Wed |
Nov 27 |
Ratified Contract? (0) |
|
|
Wed |
Nov 27 |
$2500 Deposit Received (0) |
|
|
Wed |
Nov 27 |
Association Packet Requested (0) |
|
|
Wed |
Nov 27 |
Association Packet Received (0) |
|
|
Wed |
Nov 27 |
Selections Meeting (0) |
|
|
Wed |
Nov 27 |
Selections Sheet Signed (0) |
|
|
Wed |
Nov 27 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Wed |
Nov 27 |
Deposit For Upgrades Received (0) |
|
|
Wed |
Nov 27 |
Inspection (Concrete Wall) (1) |
|
|
Thu |
Nov 28 |
Inspection (Conduit Under Slab) (1) |
|
|
Fri |
Nov 29 |
Inspection (Drain Tile) (0) |
|
|
Fri |
Nov 29 |
Settlement Agent Confirmed (0) |
|
|
Fri |
Nov 29 |
Verify Window & Roof Structure (0) |
|
|
Fri |
Nov 29 |
Patio (0) |
|
|
Fri |
Nov 29 |
Rough In Microwave Vent (0) |
|
|
Fri |
Nov 29 |
Inspection (Rough In Plumbing) (1) |
|
|
Mon |
Dec 2 |
Inspection (Rough In Electric) (1) |
|
|
Tue |
Dec 3 |
Inspection (Deck Piers) (0) |
|
|
Tue |
Dec 3 |
Inspection (Framing) (1) |
|
|
Wed |
Dec 4 |
Exterior Stone (0) |
|
|
Wed |
Dec 4 |
Set Electric Meter (0) |
|
|
Wed |
Dec 4 |
Inspection (Main Water Line) (0) |
|
|
Wed |
Dec 4 |
Loan Approval (0) |
|
|
Wed |
Dec 4 |
Deed Preparation (0) |
|
|
Wed |
Dec 4 |
Mailbox (0) |
|
|
Wed |
Dec 4 |
Interior Trim - Paint (1) |
|
|
Thu |
Dec 5 |
Ceiling Fans (0) |
|
|
Thu |
Dec 5 |
Blower Door Test (1) |
|
|
Fri |
Dec 6 |
Inspection (Final HVAC) (1) |
|
|
Mon |
Dec 9 |
Inspection (Final Plumbing) (1) |
|
|
Tue |
Dec 10 |
Inspection (Final Electric) (1) |
|
|
Wed |
Dec 11 |
Stain Hardwood Stairs (1) |
|
|
|
-- |
-- |
Swamp |
|
|
-- |
-- |
Plan for retention pond? |
|
|
-- |
-- |
Will basement walls be insulated? |
Tell Jared Sheets |
|
-- |
-- |
One more window |
on site 3/29 |
|
-- |
-- |
Leave laundy room upstairs! |
|
|
-- |
-- |
Extra set of steps? |
|
|
-- |
-- |
Set and wrap porch posts |
|
|
-- |
-- |
Possibly adding basement bath? 6/1 |
Definitely adding full bath-tub in 6/17 |
|
-- |
-- |
Tom getting price for finished basement 6/11 |
24,600 (no bathroom). Kate emailing agent. Maybe after closing 6/18 |
|
-- |
-- |
Steps needed to porch-before driveways? 6/24 |
|
|
-- |
-- |
Ceramic tile in basement bath installed 6/25 |
|
|
-- |
-- |
MB shower/tub? 2 shower heads??? 7/8 |
|
|
-- |
-- |
Home Inspection, July 30th |
Pushed off. Waiting to hear from inspector |
|
-- |
-- |
Paint left side of outside basement wall 7/26 |
Reminded Issac. not yet painted 8/19 waiting on dry ground |
|
-- |
-- |
Hole in garage ceiling 7/26 |
set to be fixed friday 7/31 |
|
-- |
-- |
|
|
|
-- |
-- |
Discolored cabinets in kitchen |
On order - waiting on arrival date GWB-I think they have been replaced 8/15 |
|
-- |
-- |
Entry light/stair light snap lights-correct? |
|
|
-- |
-- |
Home Inspection - Aug 12 @ 9AM |
|
|
-- |
-- |
Fridge on back order |
Amana installed 8/15. |
|
-- |
-- |
HVAC issue in garage (hole) |
and duct work that was moved in basement by JB for venting |
|
-- |
-- |
CODED LOCKBOX 7777 |
|
|
-- |
-- |
Vanity lights needed 8/12 |
|
|
-- |
-- |
Actual refrigerator arrives September 8 |
Greg will follow up with Leisa |
|
-- |
-- |
Railing to basement |
|
|
-- |
-- |
Paint front door |
Galindez to paint 8/21 when the stain steps |
|
-- |
-- |
Half bath mirror (on site) |
|
|
-- |
-- |
Floor register in bedroom |
& Master |
|
-- |
-- |
Patch/paint shower head hole |
JB patching 8/26 |
|
-- |
-- |
Fix gutter downspout near garage |
|
|
-- |
-- |
Missing light bulbs? |
|
|
-- |
-- |
Paint attic access 8/19 |
Galindez painting 8/31 GWB |
|
-- |
-- |
Light bulb vanity upstairs bath 8/19 |
Greg will bring bulbs today 8/24 GWB |
|
-- |
-- |
Home Inspection Wed - Aug 26th at 4:30pm |
|
|
-- |
-- |
Molding for cabinets |
JB to finish - in process 8/23 |
|
-- |
-- |
911 numbers at thr lad to pass inspection |
|
|
-- |
-- |
911 numbers at the road |
