000 40 37 20 13 32 31 30 29 28 12 11 10 9 5 6 7 8 1 2 3 4 ADDR
CONGERS-3 - 39  ::  1623 Palomino Trail
[ BUILD: 20241830 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Closing complete on house to be sold? sold Dec 2, 2024
Must close by 1031 deadline!
Few master bedroom floor blemishes. Any issue for flooring folks?
Kitchen cabinet issue?
Strange siding transition at the top Davenport
All electrical plate covers needed after painter finishes Jesus. Still a few missing 3/19
Cut back or cut down leaning tree behind townhouse Tom
Can an outlet be added on each wall in unfinished bonus room? Kate - if possible, send cost to John Bowman and Scott
Can white plastic be added on top of insulation in bonus room? Kate - if possible, send cost to John Bowman and Scott
Exterior light fixture needs installed Electrician
Buyer coordinating directly with Benefield to add bonus room outlets
Davenport to cover insulation wiht threaded papaer after electric complete Davenport
Powder bath light fixture needed Electrician
Door lock to garage does not open Paul
Outlook cover needed in primary bathroom Electrician
Front door lock needed Paul
Does Munzur need to come back to install the dishwasher? by Monday, April 14th
Loose light in living room. Snap light. Electrician
Needs thermostat
Hall mirror needed Paul
Cover bonus room insulation with plastic Kate - we need to charge the buyer for this
Attic cover needed Drywallers
Few paint touchups needed in both of the ceilings of the smaller bedrooms Jesus
Remove gravel from backyard
Please make sure that painters are caulking, the whole side splash, not just the top Painter
HVAC system is making very loud rattling sound in upstairs vent Tom
Piece of trim needed on kitchen island Just needs installed
Final touchup in process 4/16 Painter
Adjust front gutters, and so splash blocks will fit Tom
Put the master bath towering back together
Master bath may need a new towel ring. The ring does not fit in the holder. Paul
Splash blocks Tom
Quite a bit of paint on the floor here? May need painters to come back for some large spots if Lynn is not able to remove them. Jesus
Smaller bedroom needs a little ceiling touchup paint Jesus
Damaged door threshold or transition strip
Remove paint off, trim and bathtub Jesus
Paint touch up Jesus
Damaged front door threshold Tom - we have one and will swap it out
John Bowman 540-271-2178
UPGRADES - COMPLETED
    Expanded driveway  
    White kitchen cabinets  
    Luxury vinyl plank upstairs  
    Oak stairs to bedroom level  
    Amendment to increase price by $7,000  
    Threaded paper wrap for insulation in Bonus Room  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.02.2024    
-- -- $2500 Deposit Received (0)  11.02.2024    
-- -- Association Packet Requested (0)  06.30.2025    
-- -- Association Packet Received (0)  11.08.2024    
-- -- Selections Meeting (0)  12.04.2024    
-- -- Selections Sheet Signed (0)  12.18.2024     12/3: sent to John for initials
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  12.21.2024     12/20: sent to Jerry
-- -- Deposit For Upgrades Received (0)  12.20.2024    
-- -- Building Permit (30) *   10.07.2024    
-- -- Order Roof & Floor Trusses (1)  10.17.2024    
-- -- Order Windows & Doors (0)  12.02.2024    
-- -- Stake Out Home (1)  10.14.2024    
-- -- Excavate (2)  10.21.2024    
-- -- Inspection (Footers) (1)  10.21.2024    
-- -- Inspection (Concrete Wall) (1)  10.21.2024    
-- -- Pour Footers (1) *   10.21.2024    
-- -- Set Forms (2)  11.13.2024    
-- -- Pour Foundation Walls (1)  11.13.2024    
-- -- Plumb Slab (2)  11.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  11.13.2024    
-- -- Inspection (Conduit Under Slab) (1)  11.13.2024    
-- -- Prepare Slab (1)  11.13.2024    
-- -- Inspection (Slab) (1)  11.13.2024    
-- -- Inspection (Drain Tile) (0)  11.13.2024    
-- -- Pour Slab (1) *   11.13.2024    
-- -- Settlement Agent Confirmed (0)  01.09.2025     12/20: sent to Brittany
-- -- Framing I (9)  11.24.2024    
-- -- Order Steps (0)  12.09.2024    
-- -- Order Tubs / Showers (0)  12.23.2024    
-- -- Framing II (8)  12.02.2024    
-- -- Framing III (8) *   12.19.2024    
-- -- Verify Window & Roof Structure (0)  12.19.2024    
-- -- Install Stairs (0) *   12.23.2024    
-- -- Windows & Doors (0) *   01.05.2025    
-- -- House Number and Status in Window (0)  01.16.2025    
-- -- Roofing (0) *   01.05.2025    
-- -- Order Cabinets (0)  12.31.2024    
-- -- Order Appliances (0)  02.20.2025     200509339240360366
-- -- Deck (0)  02.08.2025     In Process 1/5
-- -- Gutters (0)  02.16.2025    
-- -- Driveway (0) *   03.26.2025    
-- -- Patio (0)  03.15.2025     Framed 3/5
-- -- Privacy Divider / Fence (0) *   03.20.2025    
-- -- Sod / Seed / Landscaping (0)  04.23.2025     in process 4/19
-- -- HVAC Rough In (4)  01.18.2025     In Process 1/15
-- -- Rough In Microwave Vent (0)  01.05.2025    
-- -- Plumbing Rough In (4)  01.23.2025     in process 1/18. Almost done.
