Tire tracks in yard |
Tom |
|
|
-- |
-- |
Install tub in bonus bath |
|
|
-- |
-- |
PAUL- have you ordered shower door with black trim? |
|
|
-- |
-- |
Missing section of insulation outside of bonus bathtub |
|
|
-- |
-- |
Crown Molding Questions (pantry/closet) where does it end? |
|
|
-- |
-- |
Few pieces of trim missing in small bedroom |
|
|
-- |
-- |
Vinyl strip missing on front of house |
|
|
-- |
-- |
Piece of shoe molding missing in upper stairwell |
|
|
-- |
-- |
Remove tree behind townhoues |
|
|
-- |
-- |
Remove tree behind townhouse |
|
|
-- |
-- |
Powder bath light fixture needed |
Electrician. Bonus bath also. |
|
-- |
-- |
Needs thermostat |
|
|
-- |
-- |
Thermostat needed |
|
|
-- |
-- |
Install side splash on hall bathroom countertop. Side splash is sitting on the kitchen counter. |
Tom |
|
-- |
-- |
Home Inspection - April 22, 1pm |
Benjamin |
|
-- |
-- |
Drywall patching needed in living room |
Jesus. In process 4/16 |
|
-- |
-- |
All mirrors still needed |
Paul |
|
-- |
-- |
Install dishwasher |
|
|
-- |
-- |
Paint front door |
Jesus. Final coat will be completed before final walk-through. |
|
-- |
-- |
Remove gravel from rear of house |
|
|
-- |
-- |
CODED LOCKBOX 4141 |
|
|
-- |
-- |
Where is the back piece of the basement toilet |
Jill |
|
-- |
-- |
Is the mirror too low or the powder bath light fixture too high? |
|
|
-- |
-- |
Wrap up final paint touchup before cleaning |
|
|
-- |
-- |
Do we need brown electrical covers on the kitchen island? |
|
|
-- |
-- |
Hall vanity side splash has been installed so there is an extra one sitting in the kitchen |
Courtney |
|
-- |
-- |
Paint frame of exterior doors. Specifically off the patio. |
Jesus |
|
-- |
-- |
Pressure wash front and rear of home |
Buddy said he plans to do this tomorrow 4/29 |
|
-- |
-- |
Snap lights are not soft white but daylight bulbs |
Electrician |
|
-- |
-- |
Push refrigerator into place |
|
|
-- |
-- |
Few spots of glue in the master shower |
Lynn - maybe |
|
-- |
-- |
Push refrigerator into place and hook up water |
Mazur |
|
-- |
-- |
Remove large trash cans from in front of 38 to 41 units |
|
|
-- |
-- |
Gutter guards needed |
|
|
-- |
-- |
bonus bathroom door rubs at the frame |
Jorge |
|
-- |
-- |
make sure all interior door edges have been painted |
Courtney notifed painter |
|
-- |
-- |
Move dumpster |
Courtney will call Contain It |
|
-- |
-- |
Splash blocks needed |
Front one was in place. One in the back needs an extension, and the one on the side may need a piece of sod cut out? Or maybe an extension and not an actual/block. I will talk to Buddy. |
|
-- |
-- |
Chip in bathtub |
Courtney has requested the repair |
|
-- |
-- |
Transition strip needed from foyer to main level |
Thu, May 8 |
|
-- |
-- |
Sweep out garage |
|
|
-- |
-- |
Screens |
|
|
-- |
-- |
clean up debris in rear of the house from tree cutting |
Buddy knows- he/Jason are doing this week |
|
-- |
-- |
Replant sod near front of driveway |
Bob is adding soil in today, and Petit is bringing sod on Wednesday |
|
-- |
-- |
Fill holes in garage trim near house numbers |
Marked for Jesus who was coming this evening 4/28 |
|
-- |
-- |
Remove small concrete spots from flashing around garage door |
These will come off with a pressure washer. Buddy is aware and will do when he was pressuring washing the house. 4/9 |
|
-- |
-- |
Patch and paint blemishes in foyer |
Blue taped. Jesus completing 4/28 |
|
-- |
-- |
Remove small concrete spots from exterior of rear lower level door |
Buddy - pressure washer |
|
-- |
-- |
Adjust screen at basement right side window |
(or frame?) Courtney, Buddy |
|
-- |
-- |
Replace door sweep on bottom of door between garage and hallway |
Jorge completed 4/28 |
|
-- |
-- |
Paint touch up on ceiling when coming own stairs to front door |
Jesus completing 4/28. I marked with blue tape. |
|
-- |
-- |
