CONGERS-2 - 60  ::  1344 Appaloosa Court
[ BUILD: 20231965 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Saturday (Nov 23)    show all photos
--   --   1031 closing deadline = early January
--   --   Hall vanity needs hardware
--   --   Cover hardwood treads Cover has been removed
--   --   Pretty deep scratch in the back of the kitchen island. Jill, can you take a look? Fred will order
--   --   Garage door needs window grills Davenport
    Driveway - could be expanded but with single width entry  
    Vinyl Plank in Upstairs Hallway and Bedroom ($2,900 cost included in contract price)  
    Stained Hardwood Treads to Bedroom Level ($1,890 cost included in contract price)  
    Expanded Driveway (single car width entry) ($1,260 cost included in contract price)  
    Eggshell Finish Paint ($1,050 cost included in contract price)  
    Upgraded LVT upstairs Bathrooms  
Wed    Nov 27      Deck (0)      
Wed    Nov 27      Gutters (0)      
Wed    Nov 27      Driveway (0)      
Wed    Nov 27      Patio (0)       Framed
Wed    Nov 27      Privacy Divider / Fence (0)      
Wed    Nov 27      Sod / Seed / Landscaping (0)      
Wed    Nov 27      Exterior Stone (0)      
Wed    Nov 27      Set Electric Meter (0)      
Wed    Nov 27      House Numbers (0)      
Wed    Nov 27      Mailbox (0)      
Wed    Nov 27      Order Plumbing / Lighting Fixtures (0)      
Wed    Nov 27      Interior Trim - Paint (1)      
Thu    Nov 28      Luxury Vinyl Plank (3) *       
Tue    Dec 3      Luxury Vinyl Tile (0)      
Tue    Dec 3      Paint 2 (3)      
Fri    Dec 6      Cover Floors (1)      
Mon    Dec 9      Shoe Moulding (0)      
Mon    Dec 9      Shelving, Door Knobs, Fire Extinguisher (0)      
Mon    Dec 9      Install Coded Lockbox (add extra keys) (0)      
Mon    Dec 9      Pay Water / Sewer Taps (0)      
Mon    Dec 9      Set Water Meter (0)      
Mon    Dec 9      Electric Trim Out (3)      
Thu    Dec 12      Ceiling Fans (0)      
Thu    Dec 12      HVAC Trim Out (1)      
Fri    Dec 13      Blower Door Test (1)      
Mon    Dec 16      Plumbing Trim Out (2)      
Wed    Dec 18      Install Appliances (0) *        11/18?
Wed    Dec 18      Paint 3 (2) *       
Fri    Dec 20      Carpet (2)      
Tue    Dec 24      Appraiser Confirms Construction Completion (0)      
Tue    Dec 24      Inspection (Final HVAC) (1)      
Wed    Dec 25      Inspection (Final Plumbing) (1)      
Thu    Dec 26      Inspection (Final Electric) (1)      
Fri    Dec 27      Inspection (Final Building) (2) *       
Tue    Dec 31      Pre Walk Through (0)      
Tue    Dec 31      Stain Hardwood Stairs (1)      
Wed    Jan 1      Cleaning (1)      
Thu    Jan 2      Certificate of Occupancy (1) *       
Fri    Jan 3      C.O. to Lender (0)      
Fri    Jan 3      Schedule Closing (0)      
Fri    Jan 3      Buyer Walk Through (1)      
Mon    Jan 6      Payment for Upgrades (0)      
Mon    Jan 6      Keys to Settlement Agent (0)      
Mon    Jan 6      Review Settlement Statement (0)      
Mon    Jan 6      Jerry Signs Closing Documents (0)      
Mon    Jan 6      Request Trash Tote From POA Manager (0)      
Mon    Jan 6      Closing (1)       Brittany @ West View Title
Tue    Jan 7      Remove Coded Lockbox (0)      
--   --   Driveway - could be expanded but with single width entry
--   --   1031 clsoing deadline = early January
--   --   Patch hole in garage floor
--   --   Hall bath tub is different here as well
--   --   Cover hardwood treads
--   --   Bathroom vanities need tops
--   --   Call vanity needs hardware
--   --   Few pieces of missing siding 11/20
