1 73 61 62 63 ADDR
CONGERS-2 - 14  ::  1685 Bald Eagle Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Fri    May 23      Ratified Contract? (0)      
Fri    May 23      $2500 Deposit Received (0)      
Fri    May 23      Association Packet Requested (0)      
Fri    May 23      Association Packet Received (0)      
Fri    May 23      Selections Meeting (0)      
Fri    May 23      Selections Sheet Signed (0)      
Fri    May 23      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Fri    May 23      Deposit For Upgrades Received (0)      
Fri    May 23      Inspection (Concrete Wall) (1)      
Mon    May 26      Inspection (Conduit Under Slab) (1)      
Tue    May 27      Inspection (Drain Tile) (0)      
Tue    May 27      Settlement Agent Confirmed (0)      
Tue    May 27      Verify Window & Roof Structure (0)      
Tue    May 27      Order Appliances (0)      
Tue    May 27      Patio (0)      
Tue    May 27      Rough In Microwave Vent (0)      
Tue    May 27      Inspection (Rough In Plumbing) (1)      
Wed    May 28      Inspection (Rough In Electric) (1)      
Thu    May 29      Inspection (Deck Piers) (0)      
Thu    May 29      Inspection (Framing) (1) *       
Fri    May 30      Exterior Stone (0)      
Fri    May 30      Set Electric Meter (0) *       
Fri    May 30      Inspection (Main Water Line) (0)      
Fri    May 30      Loan Approval (0)      
Fri    May 30      Deed Preparation (0)      
Fri    May 30      Mailbox (0)      
Fri    May 30      Order Plumbing / Lighting Fixtures (0)      
Fri    May 30      Interior Trim - Paint (1)      
Mon    Jun 2      Ceiling Fans (0)      
Mon    Jun 2      Blower Door Test (1)      
Tue    Jun 3      Inspection (Final HVAC) (1)      
Wed    Jun 4      Inspection (Final Plumbing) (1)      
Thu    Jun 5      Inspection (Final Electric) (1)      
Fri    Jun 6      Stain Hardwood Stairs (1)      
Mon    Jun 9      Schedule Closing (0)      
Mon    Jun 9      Keys to Settlement Agent (0)      
Mon    Jun 9      Review Settlement Statement (0)      
Mon    Jun 9      Jerry Signs Closing Documents (0)      
Mon    Jun 9      Request Trash Tote From POA Manager (0)      
Mon    Jun 9      Remove Coded Lockbox (0)      
--   --   Install the last few windows and doors;
--   --   Plumb gas line for stove
--   --   Plumb gas line for fireplace
--   --   Darker Shutters EXACTLY LIKE LOT 32
--   --   No hardwood in alcoves by front door. See note in changes. Please change as soon as possible
--   --   Deck Rail and Steps
--   --   Please cover granite!!! K: 7/25: cover island please
--   --   Basement bath closet flooring? Ceramic tile
--   --   Buyer wants mulch NOT rock
--   --   Drywall arhes
--   --   Drywall arches
--   --   Deck
--   --   Hardwood laminate at the bottom of the steps
--   --   Living room floor vent cut wider
--   --   Bottom trim on shelf at arches?
--   --   Touch up grout in several placesn master bath
--   --   Touch up paint
--   --   Fix baseboard in master linen closet
--   --   Finish trim/ shoe old in downstairs bath closet
--   --   Touch up paint
--   --   Touch up cleaning
--   --   Poly steps and paint risers
--   --   Touch up grout in master bath
--   --   One window on the side of the house is missing shutters Tom
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       4/11: Setting roof trusses;
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0) *        Remainder will arrive May 10;
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *        Shingles going on now;
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *        In process
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)       Tuesday, May 17
-- -- Plumbing Rough In (4)       Plumbing gas line;
-- -- Electric Rough In (4)       Nearly done;
-- -- Exterior Vinyl (0) *        K: 6/20 nearly complete
-- -- Insulation (2) *        Wednesday, May 18
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)       Meter base to be set May 16
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        K: in process
-- -- Paint 1 (1)       Primed on June 10;
-- -- Garage Door (0) *       
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivery June 16; Install June 20;
-- -- Granite Installation (1) *        July 5
-- -- Interior Trim - Install (3) *        K: 6/20 nearly complete
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       7/25 K: Everything complete except shower
-- -- Paint 2 (3)       7/25: K: finishing 7/27
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *        July 25
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Set Water Meter (0) *       
-- -- Electric Trim Out (3)       8/1 almost complete
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Friday, July 29
-- -- Install Appliances (0) *        July 25
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *        Mon, Aug 1
-- -- Pre Walk Through (0)       Mon, Aug 1
-- -- Cleaning (1)       July 30 (Cheryl)
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1)       8/3 at 11:00
-- -- Payment for Upgrades (0)      
-- -- Closing (1)