Can the stain on the steps be evened out at all? |
Jesus says this will be fixed. I will go by in the morning 4/29 |
|
-- |
-- |
Touch up cabinet door to right of oven |
Courtney- I did this 4/28 |
|
-- |
-- |
Connect water to refrigerator |
Mazur connected 4/28 |
|
-- |
-- |
Adjust door from dining area to deck so that it is straight and deadbolt will lock |
Jorge fixed 4/28 |
|
-- |
-- |
Add a screw at the outlet cover that is not attached |
Courtney fixed it. 4/28 |
|
-- |
-- |
Paint touch up at ceiling over top stairs |
Jesus- marked with blue tape 4/28 |
|
-- |
-- |
Paint touch up at guest bedroom ceiling |
Jesus-marked with blue tape |
|
-- |
-- |
Adjust left master bedroom window so that it will lock |
Courtney-I need to look at this 4/29 |
|
-- |
-- |
Small drywall spot in smaller bedroom |
|
|
-- |
-- |
Small drywall spot in smaller bedroom |
|
|
-- |
-- |
Mop floors |
|
|
-- |
-- |
Does the HOA know to mow in 38 to 41? The grass is getting very long. |
|
|
-- |
-- |
Ratified Contract? (0) 10.07.2024 |
|
|
|
|
Finished Bonus Room
|
|
|
|
Finished Bonus Bathroom
|
|
|
|
Expanded Deck- 10 x 18
|
|
|
|
Expanded Patio
|
|
|
|
Expanded Driveway
|
|
|
|
White painted Kitchen Cabinets
|
|
|
|
Level 3 Quartz Kitchen Countertops
|
|
|
|
Microwave vented to exterior
|
|
|
|
Cabinet Crown Moulding
|
|
|
|
Three Drawer Stack in place of B 36"
|
|
|
|
Double Waste Basket in Island
|
|
|
|
White painted cabinets in Bathrooms (includes Bonus)
|
|
|
|
Gardenia LVT in all baths and laundry
|
|
|
|
Oak Treads to Bedroom Level
|
|
|
|
LVP in Bonus Room
|
|
|
|
LVP in Upstairs Hallway
|
|
|
|
Shower Door with black trim in master bath
|
|
|
|
4" Crown moulding on Main Level
|
|
|
|
Amendment to increase price by $35,310
|
|
-- |
-- |
$2500 Deposit Received (0) 10.10.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 10.11.2024 |
|
|
-- |
-- |
Selections Meeting (0) 10.14.2024 |
Requested for week of 10/14 |
|
-- |
-- |
Selections Sheet Signed (0) 11.05.2024 |
11/3: sent updated version to Matt |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.07.2024 |
11/5: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 11.06.2024 |
|
|
-- |
-- |
Building Permit (30) 10.07.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.17.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.02.2024 |
|
|
-- |
-- |
Stake Out Home (1) 10.14.2024 |
|
|
-- |
-- |
Excavate (2) 10.21.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.21.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.21.2024 |
|
|
-- |
-- |
Pour Footers (1) * 10.21.2024 |
|
|
-- |
-- |
Set Forms (2) 11.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 11.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Prepare Slab (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 11.13.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.02.2024 |
|
|
-- |
-- |
Pour Slab (1) * 11.13.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 11.09.2024 |
|
|
-- |
-- |
Framing I (9) 11.24.2024 |
|
|
-- |
-- |
Order Steps (0) 12.09.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0) 12.23.2024 |
|
|
-- |
-- |
Framing II (8) 12.02.2024 |
|
|
-- |
-- |
Framing III (8) * 12.19.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.19.2024 |
|
|
-- |
-- |
Install Stairs (0) 12.23.2024 |
|
|
-- |
-- |
Windows & Doors (0) * 01.05.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.16.2025 |
|
|
-- |
-- |
Roofing (0) * 01.05.2025 |
|
|
-- |
-- |
Order Cabinets (0) 12.31.2024 |
|
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
order # 200509352240380141 |
|
-- |
-- |
Deck (0) 03.01.2025 |
In process 2/26 |
|
-- |
-- |
Gutters (0) 02.16.2025 |
|
|
-- |
-- |
Driveway (0) * 03.26.2025 |
|
|
-- |
-- |
Patio (0) 03.15.2025 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 03.15.2025 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 04.23.2025 |
