| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Quartz Level 0- Carraro Trigato | ||||
| Stained Hardwood Treads to Bedroom Level | ||||
| Faux Shower Walls (white) | ||||
| Shower Door with black trim | ||||
| 2 added ceiling fans for 2nd and 3 rd bedroom | ||||
| Amendment to increase price by $8,310 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 10.21.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.21.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 11.13.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 11.13.2024 | ||
| -- | -- | Inspection (Slab) (1) 11.13.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 11.13.2024 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 02.01.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 02.01.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 02.01.2025 | ||
| -- | -- | Inspection (Framing) (1) * 02.01.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 02.20.2025 | ||
| -- | -- | Inspection (Insulation) (1) 02.05.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 02.20.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 02.20.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 02.20.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 04.21.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 04.21.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 04.21.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 04.21.2025 | Fri, Apr 18 | |