CONGERS-2 - 56  ::  1372 Appaloosa Court
[ BUILD: 20231961 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Saturday (Nov 23)    show all photos
--   --   CODED LOCKBOX 5656
--   --   USDA loan
--   --   Dented front awning Davenport
--   --   Install screens Jill
--   --   Door knobs, missing and bonus room, and HVAC vent Just door knobs 11/23
--   --   Outlet uneven in upstairs hallway electrician
--   --   She doesn’t fully cover gap between flooring and wall in master bedroom Shoe Mold - Denny
--   --   Back patio door does not latch correctly Paul, Joe, Don
--   --   Refrigerator is very loud. Jill check it out. 11/23 Jill
--   --   Reconfigure rear downspout based on larger deck Davenport
Wed    Nov 27      Appraiser Confirms Construction Completion (0)      
Wed    Nov 27      Cleaning (1)      
Thu    Nov 28      Schedule Closing (0)      
Thu    Nov 28      Buyer Walk Through (1)      
Fri    Nov 29      Review Settlement Statement (0)      
Fri    Nov 29      Jerry Signs Closing Documents (0)      
Fri    Nov 29      Closing (1)       Brittany @ West View Title
Mon    Dec 2      Remove Coded Lockbox (0)      
--   --   Can only be 10x10 deck
--   --   This deck has quite a few screws that need to be nailed in or removed?
--   --   Is the farmhouse sink on site? I’m not seeing it.
--   --   All drawer hardware is missing
--   --   Sink is sitting on top of kitchen island
--   --   Can the deck be 12 x 18?
--   --   Prepare basement and bathroom for drywall Drywall needs final sanding 10/26
--   --   Remove screen from back deck
--   --   Two bathtubs in garage
--   --   Patch holes in basement floor
--   --   Needs bathtub in bonus bath
--   --   A few shelves need to be hung in master closet after carpet is installed
--   --   Powder bath mirror needs installed
--   --   Powder bath light fixture needs installed
--   --   Is the sink set correctly in to the countertops? Kate has a plan
--   --   Reinstall hall bathroom countertop
--   --   Install the master bathroom countertops
--   --   Microwave vent not working CJ
--   --   Incorrect refrigerator has been installed CJ
--   --   Master bathroom needs side, splash
--   --   Install luxury vinyl planks upstairs
--   --   Powder bath, light fixture needed, and pedestal sink
--   --   Black master shower drain is going to be needed here also
--   --   Remove the double vanity top from the master bathroom
--   --   Make a variety of vinyl repairs to where deck was expanded Davenport
--   --   Put gutters back up Davenport
--   --   Deck exterior light needed Electrician
--   --   Light fixture needed powder bath Electrician
--   --   Bonus room needs doors
--   --   When is bonus bathroom vanity being delivered?
--   --   Bonus room needs doors and trim George
--   --   Finish touchup paint Painter
--   --   Large hole in master shower Roger
--   --   Install patio and deck, door screens, and window screens Jill
--   --   Whiteboard needed on back deck, bonus room level Tom
--   --   Install bonus bathroom vanity Tom will install
--   --   Kitchen lightbulb needed Jill
--   --   Put attic access in place after final inspection
--   --   LVP in bonus room being installed 11/13
--   --   Needs plumbing trim out at sink in bonus room we need the vanity first
--   --   Put HVAC covers in floor Master bedroom
-- -- Ratified Contract? (0)  09.25.2024    
-- -- $2500 Deposit Received (0)  09.25.2024    
-- -- Association Packet Requested (0)  09.25.2024    
-- -- Association Packet Received (0)  10.04.2024    
-- -- Selections Meeting (0)  09.25.2024    
-- -- Selections Sheet Signed (0)  09.25.2024    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  09.25.2024    
-- -- Deposit For Upgrades Received (0)  09.25.2024    
-- -- Building Permit (30)  02.19.2024    
-- -- Order Roof & Floor Trusses (1)  05.23.2024    
-- -- Order Windows & Doors (0)  06.19.2024    
-- -- Stake Out Home (1)  02.19.2024    
-- -- Excavate (2)  02.19.2024    
-- -- Inspection (Footers) (1)  02.19.2024    
-- -- Inspection (Concrete Wall) (1)  02.19.2024    
-- -- Pour Footers (1)  02.19.2024    
-- -- Set Forms (2)  04.18.2024    
