CONGERS-3 - 40  ::  1619 Palomino Trail
[ BUILD: 20241829 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Quartz Level 0- Carraro Trigato  
    Stained Hardwood Treads to Bedroom Level  
    Faux Shower Walls (white)  
    Shower Door with black trim  
    2 added ceiling fans for 2nd and 3 rd bedroom  
    Amendment to increase price by $8,310  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  10.21.2024    
-- -- Inspection (Concrete Wall) (1)  10.21.2024    
-- -- Inspection (Plumbing Under Slab) (1)  11.13.2024    
-- -- Inspection (Conduit Under Slab) (1)  11.13.2024    
-- -- Inspection (Slab) (1)  11.13.2024    
-- -- Inspection (Drain Tile) (0)  11.13.2024    
-- -- Inspection (Rough In HVAC) (1)  02.01.2025    
-- -- Inspection (Rough In Plumbing) (1)  02.01.2025    
-- -- Inspection (Rough In Electric) (1)  02.01.2025    
-- -- Inspection (Framing) (1) *   02.01.2025    
-- -- Inspection (Deck Piers) (0)  02.20.2025    
-- -- Inspection (Insulation) (1)  02.05.2025    
-- -- Inspection (Electric Service) (0)  02.20.2025    
-- -- Inspection (Main Sewer Line) (0)  02.20.2025    
-- -- Inspection (Main Water Line) (0)  02.20.2025    
-- -- Inspection (Final HVAC) (0)  04.21.2025    
-- -- Inspection (Final Plumbing) (0)  04.21.2025    
-- -- Inspection (Final Electric) (0)  04.21.2025    
-- -- Inspection (Final Building) (4) *   04.21.2025     Fri, Apr 18