CONGERS-2 - 56  ::  1372 Appaloosa Court
[ BUILD: 20231961 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Wednesday (Sep 18)    show all photos
--   --   Sink is sitting on top of kitchen island
--   --   Can the deck be 12 x 18?
--   --   Prepare basement and bathroom for drywall
--   --   Remove screen from back deck
Fri    Sep 20      Ratified Contract? (0)      
    Microwave vented to exterior  
    Living Room Ceiling Fan  
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Expanded 12 x 18 deck (replace current)  
    Level III Quartz Countertops  
    French Style Refrigerator  
    Level 3 Quartz countertops Bathroom  
    Heavy Glass Shower Door  
    LVP in upstairs hallway and Bedrooms  
    LVP in Bonus Room  
    Painted Carpet Grade Steps  
    Eggshell Paint  
Fri    Sep 20      $2500 Deposit Received (0)      
Fri    Sep 20      Association Packet Requested (0)      
Fri    Sep 20      Association Packet Received (0)      
Fri    Sep 20      Selections Meeting (0)      
Fri    Sep 20      Selections Sheet Signed (0)      
Fri    Sep 20      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    Sep 20      Deposit For Upgrades Received (0)      
Fri    Sep 20      Settlement Agent Confirmed (0)      
Fri    Sep 20      Sod / Seed / Landscaping (0)      
Fri    Sep 20      Loan Approval (0)      
Fri    Sep 20      Deed Preparation (0)      
Fri    Sep 20      Granite Installation (1)      
Mon    Sep 23      Order Plumbing / Lighting Fixtures (0)      
Mon    Sep 23      Cover Floors (1)      
Tue    Sep 24      Deliver Plumbing / Lighting Fixtures (0)      
Tue    Sep 24      Shoe Moulding (0)      
Tue    Sep 24      Shelving, Door Knobs, Fire Extinguisher (0)      
Tue    Sep 24      Install Coded Lockbox (add extra keys) (0)      
Tue    Sep 24      Electric Trim Out (3)      
Fri    Sep 27      Ceiling Fans (0)      
Fri    Sep 27      Blower Door Test (1)      
Mon    Sep 30      Plumbing Trim Out (2)      
Wed    Oct 2      Install Appliances (0)      
Wed    Oct 2      Paint 3 (2)      
Fri    Oct 4      Carpet (2)      
Tue    Oct 8      Appraiser Confirms Construction Completion (0)      
Tue    Oct 8      Inspection (Final HVAC) (1)      
Wed    Oct 9      Inspection (Final Plumbing) (1)      
Thu    Oct 10      Inspection (Final Electric) (1)      
Fri    Oct 11      Inspection (Final Building) (2)      
Tue    Oct 15      Pre Walk Through (0)      
Tue    Oct 15      Stain Hardwood Stairs (1)      
Wed    Oct 16      Cleaning (1)      
Thu    Oct 17      Certificate of Occupancy (1)      
Fri    Oct 18      C.O. to Lender (0)      
Fri    Oct 18      Schedule Closing (0)      
Fri    Oct 18      Buyer Walk Through (1)      
Mon    Oct 21      Payment for Upgrades (0)      
Mon    Oct 21      Keys to Settlement Agent (0)      
Mon    Oct 21      Review Settlement Statement (0)      
Mon    Oct 21      Jerry Signs Closing Documents (0)      
Mon    Oct 21      Request Trash Tote From POA Manager (0)      
Mon    Oct 21      Closing (1)      
Tue    Oct 22      Remove Coded Lockbox (0)      
--   --   Can only be 10x10 deck
--   --   This deck has quite a few screws that need to be nailed in or removed?
--   --   Is the farmhouse sink on site? I’m not seeing it.
--   --   All drawer hardware is missing
-- -- Building Permit (30)  02.19.2024    
-- -- Order Roof & Floor Trusses (1)  05.23.2024    
-- -- Order Windows & Doors (0)  06.19.2024    
-- -- Stake Out Home (1)  02.19.2024    
-- -- Excavate (2)  02.19.2024    
-- -- Inspection (Footers) (1)  02.19.2024    
-- -- Inspection (Concrete Wall) (1)  02.19.2024    
-- -- Pour Footers (1)  02.19.2024    
-- -- Set Forms (2)  04.18.2024    
-- -- Pour Foundation Walls (1)  04.18.2024    
-- -- Plumb Slab (2)  04.18.2024    
-- -- Inspection (Plumbing Under Slab) (1)  04.18.2024    
-- -- Inspection (Conduit Under Slab) (1)  04.18.2024    
-- -- Prepare Slab (1)  04.18.2024    
-- -- Inspection (Slab) (1)  04.18.2024    
-- -- Inspection (Drain Tile) (0)  04.18.2024    
-- -- Pour Slab (1)  04.18.2024    
-- -- Framing I (9)  04.22.2024    
-- -- Order Steps (0)  05.23.2024    
-- -- Order Tubs / Showers (0)  06.19.2024    
-- -- Framing II (8)  05.13.2024    
-- -- Framing III (8)  05.23.2024    
-- -- Verify Window & Roof Structure (0)  05.23.2024    
-- -- Install Stairs (0)  05.23.2024    
-- -- Windows & Doors (0)  07.15.2024    
-- -- House Number and Status in Window (0)  07.20.2024    
-- -- Roofing (0)  06.16.2024    
-- -- Order Cabinets (0)  08.06.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  07.17.2024    
-- -- Gutters (0)  08.21.2024    
-- -- Driveway (0)  09.04.2024    
-- -- Patio (0)  09.07.2024    
-- -- Privacy Divider / Fence (0)  08.14.2024    
-- -- HVAC Rough In (4)  06.03.2024    
-- -- Inspection (Rough In HVAC) (1)  07.10.2024    
-- -- Rough In Microwave Vent (0)  06.05.2024    
-- -- Plumbing Rough In (4)  06.22.2024     In process 6/19
-- -- Inspection (Rough In Plumbing) (1)  07.10.2024    
-- -- Electric Rough In (4)  06.30.2024    
-- -- Inspection (Rough In Electric) (1)  07.10.2024    
-- -- Inspection (Deck Piers) (0)  09.05.2024    
-- -- Inspection (Framing) (1)  07.10.2024    
-- -- Exterior Vinyl (0)  08.18.2024    
-- -- Exterior Stone (0)  08.18.2024    
-- -- Insulation (2)  07.10.2024    
-- -- Inspection (Insulation) (1)  07.17.2024    
-- -- Inspection (Electric Service) (0)  09.05.2024    
-- -- Set Electric Meter (0)  09.17.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  08.15.2024    
-- -- Drywall (Hang) (4)  07.17.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6)  08.07.2024     In process 8/3
-- -- Paint 1 (1)  08.10.2024    
-- -- Garage Door (0)  08.18.2024    
-- -- House Numbers (0)  09.18.2024    
-- -- Mailbox (0)  09.18.2024    
-- -- Cabinet Installation (2)  08.21.2024    
-- -- Interior Trim - Install (3)  09.07.2024     In process 9/4
-- -- Interior Trim - Paint (1)  09.07.2024    
-- -- Luxury Vinyl Plank (3)  09.15.2024     In process 9/11
-- -- Luxury Vinyl Tile (0)  09.18.2024    
-- -- Paint 2 (3)  09.18.2024    
-- -- Pay Water / Sewer Taps (0)  09.12.2024    
-- -- Set Water Meter (0)  09.17.2024    
-- -- HVAC Trim Out (1)  09.18.2024