Mini-split |
|
|
Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Order Tubs / Showers (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Install Stairs (0) |
|
|
Fri |
Nov 29 |
House Number and Status in Window (0) |
|
|
Fri |
Nov 29 |
Order Appliances (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Garage Door (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Dec 5 |
Shoe Moulding (0) |
|
|
Thu |
Dec 5 |
Set Water Meter (0) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Paint 3 (2) * |
|
|
Tue |
Dec 10 |
Inspection (Final HVAC) (1) |
|
|
Wed |
Dec 11 |
Inspection (Final Plumbing) (1) |
|
|
Thu |
Dec 12 |
Inspection (Final Electric) (1) |
|
|
Fri |
Dec 13 |
Stain Hardwood Stairs (1) |
|
|
Mon |
Dec 16 |
Schedule Closing (0) |
|
|
Mon |
Dec 16 |
Payment for Upgrades (0) |
|
|
Mon |
Dec 16 |
Keys to Settlement Agent (0) |
|
|
Mon |
Dec 16 |
Review Settlement Statement (0) |
|
|
Mon |
Dec 16 |
Jerry Signs Closing Documents (0) |
|
|
Mon |
Dec 16 |
Request Trash Tote From POA Manager (0) |
|
|
Mon |
Dec 16 |
Closing (1) |
|
|
Tue |
Dec 17 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Schedule framing and electrical walk through with buyer |
|
|
-- |
-- |
Get price for painting one room with different color trim |
|
|
-- |
-- |
Hardwood treads |
|
|
-- |
-- |
Final HVAC work |
condensate line, line set for mini split |
|
-- |
-- |
Buyer has told lender the house will be complete on June 5 |
|
|
-- |
-- |
Beam at back porch |
|
|
-- |
-- |
Please cover tub and shower before drywall |
|
|
-- |
-- |
Closet in bonus room? |
|
|
-- |
-- |
Working on retaining wall this morning |
|
|
-- |
-- |
Please cover granite |
|
|
-- |
-- |
Finish hardwood |
Memorial Day |
|
-- |
-- |
Trash and Parking Issues |
|
|
-- |
-- |
Garage Door Installation |
|
|
-- |
-- |
Siding and J Channel |
May 22: This week |
|
-- |
-- |
CO to Angel Fitzgerald (lender) |
|
|
-- |
-- |
Asphalt driveway |
Tom following up with Channon |
|
-- |
-- |
Time to switch out dining light |
|
|
-- |
-- |
Transition strips between hardwood and ceramic and several locations |
Eric |
|
-- |
-- |
Staining steps |
Isaac - Fri, Jun 1 |
|
-- |
-- |
Paint access panel in up closet bedroom |
Isaac |
|
-- |
-- |
Bath hardware in up hall bath |
Ron |
|
-- |
-- |
Set door into attic in up bedroom closet |
Tom |
|
-- |
-- |
Shoe mold nail holes fill and paint |
|
|
-- |
-- |
Paint front door |
Isaac |
|
-- |
-- |
Stain Steps |
Mon, Jun 5 |
|
-- |
-- |
Doorway to storage over garage |
|
|
-- |
-- |
Need Touch Up Kit |
Kate emailed Gabby |
|
-- |
-- |
Excess Glue in Master Bedroom and glue in master shower |
Kate emailed Eric |
|
-- |
-- |
Move Robe hook, raise shelf in laundry for raised washer/dryer, add hardware to bypass pantry doors in kitchen |
Ron- Monday |
|
-- |
-- |
Fix trim ( gap between casing and floor) on the bottom of many of the doors |
Fixed-needs caulk and paint |
|
-- |
-- |
Transition strip between up hall bath and floor has a gap |
Eric- still needs to be secured |
|
-- |
-- |
Extend and bury drain pipe in front yard |
Osbaldo |
|
-- |
-- |
Finish installing mini split |
Ronnie- ordering part |
|
-- |
-- |
Drywall repair - wall above door to bonus room and both up bedroom ceilings |
McClung- Friday 6/8 |
|
-- |
-- |
Missing Tube Light in up Hall Closet |
Tom/Osbaldo |
|
-- |
-- |
Cover Up Bedroom Floors to protect from drywall repair |
Osbaldo ( first thing Friday morning 6/8) |
|
-- |
-- |
Paint touch up (finish risers and spindles, blue tape areas, check back of master closet, paint all white closets |
Isaac- Friday 6/8 |
|
-- |
-- |
Wash off siding |
Osbaldo |
|
-- |
-- |
BUYERS WANT TO CLOSE TUESDAY????? |
|
|
-- |
-- |
2 additional areas marked with blue tape in garage |
Tom/Osbaldo |
|
-- |
-- |
Floor touch ups in room over garage |
Osbaldo |
|
-- |
-- |
Take up paper- mop floors one more time |
|
|
-- |
-- |
Nail pops to be filled in trim around window at front door |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
Dec 13 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Windows & Doors (0) |
Mon, Feb 13 |
|
-- |
-- |
Roofing (0) |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
Mostly done |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Inspections 3/7 |
|
-- |
-- |
Plumbing Rough In (4) |
Starting 2/20/2017 |
|
-- |
-- |
Electric Rough In (4) |
3/5 - in process |
|
-- |
-- |
Exterior Vinyl (0) * |
In process |
|
-- |
-- |
Insulation (2) |
Nearly complete |
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
Harry needs to mount the meter base; |
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
Ordering when drywall begins |
|
-- |
-- |
Drywall (Hang) (4) * |
1/27 beginning today |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Sanding- will be complete by 4/11 |
|
-- |
-- |
Paint 1 (1) |
Wednesday 4/12 |
|
-- |
-- |
House Numbers (0) |
Osbaldo |
|
-- |
-- |
Cabinet Installation (2) * |
4/17 installation nearly complete |
|
-- |
-- |
Granite Installation (1) * |
|
|
-- |
-- |
Interior Trim - Install (3) |
4/24- trim in process |
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
5/8 complete upstairs bathroom |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
5/15-Today- big job need to finish master |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
Ron |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
Harry- Thursday-Friday 6/1-6/2 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Mon, June 12 |
|
-- |
-- |
Pre Walk Through (0) |
Wednesday morning |
|
-- |
-- |
Cleaning (1) |
Tuesday - Wednesday |
|
-- |
-- |
Certificate of Occupancy (1) * |
NEED ASAP |
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
4PM on Wednesday |
|