in process 4/19 |
|
-- |
-- |
HVAC Rough In (4) 01.23.2025 |
in process 1/15 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.05.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.08.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 01.30.2025 |
in process 1/22 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.05.2025 |
|
|
-- |
-- |
Electric Rough In (4) 02.01.2025 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.05.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 02.05.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 02.16.2025 |
|
|
-- |
-- |
Exterior Stone (0) 03.12.2025 |
|
|
-- |
-- |
Insulation (2) * 02.08.2025 |
In process 2/5 |
|
-- |
-- |
Inspection (Insulation) (1) 02.12.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 02.20.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.20.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 01.27.2025 |
TOM- NEED CROWN MOULDING MAIN FLOOR |
|
-- |
-- |
Drywall (Hang) (4) * 02.12.2025 |
|
|
-- |
-- |
Loan Approval (0) 11.20.2024 |
JoDee @ United Bank (75%) |
|
-- |
-- |
Deed Preparation (0) 03.24.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 02.20.2025 |
|
|
-- |
-- |
Paint 1 (1) 02.26.2025 |
|
|
-- |
-- |
Garage Door (0) * 03.12.2025 |
|
|
-- |
-- |
House Numbers (0) 03.22.2025 |
|
|
-- |
-- |
Mailbox (0) 04.16.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 03.05.2025 |
Install Tuesday, March 4 |
|
-- |
-- |
Granite Installation (1) * 03.08.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 03.08.2025 |
Crown Moulding. In process 3/5 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 02.17.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 03.08.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 03.19.2025 |
In process 3/15 |
|
-- |
-- |
Luxury Vinyl Tile (0) 03.19.2025 |
replacing color 3/17 |
|
-- |
-- |
Paint 2 (3) 03.12.2025 |
|
|
-- |
-- |
Cover Floors (1) 03.19.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 02.20.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 03.19.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 04.12.2025 |
In process 4/9 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.16.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.03.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 03.26.2025 |
In process 3/19 |
|
-- |
-- |
Ceiling Fans (0) 03.19.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 03.26.2025 |
|
|
-- |
-- |
Blower Door Test (1) 04.16.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 03.26.2025 |
In process 3/22 |
|
-- |
-- |
Install Appliances (0) * 04.12.2025 |
Standard Current Date: 3/27 |
|
-- |
-- |
Paint 3 (2) * 03.28.2025 |
In process 3/26 |
|
-- |
-- |
Carpet (2) 03.19.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 04.24.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 04.21.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 04.21.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 04.21.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 04.21.2025 |
Fri, Apr 18 |
|
-- |
-- |
Pre Walk Through (0) 04.24.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 04.09.2025 |
In process 4/6 |
|
-- |
-- |
Cleaning (1) 04.26.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 04.22.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 04.22.2025 |
|
|
-- |
-- |
Schedule Closing (0) 04.26.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 04.26.2025 |
Thu, Apr 24 at 5PM |
|
-- |
-- |
Payment for Upgrades (0) 04.21.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 04.21.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 04.22.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 04.22.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 04.21.2025 |
|
|
-- |
-- |
Closing (1) 04.30.2025 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 05.19.2025 |
|
|