To pass inspection (note on counter from 8/21) |
|
-- |
-- |
Paint touch up 8/26 |
Few spots need painting. 9/6 |
|
-- |
-- |
Cable box cover |
Harry to bring over GWB |
|
-- |
-- |
Temporary water hoses? Splash blocks needed? 8/29 |
|
|
-- |
-- |
Electric/cable cover needed in garage 8/29 |
|
|
-- |
-- |
Move mulch away from siding |
|
|
-- |
-- |
Pressure wash porch/garage? 9/2 |
JB |
|
-- |
-- |
Paint touch up |
galindez going over 9/14 GWB |
|
-- |
-- |
get paint of front patio |
galindez going over 9/14 GWB |
|
-- |
-- |
touch up cabinets |
Greg to touch up with kit 9/14 GWB |
|
-- |
-- |
Fan pull in living room does not work |
Harry back in town and will fix 9/22 GWB |
|
-- |
-- |
master bath mirror has small crack |
Ron to replace mirror. Scheduling with homeowners GWB |
|
-- |
-- |
Obed - (540) 209-5080 |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) |
|
|
-- |
-- |
Set Forms (2) |
Week of Jan 6 |
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
in process 2/8 |
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
Today 2/14 GWB |
|
-- |
-- |
Framing I (9) |
in process 2/22 |
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) |
just one left to install 3/8 |
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) |
in process 3/13 |
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
waiting on premier vinyl |
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) |
Asphalt-paved 8/12 |
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
Reinspect 5/12 |
|
-- |
-- |
Plumbing Rough In (4) |
Monday, April 27 |
|
-- |
-- |
Electric Rough In (4) |
in process 5/9 |
|
-- |
-- |
Exterior Vinyl (0) * |
All except front porch 4/12 |
|
-- |
-- |
Insulation (2) |
Wed 5/13 |
|
-- |
-- |
Inspection (Insulation) (1) |
today 5/18 |
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
Working on it 7/29 |
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
IN process 5/25 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
In process 6/17 |
|
-- |
-- |
Paint 1 (1) |
Set to start 6/18 per Issac GWB |
|
-- |
-- |
Garage Door (0) |
Set to install 6/16 gwb |
|
-- |
-- |
House Numbers (0) |
House numbers up |
|
-- |
-- |
Cabinet Installation (2) * |
Sink to deliver 7/13 and David to finish 7/14 GWB |
|
-- |
-- |
Granite Installation (1) * |
Installed July 29 |
|
-- |
-- |
Interior Trim - Install (3) |
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
|
|
-- |
-- |
Luxury Vinyl Tile (0) |
In process. Basement bath too 6/24 |
|
-- |
-- |
Paint 2 (3) |
Trim/doors need painting 7/26 Issac guys to paint begining of next week |
|
-- |
-- |
Cover Floors (1) |
Tom to ask Jill - Wed, Jul 22 |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Tom has them |
|
-- |
-- |
Shoe Moulding (0) |
Set to finish Friday 8/7 GWB |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) |
In process 8/12 set to finish 8/14 GWB |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
Paid 6/3 |
|
-- |
-- |
Set Water Meter (0) |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 8/8 |
|
-- |
-- |
HVAC Trim Out (1) |
HVAC on back order. set to come in next week 8/21 |
|
-- |
-- |
Plumbing Trim Out (2) |
Hawkeye started 8/7 set to finish 8/10 |
|
-- |
-- |
Install Appliances (0) * |
Dishwasher/micro on site 7/26 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
Re-inspection Friday, August 21 |
|
-- |
-- |
Pre Walk Through (0) |
Greg to walk through today 8/24 |
|
-- |
-- |
Cleaning (1) |
Is Jill finishing? |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
Set for Wed 9/16 |
|
-- |
-- |
Buyer Walk Through (1) |
Tuesday, August 25? |
|
-- |
-- |
Payment for Upgrades (0) |
$5,535 Cereda has check |
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
-- |
-- |
Closing (1) |
|
|
-- |
-- |
Remove Coded Lockbox (0) |
Greg will grab today 9/22 |
|