Davenport |
|
-- |
-- |
All electrical plate covers needed after painter finishes |
Jesus. Still a few missing 3/19 |
|
-- |
-- |
Cut back or cut down leaning tree behind townhouse |
Tom |
|
-- |
-- |
Can an outlet be added on each wall in unfinished bonus room? |
Kate - if possible, send cost to John Bowman and Scott |
|
-- |
-- |
Can white plastic be added on top of insulation in bonus room? |
Kate - if possible, send cost to John Bowman and Scott |
|
-- |
-- |
Exterior light fixture needs installed |
Electrician |
|
-- |
-- |
Buyer coordinating directly with Benefield to add bonus room outlets |
|
|
-- |
-- |
Davenport to cover insulation wiht threaded papaer after electric complete |
Davenport |
|
-- |
-- |
Powder bath light fixture needed |
Electrician |
|
-- |
-- |
Door lock to garage does not open |
Paul |
|
-- |
-- |
Outlook cover needed in primary bathroom |
Electrician |
|
-- |
-- |
Front door lock needed |
Paul |
|
-- |
-- |
Does Munzur need to come back to install the dishwasher? |
by Monday, April 14th |
|
-- |
-- |
Loose light in living room. Snap light. |
Electrician |
|
-- |
-- |
Needs thermostat |
|
|
-- |
-- |
Hall mirror needed |
Paul |
|
-- |
-- |
Cover bonus room insulation with plastic |
Kate - we need to charge the buyer for this |
|
-- |
-- |
Attic cover needed |
Drywallers |
|
-- |
-- |
Few paint touchups needed in both of the ceilings of the smaller bedrooms |
Jesus |
|
-- |
-- |
Remove gravel from backyard |
|
|
-- |
-- |
Please make sure that painters are caulking, the whole side splash, not just the top |
Painter |
|
-- |
-- |
HVAC system is making very loud rattling sound in upstairs vent |
Tom |
|
-- |
-- |
Piece of trim needed on kitchen island |
Just needs installed |
|
-- |
-- |
Final touchup in process 4/16 |
Painter |
|
-- |
-- |
Adjust front gutters, and so splash blocks will fit |
Tom |
|
-- |
-- |
Put the master bath towering back together |
|
|
-- |
-- |
Master bath may need a new towel ring. The ring does not fit in the holder. |
Paul |
|
-- |
-- |
Splash blocks |
Tom |
|
-- |
-- |
Quite a bit of paint on the floor here? May need painters to come back for some large spots if Lynn is not able to remove them. |
Jesus |
|
-- |
-- |
Smaller bedroom needs a little ceiling touchup paint |
Jesus |
|
-- |
-- |
Damaged door threshold or transition strip |
|
|
-- |
-- |
Remove paint off, trim and bathtub |
Jesus |
|
-- |
-- |
Paint touch up |
Jesus |
|
-- |
-- |
Damaged front door threshold |
Tom - we have one and will swap it out |
|
-- |
-- |
John Bowman 540-271-2178 |
|
|
-- |
-- |
Ratified Contract? (0) 11.02.2024 |
|
|
|
|
Expanded driveway
|
|
|
|
White kitchen cabinets
|
|
|
|
Luxury vinyl plank upstairs
|
|
|
|
Oak stairs to bedroom level
|
|
|
|
Amendment to increase price by $7,000
|
|
|
|
Threaded paper wrap for insulation in Bonus Room
|
|
-- |
-- |
$2500 Deposit Received (0) 11.02.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 11.08.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.04.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.18.2024 |
12/3: sent to John for initials |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.21.2024 |
12/20: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.20.2024 |
|
|
-- |
-- |
Building Permit (30) 10.07.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.17.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.02.2024 |
|
|
-- |
-- |
Stake Out Home (1) 10.14.2024 |
|
|
-- |
-- |
Excavate (2) 10.21.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.21.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.21.2024 |
|
|
-- |
-- |
Pour Footers (1) * 10.21.2024 |
|
|
-- |
-- |
Set Forms (2) 11.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 11.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Prepare Slab (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 11.13.2024 |
|
|
-- |
-- |
Pour Slab (1) * 11.13.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.09.2025 |
12/20: sent to Brittany |
|
-- |
-- |
Framing I (9) 11.24.2024 |
|
|
-- |
-- |
Order Steps (0) 12.09.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 12.23.2024 |
|
|
-- |
-- |
Framing II (8) 12.02.2024 |
|
|
-- |
-- |
Framing III (8) * 12.19.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.19.2024 |
|
|
-- |
-- |
Install Stairs (0) 12.23.2024 |
|
|
-- |
-- |
Windows & Doors (0) * 01.05.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.16.2025 |
