| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Credit towards upgrades per Jerry | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bathroom | ||||
| Expanded Driveway | ||||
| White Upgraded Kitchen Cabinetry | ||||
| White Upgraded Bathroom Cabinetry | ||||
| Level 3 Quartz Kitchen Countertops | ||||
| White Farmhouse Sink | ||||
| French Model Refrigerator | ||||
| Cabinet Crown Moulding | ||||
| Double Pull Out Waste Basket in Island | ||||
| 2 Roll Out Trays in Lower 36" | ||||
| Spice Rack in B9" cabinet | ||||
| Microwave vented to exterior | ||||
| White Subway Tile Shower Walls | ||||
| Heavy Bi-Pass Shower Door with Black Trim | ||||
| Stained Hardwood Treads to bedroom level | ||||
| Additional Ceiling Fan in Living Room | ||||
| Digital Deadbolt | ||||
| EcoBee 3 Lite Smart WiFi enabled Thermostat | ||||
| Garage Door Opener Keypad (no charge) | ||||
| Amendment to increase price by $23,475 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.02.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.02.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.30.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.30.2024 | ||
| -- | -- | Inspection (Slab) (1) 02.20.2025 | ||
| -- | -- | Inspection (Drain Tile) (0) 06.09.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 05.21.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 05.21.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 05.21.2025 | ||
| -- | -- | Inspection (Framing) (1) * 08.24.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 06.24.2025 | ||
| -- | -- | Inspection (Insulation) (1) 05.22.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 06.12.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 06.09.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 06.09.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 08.15.2025 | Scheduled for Friday 8/15 | |
| -- | -- | Inspection (Final Plumbing) (0) 08.15.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 08.15.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 08.24.2025 | ||