TO DO
Gazebo & Dog Park Next up - siding on gable (Jan 7 - 9)
Grass Seed Lot 73 - 1417 Appaloosa Court
Street Lights at Dog Park?
Move Trailer
Curb & Gutter, Road By Gazebo - after trailer is moved, after dirt is moved
Street Lights at Playground?
Speed Bump One installed 11/23, asking Kayleigh (12/4) for feedback
Street segment next to retention pond After Scott finishes with Phase 4 work
SR Jan 8 (26) More parking next to house meter by Lot 28?
SR Jan 12 (22) Weather vane for Gazebo Careful on the slippery roof
SR Jan 15 (19) Remind County to install last two street signs once road is complete Congers+Derby
SR Jan 20 (14) Replace street light that was damaged
LR Jan 20 (14) Paint light post bases
CL Jan 29 (5) Speed bump did not survive the storm where is it?
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Siding Falling Off Townhouses Jeremy, Davenport (Phase 2 - 1344 Appaloosa)
Street Lights by Boyers Road Installed - wired soon
Street Lights in Phase 2 & 3 Lights are on as of evening of January 7!
Repair Concrete Step By Playground Tom
Grass Seed - Lot 73
Stone By Front Door Lot 87 - 1553 Palomino Trail
Street Lights At Playground?
Street Signs Eight of them, waiting on County to install
Traffic Cones at Appaloosa & Derby
Street light out in Phase 2 by sidewalk to playground Maybe four lights - Tom
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  10.21.2025    
-- -- $2500 Deposit Received (0)  10.21.2025    
-- -- Association Packet Requested (0)  10.21.2025    
-- -- Association Packet Received (0)  10.21.2025    
-- -- Selections Meeting (0)  10.21.2025    
-- -- Selections Sheet Signed (0)  10.21.2025    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.21.2025    
-- -- Deposit For Upgrades Received (0)  10.21.2025    
-- -- Building Permit (30) *   10.21.2025    
-- -- Order Roof & Floor Trusses (1)  10.21.2025    
-- -- Order Windows & Doors (0)  10.21.2025    
-- -- Stake Out Home (1)  10.21.2025    
-- -- Excavate (2)  10.21.2025    
-- -- Inspection (Footers) (1)  10.21.2025    
-- -- Inspection (Concrete Wall) (1)  10.21.2025    
-- -- Pour Footers (1) *   10.21.2025    
-- -- Set Forms (2)  10.21.2025    
-- -- Pour Foundation Walls (1)  10.21.2025    
-- -- Plumb Slab (2)  10.21.2025    
-- -- Inspection (Plumbing Under Slab) (1)  10.21.2025    
-- -- Inspection (Conduit Under Slab) (1)  10.21.2025    
-- -- Prepare Slab (1)  10.21.2025    
-- -- Inspection (Slab) (1)  10.21.2025    
-- -- Inspection (Drain Tile) (0)  10.21.2025    
-- -- Pour Slab (1) *   10.21.2025    
-- -- Settlement Agent Confirmed (0)  10.21.2025    
-- -- Framing I (9)  10.21.2025    
-- -- Order Steps (0)  10.21.2025    
-- -- Order Tubs / Showers (0)  10.21.2025    
-- -- Framing II (8)  10.21.2025    
-- -- Framing III (8) *   10.21.2025    
-- -- Verify Window & Roof Structure (0)  10.21.2025    
-- -- Install Stairs (0) *   10.21.2025    
-- -- Windows & Doors (0) *   10.21.2025    
-- -- House Number and Status in Window (0)  10.21.2025    
-- -- Roofing (0) *   10.21.2025    
-- -- Order Cabinets (0)  10.21.2025    
-- -- Order Appliances (0)  10.21.2025    
-- -- Deck (0)  10.21.2025    
-- -- Gutters (0)  10.21.2025    
-- -- Driveway (0) *   10.21.2025    
-- -- Patio (0)  10.21.2025    
-- -- Privacy Divider / Fence (0) *   10.21.2025    
