CONGERS-3 - 37  ::  1450 Derby Drive
[ BUILD: 20242192 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Fix, bonus room window On order
--   --   Exterior of kitchen window chipped on the upper right corner On order
--   --   Scratch on front of refrigerator Door on order
Sun    Nov 2      Remove Coded Lockbox (0)      
--   --   Hoping to close by July 11
--   --   The top section of all the main level stairs is missing 37/26 only
--   --   Farm Sink arriving Thursday 5/22.
--   --   Termite treatement, documents
--   --   Are these houses getting a patio or a deck on lower level
--   --   Are these houses getting a patio or a deck on lower level
--   --   Spice rack is installed, but needs adjustments to open and close easily Fred
--   --   Door frame needs to be repaired in closet under stairs in foyer level Jesus
--   --   Sand and paint behind trim on inside of upstairs hallway bathroom door Jesus
--   --   Master vanity countertop needed
--   --   Privacy divider needed
--   --   I’m assuming all the patios are going to get steps to the backyard?
--   --   Cover quartz countertops
--   --   Clean off master marble countertop from previous installation Jill
--   --   Side splash Needed for master countertop Tom. I think matches correctly...thoughts?
--   --   Powder bath needs mirror installed Paul
--   --   Kitchen island needs electrical outlets Electrician
--   --   Make sure correct thermostat has been ordered as other thermostats are install installed in other units Tom to take it down from the trailer
--   --   Globe needed on light and foyer. Space In foyer, Electrician
--   --   HVAC vent at the top of the stairs needs to be installed
--   --   Install the shower walls
--   --   Install ceiling fan cover, an exterior front light Electrician
--   --   Is the lock supposed to be gold on the black keypad?
--   --   Gutters need to be reworked with the addition of the step to the patio
--   --   CODED LOCKBOX 3737
--   --   Not correct thermostat!
--   --   Shower door needed Mon, Aug 18
--   --   Repaint front door second coat Jesus
--   --   Install back patio screen
--   --   Remove extra mirror from bonus room closet Paul
--   --   Install ceiling fan in living room Electrician
--   --   Install cable cover Jill
--   --   Fix drywall in smaller bedroom Jesus
--   --   Sand down a bit on ceiling in master bedroom Jesus - tray ceiling
--   --   Caulk needed on side shower walls Jesus
--   --   Sand joint under stairs on first floor Jesus
--   --   Without drywall corners, Tracy ceiling primary bedroom
--   --   Major issues shower walls
--   --   Adjust primary ceiling fan control handler so the remote can go all the way down
--   --   Swap out bathroom top of water tank
--   --   Restain steps
--   --   Board to be attached y see patio door
--   --   Attach board under patio door
--   --   Adjust 9” spice drawer Fred
--   --   Secure show at island evenly and fill and paint nail holes
--   --   Scrape garage floor Jill
--   --   Remote control holder in primary bedroom needs to be adjusted so the remote can slide all the way down Buddy
--   --   Secure the shoe molding at the island fill and paint nail holes Luke will check
--   --   Fill and paint nail holes at shoe, all vanities Jill
--   --   Jesus to leave extra paint Luke will ask
--   --   Shelf needed for Upper cabinet to the right of the microwave Kate has ordered from Fred. Swapped with another shelf