-- -- Electric Rough In (4)  01.25.2025     in process 1/22
-- -- Inspection (Rough In HVAC) (1)  01.27.2025    
-- -- Inspection (Rough In Plumbing) (1)  01.27.2025    
-- -- Inspection (Rough In Electric) (1)  01.30.2025    
-- -- Inspection (Framing) (1) *   01.30.2025    
-- -- Inspection (Deck Piers) (0)  01.27.2025    
-- -- Exterior Vinyl (0) *   02.16.2025    
-- -- Exterior Stone (0)  03.05.2025    
-- -- Insulation (2) *   01.29.2025    
-- -- Inspection (Insulation) (1)  01.30.2025    
-- -- Inspection (Electric Service) (0)  02.20.2025    
-- -- Set Electric Meter (0) *   04.09.2025    
-- -- Inspection (Main Sewer Line) (0)  02.20.2025    
-- -- Inspection (Main Water Line) (0)  02.20.2025    
-- -- Order Interior Doors & Trim (0)  01.27.2025    
-- -- Drywall (Hang) (4) *   02.05.2025    
-- -- Loan Approval (0)  03.06.2025     Cash, 1031 Exchange
-- -- Deed Preparation (0)  03.11.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   02.20.2025     In process 2/12
-- -- Paint 1 (1)  02.20.2025    
-- -- Garage Door (0)  03.12.2025    
-- -- House Numbers (0)  03.22.2025    
-- -- Mailbox (0)  04.16.2025    
-- -- Cabinet Installation (2) *   02.20.2025     Feb 19
-- -- Granite Installation (1) *   02.26.2025    
-- -- Interior Trim - Install (3) *   02.26.2025    
-- -- Order Plumbing / Lighting Fixtures (0)  02.17.2025    
-- -- Interior Trim - Paint (1)  02.26.2025    
-- -- Luxury Vinyl Plank (3) *   03.01.2025     In process 2/26
-- -- Luxury Vinyl Tile (0)  02.26.2025    
-- -- Paint 2 (3)  02.26.2025    
-- -- Cover Floors (0)  03.05.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  02.20.2025    
-- -- Shoe Moulding (0)  03.15.2025     In process 3/12
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   03.22.2025    
-- -- Install Coded Lockbox (add extra keys) (0)  03.28.2025    
-- -- Pay Water / Sewer Taps (0)  03.03.2025    
-- -- Set Water Meter (1) *   04.09.2025    
-- -- Electric Trim Out (3) *   03.12.2025     In process 3/8
-- -- Ceiling Fans (0)  03.08.2025    
-- -- HVAC Trim Out (1) *   03.26.2025    
-- -- Blower Door Test (1)  04.16.2025     Tuesday, April 15th
-- -- Plumbing Trim Out (2) *   03.12.2025     In process 3/8
-- -- Install Appliances (0) *   04.16.2025     Just dishwasher needs installed
-- -- Paint 3 (2) *   03.19.2025     In process 3/15
-- -- Carpet (2)  03.12.2025    
-- -- Appraiser Confirms Construction Completion (0)  04.28.2025    
-- -- Inspection (Final HVAC) (0)  04.16.2025    
-- -- Inspection (Final Plumbing) (0)  04.16.2025    
-- -- Inspection (Final Electric) (0)  04.16.2025    
-- -- Inspection (Final Building) (4) *   04.16.2025     Wed, Apr 16
-- -- Pre Walk Through (0)  04.21.2025    
-- -- Stain Hardwood Stairs (1) *   04.09.2025    
-- -- Cleaning (1)  05.01.2025     In process 4/30
-- -- Certificate of Occupancy (1) *   04.22.2025    
-- -- C.O. to Lender (0)  04.22.2025    
-- -- Schedule Closing (0)  05.01.2025    
-- -- Buyer Walk Through (1) *   05.01.2025    
-- -- Payment for Upgrades (0)  06.03.2025     $300 for insulation covering
-- -- Keys to Settlement Agent (0)  04.17.2025    
-- -- Review Settlement Statement (0)  05.01.2025    
-- -- Jerry Signs Closing Documents (0)  05.01.2025    
-- -- Request Trash Tote From POA Manager (0)  04.21.2025    
-- -- Closing (1)  05.01.2025     Flora Pettit, Tanya Dinges