Driveway - could be expanded but with single width entry |
|
|
-- |
-- |
1031 clsoing deadline = early January |
|
|
-- |
-- |
1031 closing deadline = early January |
|
|
-- |
-- |
Patch hole in garage floor |
|
|
-- |
-- |
Hall bath tub is different here as well |
|
|
-- |
-- |
Cover hardwood treads |
|
|
-- |
-- |
Bathroom vanities need tops |
|
|
-- |
-- |
Call vanity needs hardware |
|
|
-- |
-- |
Hall vanity needs hardware |
Fred |
|
-- |
-- |
Cover hardwood treads |
Cover has been removed |
|
-- |
-- |
Few pieces of missing siding 11/20 |
|
|
-- |
-- |
Pretty deep scratch in the back of the kitchen island. Jill, can you take a look? |
Will try repair first |
|
-- |
-- |
Garage door needs window grills |
Davenport |
|
-- |
-- |
Silver closet hinges |
Jill |
|
-- |
-- |
Final inspection 12/30/24 |
|
|
-- |
-- |
Few paint touchups needed in powder bathroom |
Painter |
|
-- |
-- |
Mirrors needed in master bath and powder bath |
Tuesday, Jan 7 |
|
-- |
-- |
Quite a bit of supplies need to be removed from garage and house before cleaning can occur |
Jill |
|
-- |
-- |
Trim down green pipes in front of townhouses |
Tom |
|
-- |
-- |
Paint front door |
Painter |
|
-- |
-- |
CODED LOCKBOX 6060 |
|
|
-- |
-- |
Replace missing rock |
Dale |
|
-- |
-- |
Remove blue tape at front door |
Jill |
|
-- |
-- |
Remove fridge in garage |
Jill, CJ |
|
-- |
-- |
Cover cable box in garage |
Jill |
|
-- |
-- |
Install patio screen door |
Kenny, Jill |
|
-- |
-- |
Refrigerator seems abnormally loud |
|
|
-- |
-- |
Remove ladder from master closet |
Jill |
|
-- |
-- |
Crack in master shower |
Jill is scheduling the repair |
|
-- |
-- |
Remove trash from deck when snow melts more |
Jill |
|
-- |
-- |
Paint touch up near front door |
Painter |
|
-- |
-- |
Remove large piece of insulation |
|
|
-- |
-- |
Install screens |
Jill. Few missing. On order. |
|
-- |
-- |
Patch and paint screw holes by powder bath light fixture |
Painter |
|
-- |
-- |
Add insulation above attic access |
Jill |
|
-- |
-- |
Fix BR lock on BR 2 |
George |
|
-- |
-- |
Primary Bedroom- replace ceiling fan blades |
Jill |
|
-- |
-- |
clea off back deck |
|
|
-- |
-- |
install window screens |
Jill |
|
-- |
-- |
attic access adjustment |
|
|
-- |
-- |
remove ladder primary closet |
Jill |
|
-- |
-- |
extra air filter |
Jill |
|
-- |
-- |
straighten exhaust fan powder bath |
Jill |
|
-- |
-- |
primary shower repair |
Jill scheduling |
|
-- |
-- |
clean out garage |
Jill |
|
-- |
-- |
missing stone at front door |
|
|
-- |
-- |
paint touch up throughout |
|
|
-- |
-- |
leave extra paint and stain |
Joanna |
|
-- |
-- |
reclean floors and surfaces after punch |
Lynn |
|
-- |
-- |
Paint ext door trim |
Johana |
|
-- |
-- |
Ratified Contract? (0) 06.17.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0) 06.19.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.17.2024 |
|
|
-- |
-- |
Association Packet Received (0) 06.21.2024 |
|
|
-- |
-- |
Selections Meeting (0) 07.10.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 07.20.2024 |
7/10: sent to Brandon for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 07.25.2024 |
|
|
-- |
-- |
Deposit For Upgrades Received (0) 07.25.2024 |
|
|
-- |
-- |
Building Permit (30) 04.18.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.22.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.15.2024 |
|
|
-- |
-- |
Stake Out Home (1) 04.18.2024 |
|
|
-- |
-- |
Excavate (2) 04.18.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 04.22.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 05.13.2024 |
|
|
-- |
-- |
Pour Footers (1) * 04.25.2024 |
|
|
-- |
-- |
Set Forms (2) 05.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 05.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 05.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Prepare Slab (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 07.08.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 07.08.2024 |
|
|
-- |
-- |
Pour Slab (1) * 07.08.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 07.28.2024 |
Sent 7/25/2024 |
|
-- |
-- |
Framing I (9) 08.22.2024 |
|
|
-- |
-- |
Order Steps (0) 09.15.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 09.15.2024 |
|
|
-- |
-- |
Framing II (8) 08.22.2024 |
|
|
-- |
-- |
Framing III (8) * 09.12.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 09.15.2024 |
|
|
-- |
-- |
Install Stairs (0) 09.18.2024 |
|
|
-- |
-- |
Windows & Doors (0) * 10.03.2024 |
|
|
-- |
-- |
