CONGERS-2 - 15  ::  1687 Bald Eagle Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Final paint touch up 9/22
--   --   Deep crack in wood toward bottom of steps
--   --   New refrigerator door coming in 6 to 8 weeks.
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Order Tubs / Showers (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Install Stairs (0)      
Mon    Dec 2      House Number and Status in Window (0)      
Mon    Dec 2      Order Appliances (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Garage Door (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Cover Floors (1)      
Mon    Dec 9      Deliver Plumbing / Lighting Fixtures (0)      
Mon    Dec 9      Shoe Moulding (0)      
Mon    Dec 9      Set Water Meter (0)      
Mon    Dec 9      Ceiling Fans (0)      
Mon    Dec 9      Blower Door Test (1)      
Tue    Dec 10      Paint 3 (2) *       
Thu    Dec 12      Appraiser Confirms Construction Completion (0)      
Thu    Dec 12      Inspection (Final HVAC) (1)      
Fri    Dec 13      Inspection (Final Plumbing) (1)      
Mon    Dec 16      Inspection (Final Electric) (1)      
Tue    Dec 17      Stain Hardwood Stairs (1)      
Wed    Dec 18      C.O. to Lender (0)      
Wed    Dec 18      Schedule Closing (0)      
Wed    Dec 18      Payment for Upgrades (0)      
Wed    Dec 18      Keys to Settlement Agent (0)      
Wed    Dec 18      Review Settlement Statement (0)      
Wed    Dec 18      Jerry Signs Closing Documents (0)      
Wed    Dec 18      Request Trash Tote From POA Manager (0)      
Wed    Dec 18      Remove Coded Lockbox (0)      
--   --   Install Doors
--   --   Darker than the Darker Shutters Exactly like 32
--   --   Tom please remember buyers want a shampoo shelf in the walk-in shower. 7/18: did buyers change directly with sub?
--   --   Standard light count in basement? ( wired for 6)
--   --   Paint garage door Khaki to match vinyl posts on deck
--   --   Leaks in the basement
--   --   Reframe master bedroom closet pocket doors
--   --   Reframe pocket door in master bathroom
--   --   Put blocking in wall to support posts and handrails leading to basement
--   --   Did buyer paint himself?
--   --   Cracks in foundation?
--   --   Please cover hardwood in living room dining room completely
--   --   Reframe master bedroom closet doors
--   --   Tile master shower 9/8 half way done
--   --   Glass partition wall in master shower Install by Friday 9/16
--   --   Fix stair railing
--   --   Buyer to stain posts, handrail and pickets
--   --   Finish painting (foyer, master bath)
--   --   Paint-stairwell
--   --   Install insulation in gap between door and stationary section
--   --   Replace torn deck screen
--   --   Finish exterior caulk Morning of 9/16
--   --   Finish stucco where deck connects to house Morning of 9/16 - Tom to get stucco from basement of heritage 14
--   --   Replace broken family room window Tom to fix 9/15
--   --   Fix crooked wall
--   --   Put up shutters as is- buyer not painting Tom 9/15
--   --   Finish closet shelving
--   --   Ferguson toilet? Celeste to pick up
--   --   Towel bar install Kate will talk to Ron
--   --   Finish installing floor vents and install rain shower fixture Evening of 9/15
--   --   Fix carpet in several places in master bedroom
--   --   Fix tile in master bath at sliding door to water closet
--   --   Basement bonus room, trim gapping in several places.
--   --   Water in unfinished space off bonus room
--   --   Rocker switch at the bottom of the stairs loose
--   --   Hardwood touch up
--   --   Adjust master closet doors Tj and JB
--   --   Did crack in hardwood step- third from bottom
--   --   Fix shutters
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1)      
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)       Roof trusses are set;
-- -- Order Steps (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Windows & Doors (0)       K: Windows Set, not doors
-- -- Roofing (0)       K: in process
-- -- Order Cabinets (0)      
-- -- Deck (0)       Nearly complete- missing a few pickets
-- -- Gutters (0)      
-- -- Driveway (0)      
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)       6/6: Mostly done
-- -- Inspection (Rough In HVAC) (1)       June 13 or 14 ?
-- -- Plumbing Rough In (4)       6/6: In progress
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *        K: 6/20 stucco in process, rock starting
-- -- Insulation (2)      
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)       Waiting on sewer connection
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *        K: in process
-- -- Paint 1 (1)      
-- -- House Numbers (0)       Fire extinguisher needed
-- -- Cabinet Installation (2) *        Delivered July 8, Installed July 11
-- -- Granite Installation (1) *       
-- -- Interior Trim - Install (3)       Wed, July 27
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       In process
-- -- Paint 2 (3)       8/22- in process
-- -- Shelving, Door Knobs, Fire Extinguisher (0)       9/8 mostly complete
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)       Afternoon of 9/15
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)       Waiting on tile
-- -- Install Appliances (0) *        Friday, Sept 9
-- -- Carpet (2)       9/12 in process
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)       Monday 9/20
-- -- Cleaning (1)       9/17
-- -- Certificate of Occupancy (1) *       
-- -- Buyer Walk Through (1)       9/21 or 9/22
-- -- Closing (1)