Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Order Appliances (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
Thu |
Dec 12 |
Schedule Closing (0) |
|
|
Thu |
Dec 12 |
Keys to Settlement Agent (0) |
|
|
Thu |
Dec 12 |
Review Settlement Statement (0) |
|
|
Thu |
Dec 12 |
Jerry Signs Closing Documents (0) |
|
|
Thu |
Dec 12 |
Request Trash Tote From POA Manager (0) |
|
|
Thu |
Dec 12 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Install Steps |
|
|
-- |
-- |
Order four foot corner tub from Lowe's |
Kate has ordered |
|
-- |
-- |
Add missing windows and doors |
|
|
-- |
-- |
Tile above corner tub |
Need to grout |
|
-- |
-- |
Trim around arched window |
|
|
-- |
-- |
Hardwood laminate and front two bedrooms incorrect. Cane Hickory. See selection sheet. |
Kate will talk to buyers; Eric offering $300 credit. |
|
-- |
-- |
Six crown in kitchen |
|
|
-- |
-- |
Fix cabinet crown in kitchen |
Hopefully tomorrow |
|
-- |
-- |
Select and paint front door |
|
|
-- |
-- |
Is master bath backsplash seaside beige? Looks darker than floor tile |
|
|
-- |
-- |
Finish grouting tile backsplash in master bathroom |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Tom thank you for covering granite |
|
|
-- |
-- |
Half the lights don't work. Call Harry |
|
|
-- |
-- |
Electrical trim out |
|
|
-- |
-- |
Touch up paint |
|
|
-- |
-- |
Final cleaning....touch up |
|
|
-- |
-- |
Bonus room vent cover |
|
|
-- |
-- |
Address white trim boards above windows on first floor |
|
|
-- |
-- |
Landscape? |
|
|
-- |
-- |
Replace front door |
Osbaldo |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
Happening April 11; |
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
Waiting on dry weather |
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
Pin footers May 24; |
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
Gravel May 26, plumbing May 27 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
June 1 |
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
June 6 |
|
-- |
-- |
Pour Slab (1) * |
June 10 |
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
August 8 |
|
-- |
-- |
Plumbing Rough In (4) |
Install tub |
|
-- |
-- |
Electric Rough In (4) |
Starting July 27 |
|
-- |
-- |
Exterior Vinyl (0) * |
K: in process |
|
-- |
-- |
Insulation (2) |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
Soon |
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
|
|
-- |
-- |
Paint 1 (1) |
Start painting Aug 25 |
|
-- |
-- |
Garage Door (0) |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Deliver 9/5, install 9/5 |
|
-- |
-- |
Granite Installation (1) * |
9/23 |
|
-- |
-- |
Interior Trim - Install (3) |
In process |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Sept 27 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
In progress (Marcus) |
|
-- |
-- |
Paint 2 (3) |
In process complete by 9/17 |
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Almost complete- pantry. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Nearly complete |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
Set Friday morning |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
September 26 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Tom to call today to schedule for Tuesday |
|
-- |
-- |
Pre Walk Through (0) |
Monday 10/10 at 4:00 |
|
-- |
-- |
Cleaning (1) |
Kelly this weekend |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Monday at four |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Closing (1) |
|
|