-- -- Sod / Seed / Landscaping (0)  10.21.2025    
-- -- HVAC Rough In (4)  10.21.2025    
-- -- Rough In Microwave Vent (0)  10.21.2025    
-- -- Plumbing Rough In (4)  10.21.2025    
-- -- Electric Rough In (4)  10.21.2025    
-- -- Inspection (Rough In HVAC) (1)  10.21.2025    
-- -- Inspection (Rough In Plumbing) (1)  10.21.2025    
-- -- Inspection (Rough In Electric) (1)  10.21.2025    
-- -- Inspection (Framing) (1) *   10.21.2025    
-- -- Inspection (Deck Piers) (0)  10.21.2025    
-- -- Exterior Vinyl (0) *   10.21.2025    
-- -- Exterior Stone (0)  10.21.2025    
-- -- Insulation (2) *   10.21.2025    
-- -- Inspection (Insulation) (1)  10.21.2025    
-- -- Inspection (Electric Service) (0)  10.21.2025    
-- -- Set Electric Meter (0) *   10.21.2025    
-- -- Inspection (Main Sewer Line) (0)  10.21.2025    
-- -- Inspection (Main Water Line) (0)  10.21.2025    
-- -- Order Interior Doors & Trim (0)  10.21.2025    
-- -- Drywall (Hang) (4) *   10.21.2025    
-- -- Loan Approval (0)  10.21.2025    
-- -- Deed Preparation (0)  10.21.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.21.2025    
-- -- Paint 1 (1)  10.21.2025    
-- -- Garage Door (0)  10.21.2025    
-- -- House Numbers (0)  10.21.2025    
-- -- Mailbox (0)  10.21.2025    
-- -- Cabinet Installation (2) *   10.21.2025    
-- -- Granite Installation (1) *   10.21.2025    
-- -- Interior Trim - Install (3) *   10.21.2025    
-- -- Order Plumbing / Lighting Fixtures (0)  10.21.2025    
-- -- Interior Trim - Paint (1)  10.21.2025    
-- -- Luxury Vinyl Plank (3) *   10.21.2025    
-- -- Luxury Vinyl Tile (0)  10.21.2025    
-- -- Paint 2 (3)  10.21.2025    
-- -- Cover Floors (0)  10.21.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.21.2025    
-- -- Shoe Moulding (0)  10.21.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   10.21.2025    
-- -- Install Coded Lockbox (add extra keys) (0)  10.21.2025    
-- -- Pay Water / Sewer Taps (0)  10.21.2025    
-- -- Set Water Meter (1) *   10.21.2025    
-- -- Electric Trim Out (3) *   10.21.2025    
-- -- Ceiling Fans (0)  10.21.2025    
-- -- HVAC Trim Out (1) *   10.21.2025    
-- -- Blower Door Test (1)  10.21.2025    
-- -- Plumbing Trim Out (2) *   10.21.2025    
-- -- Install Appliances (0) *   10.21.2025    
-- -- Paint 3 (2) *   10.21.2025    
-- -- Carpet (2)  10.21.2025    
-- -- Appraiser Confirms Construction Completion (0)  10.21.2025    
-- -- Inspection (Final HVAC) (0)  10.21.2025    
-- -- Inspection (Final Plumbing) (0)  10.21.2025    
-- -- Inspection (Final Electric) (0)  10.21.2025    
-- -- Inspection (Final Building) (4) *   10.21.2025    
-- -- Pre Walk Through (0)  10.21.2025    
-- -- Stain Hardwood Stairs (1) *   10.21.2025    
-- -- Cleaning (1)  10.21.2025    
-- -- Certificate of Occupancy (1) *   10.21.2025    
-- -- C.O. to Lender (0)  10.21.2025    
-- -- Schedule Closing (0)  10.21.2025    
-- -- Buyer Walk Through (1) *   10.21.2025    
-- -- Payment for Upgrades (0)  10.21.2025    
-- -- Keys to Settlement Agent (0)  10.21.2025    
-- -- Review Settlement Statement (0)  10.21.2025    
-- -- Jerry Signs Closing Documents (0)  10.21.2025    
-- -- Request Trash Tote From POA Manager (0)  10.21.2025    
-- -- Closing (1)  10.21.2025    
-- -- Remove Coded Lockbox (0)  10.21.2025