41 42 43 44 45 27 26 25 24 23 22 34 35 36 37 16 17 18 19 20 21 28 29 30 31 32 33 13 14 15 9 10 11 12 5 6 7 8 1 2 3 4 ADDR
CONGERS-3 - 45  ::  1593 Palomino Trail
[ BUILD: 20241828 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Friday (Jun 27)    show all photos
-- -- Inspection (Footers) (1)  10.21.2024    
-- -- Inspection (Concrete Wall) (1)  10.21.2024    
-- -- Inspection (Plumbing Under Slab) (1)  11.24.2024    
-- -- Inspection (Conduit Under Slab) (1)  11.24.2024    
-- -- Inspection (Slab) (1)  12.02.2024    
-- -- Inspection (Drain Tile) (0)  12.02.2024    
-- -- Inspection (Rough In HVAC) (1)  02.20.2025    
-- -- Inspection (Rough In Plumbing) (1)  02.20.2025    
-- -- Inspection (Rough In Electric) (1)  02.20.2025    
-- -- Inspection (Deck Piers) (0)  02.20.2025    
-- -- Inspection (Framing) (1) *   02.20.2025    
-- -- Inspection (Insulation) (1)  02.26.2025    
-- -- Inspection (Electric Service) (0)  12.30.2024    
-- -- Inspection (Main Sewer Line) (0)  02.20.2025    
-- -- Inspection (Main Water Line) (0)  02.20.2025    
-- -- Inspection (Final HVAC) (1)  05.08.2025     Wednesday, May 7
-- -- Inspection (Final Plumbing) (1)  05.08.2025    
-- -- Inspection (Final Electric) (1)  05.08.2025    
-- -- Inspection (Final Building) (2) *   05.08.2025