37 ADDR
CONGERS-2 - 40  ::  1647 Bald Eagle Circle
[ BUILD: 1907-0001 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Tue    Dec 16      Inspection (Concrete Wall) (1)      
Wed    Dec 17      Inspection (Conduit Under Slab) (1)      
Thu    Dec 18      Inspection (Drain Tile) (0)      
Thu    Dec 18      Inspection (Rough In Plumbing) (1)      
Fri    Dec 19      Inspection (Rough In Electric) (1)      
Mon    Dec 22      Inspection (Framing) (1) *       
Tue    Dec 23      Inspection (Deck Piers) (0)      
Tue    Dec 23      Inspection (Main Water Line) (0)      
Tue    Dec 23      Inspection (Final HVAC) (1)      
Wed    Dec 24      Inspection (Final Plumbing) (1)      
Thu    Dec 25      Inspection (Final Electric) (1)      
-- -- Inspection (Footers) (1)      
-- -- Inspection (Plumbing Under Slab) (1)       Fri, Aug 30
-- -- Inspection (Slab) (1)      
-- -- Inspection (Rough In HVAC) (1)       Mon, Nov 4
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       Pipe is in
-- -- Inspection (Main Sewer Line) (0)      
-- -- Inspection (Final Building) (2) *        Fri, Jan 31 or Mon, Feb 3 (reinspect Mon Feb 3)