *   10.09.2024    
    Shoe Moulding (0)  09.28.2024    
    Payment for Upgrades (0)  11.13.2024    
TO DO - COMPLETED OR DELETED
Can only be 10x10 deck
This deck has quite a few screws that need to be nailed in or removed?
Is the farmhouse sink on site? I’m not seeing it.
All drawer hardware is missing
Sink is sitting on top of kitchen island
Can the deck be 12 x 18?
Prepare basement and bathroom for drywall Drywall needs final sanding 10/26
Remove screen from back deck
Two bathtubs in garage
Patch holes in basement floor
Needs bathtub in bonus bath
A few shelves need to be hung in master closet after carpet is installed
Powder bath mirror needs installed
Powder bath light fixture needs installed
Is the sink set correctly in to the countertops? Kate has a plan
Reinstall hall bathroom countertop
Install the master bathroom countertops
Microwave vent not working CJ
Incorrect refrigerator has been installed CJ
Master bathroom needs side, splash
Install luxury vinyl planks upstairs
Powder bath, light fixture needed, and pedestal sink
Black master shower drain is going to be needed here also
CODED LOCKBOX 5656
Remove the double vanity top from the master bathroom
USDA loan
Dented front awning Davenport
Make a variety of vinyl repairs to where deck was expanded Davenport
Put gutters back up Davenport
Deck exterior light needed Electrician
Light fixture needed powder bath Electrician
Bonus room needs doors
When is bonus bathroom vanity being delivered?
Bonus room needs doors and trim George
Finish touchup paint Painter
Large hole in master shower Roger
Install patio and deck, door screens, and window screens Jill
Whiteboard needed on back deck, bonus room level Tom
Install bonus bathroom vanity Tom will install
Install screens Jill
Kitchen lightbulb needed Jill
Put attic access in place after final inspection
LVP in bonus room being installed 11/13
Door knobs, missing and bonus room, and HVAC vent Just door knobs 11/23
Needs plumbing trim out at sink in bonus room we need the vanity first
Outlet uneven in upstairs hallway electrician
Put HVAC covers in floor Master bedroom
She doesn’t fully cover gap between flooring and wall in master bedroom Shoe Mold - Denny
Back patio door does not latch correctly Paul, Joe, Don
Refrigerator is very loud. Jill check it out. 11/23 Noise sort of resolved
Reconfigure rear downspout based on larger deck Davenport
Mirror needed, and bonus bath In - Paul
The white part of the hardwood treads may need to be repainted. Pretty significant staining. Lynn or painters
Move this splash block over to the gutter and possibly patch holes and vinyl? Holes just need to be patched - Jeremy, Davenport
Scratch on upstairs landing On flooring - Denny
Adjust mirror and light fixture drywaller, painter
Patch drywall where light fixture was moved powder room
needs white board on lower deck area Tom
Crack in primary bedroom on wall needs touch up
Fill holes in siding on back of townhouse where downspout used to be attached Tom
Range not working Kate will send the warranty info to buyer
install screens Still waiting on screens of the correct size
UPGRADES - COMPLETED
    White Upgraded Perimeter Kitchen Cabinets  
    Double Waste Basket in Island  
    Three Drawer Base in place of B 36"  
    Microwave vented to exterior  
    LVT Gardenia Upgrade Baths and Laundry  
    Living Room Ceiling Fan  
    Level III Quartz Countertops  
    Level 3 Quartz countertops Bathroom  
    Heavy Glass Shower Door  
    LVP in upstairs hallway and Bedrooms  
    LVP in Bonus Room  
    Painted Carpet Grade Steps  
    Eggshell Paint  
    Upgrades included in contract price  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  09.25.2024    
-- -- $2500 Deposit Received (0)  09.25.2024    
-- -- Association Packet Requested (0)  09.25.2024    
-- -- Association Packet Received (0)  10.04.2024    
-- -- Selections Meeting (0)  09.25.2024    
-- -- Selections Sheet Signed (0)  09.25.2024    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.25.2024    
-- -- Deposit For Upgrades Received (0)  09.25.2024    
-- -- Building Permit (30) *   02.19.2024    
-- -- Order Roof & Floor Trusses (1)  05.23.2024    
-- -- Order Windows & Doors (0)  12.14.2025    
-- -- Stake Out Home (1)  02.19.2024    
-- -- Excavate (2)  02.19.2024    
-- -- Inspection (Footers) (1)  12.14.2025    
-- -- Inspection (Concrete Wall) (1)  02.19.2024    