-- -- Ratified Contract? (0)  06.17.2024    
    Driveway - could be expanded but with single width entry  
    Vinyl Plank in Upstairs Hallway and Bedroom ($2,900 cost included in contract price)  
    Stained Hardwood Treads to Bedroom Level ($1,890 cost included in contract price)  
    Expanded Driveway (single car width entry) ($1,260 cost included in contract price)  
    Eggshell Finish Paint ($1,050 cost included in contract price)  
    Upgraded LVT upstairs Bathrooms  
-- -- $2500 Deposit Received (0)  06.19.2024    
-- -- Association Packet Requested (0)  06.17.2024    
-- -- Association Packet Received (0)  06.21.2024    
-- -- Selections Meeting (0)  07.10.2024    
-- -- Selections Sheet Signed (0)  07.20.2024     7/10: sent to Brandon for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.25.2024    
-- -- Deposit For Upgrades Received (0)  07.25.2024    
-- -- Building Permit (30)  04.18.2024    
-- -- Order Roof & Floor Trusses (1)  08.22.2024    
-- -- Order Windows & Doors (0)  09.15.2024    
-- -- Stake Out Home (1)  04.18.2024    
-- -- Excavate (2)  04.18.2024    
-- -- Inspection (Footers) (1)  04.22.2024    
-- -- Inspection (Concrete Wall) (1)  05.13.2024    
-- -- Pour Footers (1)  04.25.2024    
-- -- Set Forms (2)  05.13.2024    
-- -- Pour Foundation Walls (1)  05.13.2024    
-- -- Plumb Slab (2)  05.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  07.08.2024    
-- -- Inspection (Conduit Under Slab) (1)  07.08.2024    
-- -- Prepare Slab (1)  07.08.2024    
-- -- Inspection (Slab) (1)  07.08.2024    
-- -- Inspection (Drain Tile) (0)  07.08.2024    
-- -- Pour Slab (1) *   07.08.2024    
-- -- Settlement Agent Confirmed (0)  07.28.2024     Sent 7/25/2024
-- -- Framing I (9)  08.22.2024    
-- -- Order Steps (0)  09.15.2024    
-- -- Order Tubs / Showers (0)  09.15.2024    
-- -- Framing II (8)  08.22.2024    
-- -- Framing III (8) *   09.12.2024    
-- -- Verify Window & Roof Structure (0)  09.15.2024    
-- -- Install Stairs (0)  09.18.2024    
-- -- Windows & Doors (0)  10.03.2024    
-- -- House Number and Status in Window (0)  10.03.2024    
-- -- Roofing (0)  10.12.2024    
-- -- Order Cabinets (0)  09.08.2024    
-- -- Order Appliances (0)  08.12.2024    
-- -- HVAC Rough In (4)  09.28.2024     In process 9/21
-- -- Inspection (Rough In HVAC) (1)  10.12.2024    
-- -- Rough In Microwave Vent (0)  09.28.2024    
-- -- Plumbing Rough In (4)  09.28.2024    
-- -- Inspection (Rough In Plumbing) (1)  10.12.2024    
-- -- Electric Rough In (4)  10.05.2024    
-- -- Inspection (Rough In Electric) (1)  10.12.2024    
-- -- Inspection (Deck Piers) (0)  11.25.2024    
-- -- Inspection (Framing) (1)  10.12.2024    
-- -- Exterior Vinyl (0) *   11.20.2024     In process 11/16
-- -- Insulation (2)  10.12.2024    
-- -- Inspection (Insulation) (1)  10.23.2024    
-- -- Inspection (Electric Service) (0)  11.25.2024    
-- -- Inspection (Main Sewer Line) (0)  10.14.2024    
-- -- Inspection (Main Water Line) (0)  10.14.2024    
-- -- Order Interior Doors & Trim (0)  10.14.2024    
-- -- Drywall (Hang) (4) *   10.23.2024     Stocked 10/19
-- -- Loan Approval (0)  11.05.2024     Cash, 1031 Exchange
-- -- Deed Preparation (0)  11.05.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   11.06.2024     In process 10/26
-- -- Paint 1 (1)  11.06.2024    
-- -- Garage Door (0)  11.25.2024    
-- -- Cabinet Installation (2) *   11.09.2024     Installed Nov 8
-- -- Granite Installation (1) *   11.16.2024    
-- -- Interior Trim - Install (3)  11.20.2024     In process 11/16
-- -- Deliver Plumbing / Lighting Fixtures (0)  11.25.2024