-- -- Pour Foundation Walls (1)  04.18.2024    
-- -- Plumb Slab (2)  04.18.2024    
-- -- Inspection (Plumbing Under Slab) (1)  04.18.2024    
-- -- Inspection (Conduit Under Slab) (1)  04.18.2024    
-- -- Prepare Slab (1)  04.18.2024    
-- -- Inspection (Slab) (1)  04.18.2024    
-- -- Inspection (Drain Tile) (0)  04.18.2024    
-- -- Pour Slab (1) *   04.18.2024    
-- -- Settlement Agent Confirmed (0)  10.25.2024     sent to WVT on 10/24
-- -- Framing I (9)  04.22.2024    
-- -- Order Steps (0)  05.23.2024    
-- -- Order Tubs / Showers (0)  06.19.2024    
-- -- Framing II (8)  05.13.2024    
-- -- Framing III (8) *   05.23.2024    
-- -- Verify Window & Roof Structure (0)  05.23.2024    
-- -- Install Stairs (0)  05.23.2024    
-- -- Windows & Doors (0)  07.15.2024    
-- -- House Number and Status in Window (0)  07.20.2024    
-- -- Roofing (0)  06.16.2024    
-- -- Order Cabinets (0)  08.06.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- Deck (0)  07.17.2024    
-- -- Gutters (0)  08.21.2024    
-- -- Driveway (0)  09.04.2024    
-- -- Patio (0)  09.07.2024    
-- -- Privacy Divider / Fence (0)  08.14.2024    
-- -- Sod / Seed / Landscaping (0)  10.06.2024    
-- -- HVAC Rough In (4)  06.03.2024    
-- -- Inspection (Rough In HVAC) (1)  07.10.2024    
-- -- Rough In Microwave Vent (0)  06.05.2024    
-- -- Plumbing Rough In (4)  06.22.2024     In process 6/19
-- -- Inspection (Rough In Plumbing) (1)  07.10.2024    
-- -- Electric Rough In (4)  06.30.2024    
-- -- Inspection (Rough In Electric) (1)  07.10.2024    
-- -- Inspection (Deck Piers) (0)  09.05.2024    
-- -- Inspection (Framing) (1)  07.10.2024    
-- -- Exterior Vinyl (0) *   08.18.2024    
-- -- Exterior Stone (0)  08.18.2024    
-- -- Insulation (2)  07.10.2024    
-- -- Inspection (Insulation) (1)  07.17.2024    
-- -- Inspection (Electric Service) (0)  09.05.2024    
-- -- Set Electric Meter (0)  09.17.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  08.15.2024    
-- -- Drywall (Hang) (4) *   07.17.2024    
-- -- Loan Approval (0)  11.13.2024     USDA
-- -- Deed Preparation (0)  10.28.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   08.07.2024     In process 8/3
-- -- Paint 1 (1)  08.10.2024    
-- -- Garage Door (0)  08.18.2024    
-- -- House Numbers (0)  09.18.2024    
-- -- Mailbox (0)  09.18.2024    
-- -- Cabinet Installation (2) *   08.21.2024    
-- -- Granite Installation (1) *   10.09.2024    
-- -- Interior Trim - Install (3)  09.07.2024     In process 9/4
-- -- Order Plumbing / Lighting Fixtures (0)  09.26.2024    
-- -- Interior Trim - Paint (1)  09.07.2024    
-- -- Luxury Vinyl Plank (3) *   09.15.2024     In process 9/11
-- -- Luxury Vinyl Tile (0)  09.18.2024    
-- -- Paint 2 (3)  09.18.2024    
-- -- Cover Floors (1)  10.30.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.10.2024    
-- -- Shoe Moulding (0)  09.28.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  10.02.2024     In process 9/28. Few bathroom accessories are in place.
-- -- Install Coded Lockbox (add extra keys) (0)  10.19.2024    
-- -- Pay Water / Sewer Taps (0)  09.12.2024    
-- -- Set Water Meter (0)  09.17.2024    
-- -- Electric Trim Out (3)  09.28.2024     In process 9/25
-- -- Ceiling Fans (0)  09.25.2024    
-- -- HVAC Trim Out (1)  09.18.2024    
-- -- Blower Door Test (1)  11.07.2024    
-- -- Plumbing Trim Out (2)  10.30.2024     In process 10/26
-- -- Install Appliances (0) *   10.05.2024    
-- -- Paint 3 (2) *   09.21.2024    
-- -- Carpet (2)  10.05.2024    
-- -- Inspection (Final HVAC) (1)  11.21.2024    
-- -- Inspection (Final Plumbing) (1)  11.21.2024    
-- -- Inspection (Final Electric) (1)  11.21.2024    
-- -- Inspection (Final Building) (2) *   11.23.2024     reinspect Fri, Nov 22
-- -- Pre Walk Through (0)  11.21.2024    
-- -- Stain Hardwood Stairs (1)  10.16.2024     In process 10/12
-- -- Certificate of Occupancy (1) *   11.27.2024    
-- -- C.O. to Lender (0)  11.27.2024    
-- -- Payment for Upgrades (0)  11.13.2024    
-- -- Keys to Settlement Agent (0)  11.18.2024    
-- -- Request Trash Tote From POA Manager (0)  11.13.2024