|
|
-- |
-- |
Roofing (0) * 01.05.2025 |
|
|
-- |
-- |
Order Cabinets (0) 12.31.2024 |
|
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
200509339240360366 |
|
-- |
-- |
Deck (0) 02.08.2025 |
In Process 1/5 |
|
-- |
-- |
Gutters (0) 02.16.2025 |
|
|
-- |
-- |
Driveway (0) * 03.26.2025 |
|
|
-- |
-- |
Patio (0) 03.15.2025 |
Framed 3/5 |
|
-- |
-- |
Privacy Divider / Fence (0) 03.20.2025 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 04.23.2025 |
in process 4/19 |
|
-- |
-- |
HVAC Rough In (4) 01.18.2025 |
In Process 1/15 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 01.27.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.05.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 01.23.2025 |
in process 1/18. Almost done. |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 01.27.2025 |
|
|
-- |
-- |
Electric Rough In (4) 01.25.2025 |
in process 1/22 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 01.30.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 01.27.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 01.30.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 02.16.2025 |
|
|
-- |
-- |
Exterior Stone (0) 03.05.2025 |
|
|
-- |
-- |
Insulation (2) * 01.29.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 01.30.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 02.20.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.20.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 01.27.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.05.2025 |
|
|
-- |
-- |
Loan Approval (0) 03.06.2025 |
Cash, 1031 Exchange |
|
-- |
-- |
Deed Preparation (0) 03.11.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 02.20.2025 |
In process 2/12 |
|
-- |
-- |
Paint 1 (1) 02.20.2025 |
|
|
-- |
-- |
Garage Door (0) * 03.12.2025 |
|
|
-- |
-- |
House Numbers (0) 03.22.2025 |
|
|
-- |
-- |
Mailbox (0) 04.16.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 02.20.2025 |
Feb 19 |
|
-- |
-- |
Granite Installation (1) * 02.26.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 02.26.2025 |
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 02.17.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 02.26.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 03.01.2025 |
In process 2/26 |
|
-- |
-- |
Luxury Vinyl Tile (0) 02.26.2025 |
|
|
-- |
-- |
Paint 2 (3) 02.26.2025 |
|
|
-- |
-- |
Cover Floors (1) 03.05.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 02.20.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 03.15.2025 |
In process 3/12 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 03.22.2025 |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 03.28.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.03.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 03.12.2025 |
In process 3/8 |
|
-- |
-- |
Ceiling Fans (0) 03.08.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 03.26.2025 |
|
|
-- |
-- |
Blower Door Test (1) 04.16.2025 |
Tuesday, April 15th |
|
-- |
-- |
Plumbing Trim Out (2) 03.12.2025 |
In process 3/8 |
|
-- |
-- |
Install Appliances (0) * 04.16.2025 |
Just dishwasher needs installed |
|
-- |
-- |
Paint 3 (2) * 03.19.2025 |
In process 3/15 |
|
-- |
-- |
Carpet (2) 03.12.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 04.28.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 04.16.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 04.16.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 04.16.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 04.16.2025 |
Wed, Apr 16 |
|
-- |
-- |
Pre Walk Through (0) 04.21.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 04.09.2025 |
|
|
-- |
-- |
Cleaning (1) 05.01.2025 |
In process 4/30 |
|
-- |
-- |
Certificate of Occupancy (1) * 04.22.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 04.22.2025 |
|
|
-- |
-- |
Schedule Closing (0) 05.01.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 05.01.2025 |
|
|
-- |
-- |
Payment for Upgrades (0) 06.03.2025 |
$300 for insulation covering |
|
-- |
-- |
Keys to Settlement Agent (0) 04.17.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.01.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.01.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 04.21.2025 |
|
|
-- |
-- |
Closing (1) 05.01.2025 |
Flora Pettit, Tanya Dinges |
|
-- |
-- |
Remove Coded Lockbox (0) 05.02.2025 |
|
|