--   --   Power wash front and back Jill
--   --   Trim at front of farmhouse sink Fred
--   --   Screens Jill
--   --   Replace shower panels New corner piece - Jason
--   --   Luke Rogers, 540-830-5097
--   --   Final paint touch up Bathroom wall, etc. - Jesus
-- -- Ratified Contract? (0)  12.17.2024    
    Credit towards upgrades per Jerry  
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Expanded Driveway  
    White Upgraded Kitchen Cabinetry  
    White Upgraded Bathroom Cabinetry  
    Level 3 Quartz Kitchen Countertops  
    White Farmhouse Sink  
    French Model Refrigerator  
    Cabinet Crown Moulding  
    Double Pull Out Waste Basket in Island  
    2 Roll Out Trays in Lower 36"  
    Spice Rack in B9" cabinet  
    Microwave vented to exterior  
    White Subway Tile Shower Walls  
    Heavy Bi-Pass Shower Door with Black Trim  
    Stained Hardwood Treads to bedroom level  
    Additional Ceiling Fan in Living Room  
    Digital Deadbolt  
    EcoBee 3 Lite Smart WiFi enabled Thermostat  
    Garage Door Opener Keypad (no charge)  
    Amendment to increase price by $23,475  
-- -- $2500 Deposit Received (0)  12.21.2024    
-- -- Association Packet Requested (0)  06.30.2025    
-- -- Association Packet Received (0)  12.20.2024    
-- -- Selections Meeting (0)  12.31.2024    
-- -- Selections Sheet Signed (0)  01.02.2025     1/1: sent to Luke for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  01.12.2025     1/11: sent to Jerry to sign
-- -- Deposit For Upgrades Received (0)  01.11.2025    
-- -- Building Permit (30) *   11.22.2024    
-- -- Order Roof & Floor Trusses (1)  02.20.2025    
-- -- Order Windows & Doors (0)  12.30.2024    
-- -- Stake Out Home (1)  12.02.2024    
-- -- Excavate (2)  12.02.2024    
-- -- Inspection (Footers) (1)  12.02.2024    
-- -- Inspection (Concrete Wall) (1)  12.02.2024    
-- -- Pour Footers (1) *   08.24.2025    
-- -- Set Forms (2)  12.19.2024    
-- -- Pour Foundation Walls (1)  12.19.2024    
-- -- Plumb Slab (2)  12.30.2024    
-- -- Inspection (Plumbing Under Slab) (1)  12.30.2024    
-- -- Inspection (Conduit Under Slab) (1)  12.30.2024    
-- -- Prepare Slab (1)  02.02.2025    
-- -- Inspection (Slab) (1)  02.20.2025    
-- -- Inspection (Drain Tile) (0)  06.09.2025    
-- -- Pour Slab (1) *   08.24.2025    
-- -- Settlement Agent Confirmed (0)  06.24.2025    
-- -- Framing I (9)  03.29.2025    
-- -- Order Steps (0)  04.03.2025    
-- -- Order Tubs / Showers (0)  04.07.2025    
-- -- Framing II (8)  03.29.2025    
-- -- Framing III (8) *   08.24.2025    
-- -- Verify Window & Roof Structure (0)  05.07.2025    
-- -- Install Stairs (0) *   05.07.2025    
-- -- Windows & Doors (0) *   08.24.2025    
-- -- House Number and Status in Window (0)  05.19.2025    
-- -- Roofing (0) *   08.24.2025    
-- -- Order Cabinets (0)  06.23.2025    
-- -- Order Appliances (0)  06.09.2025    
-- -- Deck (0)  06.15.2025     Standard
-- -- Gutters (0)  07.04.2025    
-- -- Driveway (0) *   08.24.2025    
-- -- Patio (0)  06.15.2025     Standard
-- -- Privacy Divider / Fence (0) *   08.24.2025    
-- -- Sod / Seed / Landscaping (0)  08.12.2025    
-- -- HVAC Rough In (4)  04.26.2025    
-- -- Rough In Microwave Vent (0)  04.26.2025     Vented to Exterior
-- -- Plumbing Rough In (4)  05.14.2025    
-- -- Electric Rough In (4)  05.21.2025    
-- -- Inspection (Rough In HVAC) (1)  05.21.2025    
-- -- Inspection (Rough In Plumbing) (1)  05.21.2025    