-- -- Pour Footers (1) *   02.19.2024    
-- -- Set Forms (2)  04.18.2024    
-- -- Pour Foundation Walls (1)  04.18.2024    
-- -- Plumb Slab (2)  04.18.2024    
-- -- Inspection (Conduit Under Slab) (1)  04.18.2024    
-- -- Prepare Slab (1)  04.18.2024    
-- -- Inspection (Slab) (1)  04.18.2024    
-- -- Inspection (Drain Tile) (0)  04.18.2024    
-- -- Pour Slab (1) *   04.18.2024    
-- -- Settlement Agent Confirmed (0)  10.25.2024     sent to WVT on 10/24
-- -- Framing I (9)  04.22.2024    
-- -- Order Steps (0)  05.23.2024    
-- -- Order Tubs / Showers (0)  06.19.2024    
-- -- Framing II (8)  05.13.2024    
-- -- Framing III (8) *   05.23.2024    
-- -- Verify Window & Roof Structure (0)  05.23.2024    
-- -- House Number and Status in Window (0)  07.20.2024    
-- -- Roofing (0) *   06.16.2024    
-- -- Order Cabinets (0)  08.06.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  07.17.2024    
-- -- Gutters (0)  08.21.2024    
-- -- Driveway (0) *   09.04.2024    
-- -- Patio (0)  09.07.2024    
-- -- Privacy Divider / Fence (0) *   08.14.2024    
-- -- Sod / Seed / Landscaping (0)  10.06.2024    
-- -- HVAC Rough In (4)  06.03.2024    
-- -- Rough In Microwave Vent (0)  06.05.2024    
-- -- Plumbing Rough In (4)  06.22.2024     In process 6/19
-- -- Electric Rough In (4)  06.30.2024    
-- -- Inspection (Rough In HVAC) (1)  07.10.2024    
-- -- Inspection (Rough In Plumbing) (1)  07.10.2024    
-- -- Inspection (Rough In Electric) (1)  07.10.2024    
-- -- Inspection (Framing) (1) *   07.10.2024    
-- -- Inspection (Deck Piers) (0)  09.05.2024    
-- -- Exterior Vinyl (0) *   08.18.2024    
-- -- Exterior Stone (0)  08.18.2024    
-- -- Insulation (2) *   07.10.2024    
-- -- Inspection (Insulation) (1)  07.17.2024    
-- -- Inspection (Electric Service) (0)  09.05.2024    
-- -- Set Electric Meter (0) *   09.17.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  08.15.2024    
-- -- Drywall (Hang) (4) *   07.17.2024    
-- -- Loan Approval (0)  11.13.2024     USDA
-- -- Deed Preparation (0)  10.28.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   08.07.2024     In process 8/3
-- -- Paint 1 (1)  08.10.2024    
-- -- Garage Door (0)  08.18.2024    
-- -- Mailbox (0)  09.18.2024    
-- -- Cabinet Installation (2) *   08.21.2024    
-- -- Interior Trim - Install (3) *   09.07.2024     In process 9/4
-- -- Order Plumbing / Lighting Fixtures (0)  09.26.2024    
-- -- Interior Trim - Paint (1)  09.07.2024    
-- -- Luxury Vinyl Plank (3) *   09.15.2024     In process 9/11
-- -- Luxury Vinyl Tile (0)  09.18.2024    
-- -- Paint 2 (3)  09.18.2024    
-- -- Cover Floors (0)  10.30.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.10.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   10.02.2024     In process 9/28. Few bathroom accessories are in place.
-- -- Install Coded Lockbox (add extra keys) (0)  10.19.2024    
-- -- Pay Water / Sewer Taps (0)  09.12.2024    
-- -- Set Water Meter (1) *   09.17.2024    
-- -- Electric Trim Out (3) *   09.28.2024     In process 9/25
-- -- Ceiling Fans (0)  09.25.2024    
-- -- HVAC Trim Out (1) *   09.18.2024    
-- -- Blower Door Test (1)  11.07.2024    
-- -- Plumbing Trim Out (2) *   10.30.2024     In process 10/26
-- -- Install Appliances (0) *   10.05.2024    
-- -- Paint 3 (2) *   09.21.2024    
-- -- Carpet (2)  10.05.2024    
-- -- Appraiser Confirms Construction Completion (0)  12.02.2024    
-- -- Inspection (Final HVAC) (0)  11.21.2024    
-- -- Inspection (Final Plumbing) (0)  11.21.2024    
-- -- Inspection (Final Electric) (0)  11.21.2024    
-- -- Inspection (Final Building) (4) *   11.23.2024     reinspect Fri, Nov 22
-- -- Pre Walk Through (0)  11.21.2024    
-- -- Stain Hardwood Stairs (1) *   10.16.2024     In process 10/12
-- -- Cleaning (1)  12.04.2024     In process 11/30
-- -- Certificate of Occupancy (1) *   11.27.2024    
-- -- C.O. to Lender (0)  11.27.2024    
-- -- Schedule Closing (0)  12.05.2024    
-- -- Buyer Walk Through (1) *   12.03.2024     Monday 12/2 3:00 PM
-- -- Keys to Settlement Agent (0)  11.18.2024    
-- -- Review Settlement Statement (0)  12.09.2024    
-- -- Jerry Signs Closing Documents (0)  12.13.2024    
-- -- Request Trash Tote From POA Manager (0)  11.13.2024    
-- -- Closing (1)  12.16.2024     Brittany @ West View Title - Dec 13
-- -- Remove Coded Lockbox (0)  12.18.2024