Wed    Nov 27      Ratified Contract? (0)      
Wed    Nov 27      $2500 Deposit Received (0)      
Wed    Nov 27      Association Packet Requested (0)      
Wed    Nov 27      Association Packet Received (0)      
Wed    Nov 27      Selections Meeting (0)      
Wed    Nov 27      Selections Sheet Signed (0)      
Wed    Nov 27      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Wed    Nov 27      Deposit For Upgrades Received (0)      
Wed    Nov 27      Inspection (Concrete Wall) (1)      
Thu    Nov 28      Inspection (Conduit Under Slab) (1)      
Fri    Nov 29      Inspection (Drain Tile) (0)      
Fri    Nov 29      Settlement Agent Confirmed (0)      
Fri    Nov 29      Verify Window & Roof Structure (0)      
Fri    Nov 29      Order Appliances (0)      
Fri    Nov 29      Patio (0)      
Fri    Nov 29      Rough In Microwave Vent (0)      
Fri    Nov 29      Inspection (Rough In Plumbing) (1)      
Mon    Dec 2      Inspection (Rough In Electric) (1)      
Tue    Dec 3      Inspection (Deck Piers) (0)      
Tue    Dec 3      Inspection (Framing) (1)      
Wed    Dec 4      Exterior Stone (0)      
Wed    Dec 4      Set Electric Meter (0)      
Wed    Dec 4      Inspection (Main Water Line) (0)      
Wed    Dec 4      Loan Approval (0)      
Wed    Dec 4      Deed Preparation (0)      
Wed    Dec 4      Mailbox (0)      
Wed    Dec 4      Interior Trim - Paint (1)      
Thu    Dec 5      Ceiling Fans (0)      
Thu    Dec 5      Blower Door Test (1)      
Fri    Dec 6      Inspection (Final HVAC) (1)      
Mon    Dec 9      Inspection (Final Plumbing) (1)      
Tue    Dec 10      Inspection (Final Electric) (1)      
Wed    Dec 11      Stain Hardwood Stairs (1)      
Thu    Dec 12      Request Trash Tote From POA Manager (0)      
--   --   Upstairs broken window (pic) Tom to pick up
--   --   Deputy Fire Chrief- would like rock instead of mulch?
--   --   Update on price for parking space?
--   --   Fix Site Sign Blown by wind
--   --   Lease terminates at the end of May
--   --   Missing master vanity doors
--   --   Paint attic access panel
--   --   Paint access panels in room over garage
--   --   Trim closet door upstairs closet outside of room over garage
--   --   Adjust all upstairs closet doors Osbaldo
--   --   Drywall patch is needed in upstairs hall bathroom
--   --   Missing overflow cover in upstairs hall tub
--   --   Finish kitchen cabinetry
--   --   Clean out garage
--   --   Coded Lockbox 4444
--   --   Dining room light correct?
--   --   Water leak repair
--   --   Cabinet wont close-lazy Susan Kyle
--   --   Missing upper cabinet trim Kyle
--   --   Install chandelier Harry
--   --   Add smoke detector Harry
--   --   Cleaning after drywall patch Kelly
--   --   Drywall repair from plumbing leak
-- -- Building Permit (30)       Mindy will check on this;
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)       Mindy will schedule
-- -- Pour Footers (1)      
-- -- Set Forms (2)       Tues, Aug 15
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)       Alex
-- -- Inspection (Plumbing Under Slab) (1)       Tom checking
-- -- Prepare Slab (1)       Osbaldo to form
-- -- Inspection (Slab) (1)       Tom will order
-- -- Pour Slab (1) *        11/27: Will happen soon-ish
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0)      
-- -- House Number and Status in Window (0)      
-- -- Roofing (0)      
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0)       Concrete done
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Maybe a few more items to resolve
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)       Finishing Feb 12
-- -- Exterior Vinyl (0) *        In process as of Mar 18
-- -- Insulation (2)       Feb 15 ?
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       SVEC - soon as of Mar 18
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *        Finishing Mar 11
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        In process as of Mar 14
-- -- Paint 1 (1)       Thu, Mar 28
-- -- Garage Door (0)       Greg will schedule - Apr 1
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        On site 4/17
-- -- Granite Installation (1) *        Install 5/7
-- -- Interior Trim - Install (3)       Started as of Apr 1/appears 95% completed 4/7
-- -- Order Plumbing / Lighting Fixtures (0)      
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       Installing 4/24
-- -- Paint 2 (3)       Tom will tell Isaac to paint week of Apr 8
-- -- Cover Floors (1)       Walking path
-- -- Deliver Plumbing / Lighting Fixtures (0)       Checking
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       Tom will remind Ron that we are ready
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0)       May 20
-- -- Electric Trim Out (3)       Harry- complete on Thursday 5/16
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Bobby
-- -- Install Appliances (0) *        May 20
-- -- Paint 3 (2) *       
-- -- Carpet (2)       5/7
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        May 21
-- -- Pre Walk Through (0)       Kate 5/14
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Schedule Closing (0)      
-- -- Buyer Walk Through (1)       Tuesday, May 21 at 3:30 PM
-- -- Payment for Upgrades (0)       $1,660
-- -- Keys to Settlement Agent (0)      
-- -- Review Settlement Statement (0)      
-- -- Jerry Signs Closing Documents (0)      
-- -- Closing (1)      
-- -- Remove Coded Lockbox (0)