House Number and Status in Window (0) 10.03.2024 |
|
|
-- |
-- |
Roofing (0) * 10.12.2024 |
|
|
-- |
-- |
Order Cabinets (0) 09.08.2024 |
|
|
-- |
-- |
Order Appliances (0) 08.12.2024 |
|
|
-- |
-- |
Deck (0) 12.04.2024 |
|
|
-- |
-- |
Gutters (0) 11.30.2024 |
|
|
-- |
-- |
Driveway (0) * 12.14.2024 |
Framed |
|
-- |
-- |
Patio (0) 12.21.2024 |
Framed |
|
-- |
-- |
Privacy Divider / Fence (0) 12.14.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 03.15.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 09.28.2024 |
In process 9/21 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 10.12.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 09.28.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 09.28.2024 |
|
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 10.12.2024 |
|
|
-- |
-- |
Electric Rough In (4) 10.05.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 10.12.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.25.2024 |
|
|
-- |
-- |
Inspection (Framing) (1) * 10.12.2024 |
|
|
-- |
-- |
Exterior Vinyl (0) * 11.20.2024 |
In process 11/16 |
|
-- |
-- |
Exterior Stone (0) 12.07.2024 |
|
|
-- |
-- |
Insulation (2) * 10.12.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1) 10.23.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 11.25.2024 |
|
|
-- |
-- |
Set Electric Meter (0) * 12.12.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 10.14.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 10.14.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 10.14.2024 |
|
|
-- |
-- |
Drywall (Hang) (4) * 10.23.2024 |
Stocked 10/19 |
|
-- |
-- |
Loan Approval (0) 11.05.2024 |
Cash, 1031 Exchange |
|
-- |
-- |
Deed Preparation (0) 11.05.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 11.06.2024 |
In process 10/26 |
|
-- |
-- |
Paint 1 (1) 11.06.2024 |
|
|
-- |
-- |
Garage Door (0) * 11.25.2024 |
|
|
-- |
-- |
House Numbers (0) 12.30.2024 |
|
|
-- |
-- |
Mailbox (0) 12.19.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 11.09.2024 |
Installed Nov 8 |
|
-- |
-- |
Granite Installation (1) * 11.16.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) * 11.20.2024 |
In process 11/16 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 12.02.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 11.30.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 12.14.2024 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 12.14.2024 |
|
|
-- |
-- |
Paint 2 (3) 12.21.2024 |
|
|
-- |
-- |
Cover Floors (1) 12.21.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 11.25.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 12.21.2024 |
In process 12/18 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 01.05.2025 |
In process 12/21 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.06.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.16.2024 |
|
|
-- |
-- |
Set Water Meter (0) * 12.16.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 12.30.2024 |
In process 12/21 |
|
-- |
-- |
Ceiling Fans (0) 12.28.2024 |
|
|
-- |
-- |
HVAC Trim Out (1) 12.30.2024 |
In process 12/21 |
|
-- |
-- |
Blower Door Test (1) 12.30.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 12.21.2024 |
In process 12/18 |
|
-- |
-- |
Install Appliances (0) * 12.28.2024 |
In process 12/21 |
|
-- |
-- |
Paint 3 (2) * 01.05.2025 |
|
|
-- |
-- |
Carpet (2) 12.21.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 12.30.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 12.30.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 12.30.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 12.30.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 12.30.2024 |
|
|
-- |
-- |
Pre Walk Through (0) 01.13.2025 |
Thu, Jan 9 |
|
-- |
-- |
Stain Hardwood Stairs (1) 01.11.2025 |
In process 1/8. Almost completed |
|
-- |
-- |
Cleaning (1) 01.11.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 01.09.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 01.13.2025 |
|
|
-- |
-- |
Schedule Closing (0) 01.13.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 01.15.2025 |
Mon, Jan 13 at 11:30 AM |
|
-- |
-- |
Payment for Upgrades (0) 12.30.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 01.09.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.13.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 01.13.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 01.13.2025 |
|
|
-- |
-- |
Closing (1) 01.15.2025 |
Brittany @ West View Title, Jan 14 |
|
-- |
-- |
Remove Coded Lockbox (0) 03.03.2025 |
|
|