-- -- Inspection (Rough In Electric) (1)  05.21.2025    
-- -- Inspection (Framing) (1) *   08.24.2025    
-- -- Inspection (Deck Piers) (0)  06.24.2025    
-- -- Exterior Vinyl (0) *   08.24.2025    
-- -- Exterior Stone (0)  07.28.2025    
-- -- Insulation (2) *   08.24.2025    
-- -- Inspection (Insulation) (1)  05.22.2025    
-- -- Inspection (Electric Service) (0)  06.12.2025    
-- -- Set Electric Meter (0) *   08.24.2025    
-- -- Inspection (Main Sewer Line) (0)  06.09.2025    
-- -- Inspection (Main Water Line) (0)  06.09.2025    
-- -- Order Interior Doors & Trim (0)  06.24.2025    
-- -- Drywall (Hang) (4) *   08.24.2025    
-- -- Loan Approval (0)  08.15.2025     JoDee @ United Bank (80% LTV)
-- -- Deed Preparation (0)  06.24.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   08.24.2025     In process 6/4
-- -- Paint 1 (1)  06.15.2025    
-- -- Garage Door (0)  08.03.2025    
-- -- House Numbers (0)  07.14.2025    
-- -- Mailbox (0)  07.03.2025    
-- -- Cabinet Installation (2) *   08.24.2025     In process 6/18
-- -- Granite Installation (1) *   08.24.2025    
-- -- Interior Trim - Install (3) *   08.24.2025     In process 6/25
-- -- Order Plumbing / Lighting Fixtures (0)  06.12.2025    
-- -- Interior Trim - Paint (1)  07.02.2025    
-- -- Luxury Vinyl Plank (3) *   08.24.2025     In process 7/9
-- -- Luxury Vinyl Tile (0)  07.12.2025    
-- -- Paint 2 (3)  07.18.2025     In process 7/16
-- -- Cover Floors (1)  07.30.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  06.19.2025    
-- -- Shoe Moulding (0)  07.16.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   08.24.2025    
-- -- Install Coded Lockbox (add extra keys) (0)  08.13.2025    
-- -- Pay Water / Sewer Taps (0)  06.30.2025    
-- -- Set Water Meter (0) *   08.24.2025    
-- -- Electric Trim Out (3) *   08.03.2025     Ceiling fans and a few electrical outlet covers and smoke alarms needed. Powder bath needs light fixture as well.
-- -- Ceiling Fans (0)  08.21.2025     Still need ceiling fan in living room
-- -- HVAC Trim Out (1) *   08.24.2025     HVAC trimout is completed except thermostat
-- -- Blower Door Test (1)  08.15.2025    
-- -- Plumbing Trim Out (2) *   08.24.2025     Bonus bathroom vanity needs trimmed out. Primary shower and pedestal sink too.
-- -- Install Appliances (0) *   08.24.2025     French/ Current Date: 7/7. On site 6/27
-- -- Paint 3 (2) *   08.24.2025    
-- -- Carpet (2)  07.18.2025    
-- -- Appraiser Confirms Construction Completion (0)  08.19.2025    
-- -- Inspection (Final HVAC) (1)  08.15.2025     Scheduled for Friday 8/15
-- -- Inspection (Final Plumbing) (1)  08.15.2025    
-- -- Inspection (Final Electric) (1)  08.15.2025    
-- -- Inspection (Final Building) (2) *   08.24.2025    
-- -- Pre Walk Through (0)  08.18.2025    
-- -- Stain Hardwood Stairs (1) *   08.24.2025    
-- -- Cleaning (1)  08.20.2025     in process 8/16
-- -- Certificate of Occupancy (1) *   08.24.2025    
-- -- C.O. to Lender (0)  08.19.2025    
-- -- Schedule Closing (0)  08.19.2025    
-- -- Buyer Walk Through (1) *   08.24.2025    
-- -- Payment for Upgrades (0)  08.15.2025    
-- -- Keys to Settlement Agent (0)  08.15.2025    
-- -- Review Settlement Statement (0)  08.19.2025    
-- -- Jerry Signs Closing Documents (0)  08.20.2025    
-- -- Request Trash Tote From POA Manager (0)  08.15.2025    
-- -- Closing (1)  08.21.2025     Brittany @ West View Title