Leave touchup paint |
Jesus |
|
-- |
-- |
Few cabinet touchups needed in kitchen |
Jill - waiting on pen |
|
Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
|
-- |
-- |
One of the cabinets has an issue with the front piece? Perhaps it was damaged and is on order? |
Fred |
|
-- |
-- |
Where is the sink? |
|
|
-- |
-- |
Kitchen cabinet has a large crack in it. I assume it will be hidden? |
|
|
-- |
-- |
Cover your carpets quickly. Someone already has walked over carpets in muddy shoes. |
|
|
-- |
-- |
June 7 - can washer and dryer be delivered? |
|
|
-- |
-- |
Side by side fridge is in this unit 5/21 |
|
|
-- |
-- |
A few refrigerators in this kitchen |
CJ |
|
-- |
-- |
This interior garage door does not close on its own either |
Self closing hinges |
|
-- |
-- |
Smoke detector needs installed in living room |
|
|
-- |
-- |
CODED LOCKBOX 2424 |
|
|
-- |
-- |
Adjust grade under deck to drain away from the house |
Tom |
|
-- |
-- |
Repair loose white trim at front porch |
Davenport |
|
-- |
-- |
Install PVC board under door to deck |
Tom |
|
-- |
-- |
Install door sweep at front exterior door |
Adjust threshold - Tom |
|
-- |
-- |
Adjust condensate drain line to direct it towards drain |
Tom |
|
-- |
-- |
Adjust kitchen pantry pocket door - rubs and scratch on door |
Jorge, Jesus |
|
-- |
-- |
Paint edges of interior doors |
Jesus |
|
-- |
-- |
Install missing hall bathroom fan cover |
Mast & Brunk |
|
-- |
-- |
Repair broken attic truss |
Tom |
|
-- |
-- |
Pretty obvious staying in garage, should this be removed? |
Staining - Tom, degreaser |
|
-- |
-- |
Remove extra refrigerator in kitchen |
CJ |
|
-- |
-- |
Remove glue from transition strip |
Denny |
|
-- |
-- |
install screens |
jill |
|
-- |
-- |
Replace front door |
|
|
-- |
-- |
Change condensate line |
|
|
-- |
-- |
Clean spot off LVP |
|
|
-- |
-- |
Clean sticky spot off LVP |
|
|
-- |
-- |
Cabinet touch up- pen needed |
Jill |
|
-- |
-- |
Bulbs needed for chandelier |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Re-clean floors and surfaces after punch out complete |
Lynn |
|
-- |
-- |
Sand, rough edges of windowsills |
|
|
-- |
-- |
Remove buckets of paint from garage |
|
|
-- |
-- |
Garage door trim needed, the white plastic piece |
weatherstripping |
|
-- |
-- |
Ratified Contract? (0) 12.02.2024 |
|
|
|
|
Three drawer stack 24” in island
|
|
|
|
Spice Rack
|
|
|
|
Ceiling Fan in Living Room
|
|
|
|
Amendment to increase price by $870
|
|
-- |
-- |
$2500 Deposit Received (0) 12.06.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 12.06.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.14.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.17.2024 |
12/13: sent to Maggie |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.19.2024 |
12/17: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.17.2024 |
|
|
-- |
-- |
Building Permit (30) 11.21.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 12.30.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.30.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.02.2024 |
|
|
-- |
-- |
Excavate (2) 12.02.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.02.2024 |
|
|
-- |
-- |
Pour Footers (1) * 12.02.2024 |
|
|
-- |
-- |
Set Forms (2) 12.19.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.19.2024 |
|
|
-- |
-- |
Plumb Slab (2) 12.19.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Prepare Slab (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.20.2025 |
|
|
-- |
-- |
Pour Slab (1) * 12.28.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.22.2025 |
12/18: sent to West View Title |
|
-- |
-- |
Framing I (9) 01.13.2025 |
|
|
-- |
-- |
Order Steps (0) 02.27.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.27.2025 |
|
|
-- |
-- |
Framing II (8) 02.02.2025 |
|
|
-- |
-- |
Framing III (8) * 02.27.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 03.03.2025 |
|
|
-- |
-- |
Install Stairs (0) 03.05.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 03.08.2025 |
In process 3/5 |
|
-- |
-- |
House Number and Status in Window (0) 03.09.2025 |
|
|
-- |
-- |
Roofing (0) * 03.13.2025 |
|
|
-- |
-- |
Order Cabinets (0) 02.26.2025 |
Ordered 2/25 |
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
200509005250390702 |
|
-- |
-- |
Deck (0) 04.06.2025 |
|
|
-- |
-- |
Gutters (0) 05.07.2025 |
|
|
-- |
-- |
Driveway (0) * 05.21.2025 |
Standard |
|
-- |
-- |
Patio (0) 04.16.2025 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 05.10.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 03.15.2025 |
In process 3/12 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 04.03.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 03.15.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.19.2025 |
In process 3/15 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 04.03.2025 |
|
|
-- |
-- |
Electric Rough In (4) 03.27.2025 |
In process 3/26 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 04.03.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 04.03.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 04.03.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 05.07.2025 |
in process 4/19 |
|
-- |
-- |
Exterior Stone (0) 05.05.2025 |
|
|
-- |
-- |
Insulation (2) * 04.03.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 04.03.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 04.14.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 05.10.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.14.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.09.2025 |
Stocked 4/6 |
|
-- |
-- |
Loan Approval (0) 06.23.2025 |
JoDee @ United Bank (80% LTV) |
|
-- |
-- |
Deed Preparation (0) 06.09.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.23.2025 |
In process 4/19 |
|
-- |
-- |
Paint 1 (1) 04.23.2025 |
|
|
-- |
-- |
Garage Door (0) * 05.07.2025 |
|
|
-- |
-- |
House Numbers (0) 06.11.2025 |
|
|
-- |
-- |
Mailbox (0) 06.12.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.23.2025 |
Wed, Apr 23 |
|
-- |
-- |
Granite Installation (1) * 05.02.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 04.30.2025 |
In process 4/230 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 04.14.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 05.07.2025 |
Prepping to paint 4/30 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.14.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 05.10.2025 |
|
|
-- |
-- |
Paint 2 (3) 05.17.2025 |
|
|
-- |
-- |
Cover Floors (1) 06.15.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.21.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 05.21.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 06.18.2025 |
In process 6/4 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.09.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.12.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 05.22.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 05.31.2025 |
In process 5/28 |
|
-- |
-- |
Ceiling Fans (0) 05.24.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 05.28.2025 |
|
|
-- |
-- |
Blower Door Test (1) 06.09.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 06.04.2025 |
In process 5/31 |
|
-- |
-- |
Install Appliances (0) * 06.09.2025 |
|
|
-- |
-- |
Paint 3 (2) * 05.28.2025 |
|
|
-- |
-- |
Carpet (2) 05.17.2025 |
In process 5/14 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.23.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 06.09.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 06.09.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 06.09.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.16.2025 |
Reinspect Mon Jun 9 |
|
-- |
-- |
Pre Walk Through (0) 06.12.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.15.2025 |
In process 6/11 |
|
-- |
-- |
Cleaning (1) 06.18.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 06.17.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 06.17.2025 |
|
|
-- |
-- |
Schedule Closing (0) 06.23.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.18.2025 |
Tuesday, June 17, 12 PM |
|
-- |
-- |
Payment for Upgrades (0) 06.09.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.09.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.17.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.17.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.04.2025 |
|
|
-- |
-- |
Closing (1) 06.23.2025 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 06.26.2025 |
|
|