| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Bonus Room | ||||
| Bonus Bath | ||||
| Painted Stairs | ||||
| LVP Up Hallway | ||||
| LVP Bonus Room | ||||
| Egress Window | ||||
| Ceiling Fan | ||||
| Three Drawer Stack 36" | ||||
| White DOUBLE BOWL Farmhouse Sink | ||||
| Amendment to increase price by $22,070 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 01.02.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 01.31.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 03.23.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 03.23.2023 | ||
| -- | -- | Inspection (Slab) (1) 03.23.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 04.17.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 06.12.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 06.12.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 06.12.2023 | ||
| -- | -- | Inspection (Framing) (1) * 06.12.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 06.26.2023 | ||
| -- | -- | Inspection (Insulation) (1) 06.19.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 08.21.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.16.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.16.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 09.16.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 09.16.2023 | ||