Dent in master shower. I think we’ll be covered up by flooring and trim. |
|
|
-- |
-- |
CEILING FAN INSTALLED IN LIVING ROOM not MASTER |
Do install it in the living room |
|
|
|
Microwave vented to exterior
|
|
Tue |
Jul 1 |
Gutters (0) |
|
|
Tue |
Jul 1 |
Driveway (0) * |
|
|
Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
Tue |
Jul 1 |
Exterior Vinyl (0) * |
|
|
Tue |
Jul 1 |
Exterior Stone (0) |
|
|
Tue |
Jul 1 |
Set Electric Meter (0) * |
|
|
Tue |
Jul 1 |
Loan Approval (0) |
Kozhin @ Nexa (97% FHA) |
|
Tue |
Jul 1 |
Deed Preparation (0) |
|
|
Tue |
Jul 1 |
Garage Door (0) * |
|
|
Tue |
Jul 1 |
House Numbers (0) |
|
|
Tue |
Jul 1 |
Mailbox (0) |
|
|
Tue |
Jul 1 |
Paint 2 (3) |
|
|
Fri |
Jul 4 |
Cover Floors (1) |
|
|
Mon |
Jul 7 |
Shoe Moulding (0) |
|
|
Mon |
Jul 7 |
Shelving, Door Knobs, Fire Extinguisher (0) * |
|
|
Mon |
Jul 7 |
Install Coded Lockbox (add extra keys) (0) |
|
|
Mon |
Jul 7 |
Set Water Meter (0) * |
|
|
Mon |
Jul 7 |
Electric Trim Out (3) |
|
|
Thu |
Jul 10 |
Ceiling Fans (0) |
|
|
Thu |
Jul 10 |
HVAC Trim Out (1) |
|
|
Fri |
Jul 11 |
Blower Door Test (1) |
|
|
Mon |
Jul 14 |
Plumbing Trim Out (2) |
|
|
Wed |
Jul 16 |
Install Appliances (0) * |
Standard/ 7/7 |
|
Wed |
Jul 16 |
Paint 3 (2) * |
|
|
Fri |
Jul 18 |
Carpet (2) |
|
|
Tue |
Jul 22 |
Appraiser Confirms Construction Completion (0) |
|
|
Tue |
Jul 22 |
Inspection (Final HVAC) (1) |
|
|
Wed |
Jul 23 |
Inspection (Final Plumbing) (1) |
|
|
Thu |
Jul 24 |
Inspection (Final Electric) (1) |
|
|
Fri |
Jul 25 |
Inspection (Final Building) (2) * |
|
|
Tue |
Jul 29 |
Pre Walk Through (0) |
|
|
Tue |
Jul 29 |
Stain Hardwood Stairs (1) |
|
|
Wed |
Jul 30 |
Cleaning (1) |
|
|
Thu |
Jul 31 |
Certificate of Occupancy (1) * |
|
|
Fri |
Aug 1 |
C.O. to Lender (0) |
|
|
Fri |
Aug 1 |
Schedule Closing (0) |
|
|
Fri |
Aug 1 |
Buyer Walk Through (1) |
|
|
Mon |
Aug 4 |
Payment for Upgrades (0) |
|
|
Mon |
Aug 4 |
Keys to Settlement Agent (0) |
|
|
Mon |
Aug 4 |
Review Settlement Statement (0) |
|
|
Mon |
Aug 4 |
Jerry Signs Closing Documents (0) |
|
|
Mon |
Aug 4 |
Request Trash Tote From POA Manager (0) |
|
|
Mon |
Aug 4 |
Closing (1) |
|
|
Tue |
Aug 5 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Deck doors need installed |
|
|
-- |
-- |
Ratified Contract? (0) 12.21.2024 |
|
|
|
|
Expanded Driveway
|
|
|
|
Granite Level 2 in kitchen
|
|
|
|
Upgraded LVT in Up Baths and Laundry
|
|
|
|
Expanded 12 x 18 Deck
|
|
|
|
Amendment to increase price by $5,565
|
|
-- |
-- |
$2500 Deposit Received (0) 12.24.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 12.27.2024 |
|
|
-- |
-- |
Selections Meeting (0) 02.10.2025 |
|
|
-- |
-- |
Selections Sheet Signed (0) 02.18.2025 |
2/10: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 03.05.2025 |
3/4: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 03.04.2025 |
|
|
-- |
-- |
Building Permit (30) 11.22.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 02.20.2025 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.30.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.02.2024 |
|
|
-- |
-- |
Excavate (2) 12.02.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.02.2024 |
|
|
-- |
-- |
Pour Footers (1) * 12.02.2024 |
|
|
-- |
-- |
Set Forms (2) 12.19.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.19.2024 |
|
|
-- |
-- |
Plumb Slab (2) 12.30.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.30.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.30.2024 |
|
|
-- |
-- |
Prepare Slab (1) 02.02.2025 |
|
|
-- |
-- |
Inspection (Slab) (1) 02.20.2025 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 06.09.2025 |
|
|
-- |
-- |
Pour Slab (1) * 02.27.2025 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 03.12.2025 |
3/5: sent to Brittany |
|
-- |
-- |
Framing I (9) 03.29.2025 |
|
|
-- |
-- |
Order Steps (0) 04.03.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 04.07.2025 |
|
|
-- |
-- |
Framing II (8) 03.29.2025 |
|
|
-- |
-- |
Framing III (8) * 04.07.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 05.07.2025 |
|
|
-- |
-- |
Install Stairs (0) 04.19.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 05.10.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.19.2025 |
|
|
-- |
-- |
Roofing (0) * 05.07.2025 |
|
|
-- |
-- |
Order Cabinets (0) 05.03.2025 |
Ordered 5/2 |
|
-- |
-- |
Order Appliances (0) 06.09.2025 |
|
|
-- |
-- |
Deck (0) 05.07.2025 |
Expanded 12 x 18 |
|
-- |
-- |
Patio (0) 06.18.2025 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 05.19.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 04.26.2025 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.17.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 04.30.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 05.10.2025 |
In process 5/7 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 05.17.2025 |
|
|
-- |
-- |
Electric Rough In (4) 05.17.2025 |
In process 5/14 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 05.17.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 06.24.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 05.17.2025 |
|
|
-- |
-- |
Insulation (2) * 05.17.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.22.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.12.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 06.09.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 06.09.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 06.24.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.28.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 06.11.2025 |
In process 6/7. Needs final sanding. |
|
-- |
-- |
Paint 1 (1) 06.11.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.21.2025 |
In process 6/18 |
|
-- |
-- |
Granite Installation (1) * 06.21.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 06.21.2025 |
In process 6/18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 06.12.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 06.25.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.27.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 06.27.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.19.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.30.2025 |
|
|