CONGERS-3 - 36  ::  1446 Derby Drive
[ BUILD: 20242191 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Deck doors need installed
--   --   Dent in master shower. I think we’ll be covered up by flooring and trim.
--   --   CEILING FAN INSTALLED IN LIVING ROOM not MASTER Do install it in the living room. This did not happen. 7/18
--   --   Trim needed in garage
--   --   Paint touchup is going to be needed on the side of the kitchen island Jesus
--   --   Pretty large white scratch on the front of the kitchen cabinet near the stove Jill
--   --   Replace white receptacles on kitchen island with brown Electrician
--   --   Cover carpet Jill
--   --   Side trim missing on kitchen island George
--   --   Back door lock needs installed
--   --   I do not see a microwave in this townhouse to be installed
--   --   Lots of lightbulbs and ceiling fans need to be installed incorrect places. Lots of electrical covers needed.
--   --   There does not seem to be a place for a bathroom fan in this bathroom master Drywaller
--   --   Patch hole and powder bath near light fixture Drywaller
--   --   Install correct handle on basement closet under stair staircase once George removes all tools Jorge
--   --   Does this patio get railings on one side? Tom
--   --   Big dent in refrigerator HANDLED
--   --   Large dent in refrigerator
--   --   Drywall patch needed, and small bedroom in a few places Drywaller
--   --   Install ceiling fans, incorrect places. Few electrical covers needed. Electrician
--   --   Install lightbulb in hallway light fixture. Current bulb is broken. Electrician
--   --   Install exterior outlet by rear patio Electrician
--   --   I do not think an electrical switch plate is going to fit on the side of the primary bathroom mirror Paul
--   --   Final pain is going to be needed in this house. Few large areas that need to be sanded and painted. Jesus
--   --   Bathroom fan needs installed now that hole is cut Mast & Brunk
--   --   Few covers needed on electrical outlets. Specifically in master bedroom and garage. Electrician
--   --   Weatherstripping needed on doors here Jesus
--   --   Remove white piece of fabric from front door awning Buddy
--   --   Clean out bonus room Lynn
--   --   Clean out garage Lynn
--   --   Install screens Jill
--   --   Pantry pocket door needs to be adjusted Jorge
--   --   Remove ladder from master closet Jill
--   --   Install cable cover in closet on main level Jill
--   --   Install cover media box
--   --   Adjust upstairs bedroom closet doors Jill
--   --   Remove ladder from primary closet
--   --   Sweep off deck Jill
--   --   Clean off lower deck and yard Jill
--   --   Remove 1 bar from chandelier Electrician
--   --   Scrape the garage floor Jill
--   --   Paint touchup Jesus
--   --   Remove extra refrigerator from kitchen CJ - move to model home
--   --   Scrape garage floor
--   --   Remove paint from LVP Jesus
--   --   Clean off deck Jill
--   --   Clean screen door track on middle level Jill
--   --   Pressure wash Jill
--   --   Remove underside of granite countertop that’s falling off Jill
--   --   CODED LOCKBOX 3636
--   --   Pressure wash driveway Buddy
--   --   The steps received a few blemishes when removing the refrigerator from the kitchen, can the painters come back in for a quick touchup? Jesus
-- -- Ratified Contract? (0)  12.21.2024    
    Expanded Driveway  
    Granite Level 2 in kitchen  
    Upgraded LVT in Up Baths and Laundry  
    Microwave vented to exterior  
    Expanded 12 x 18 Deck  
    Amendment to increase price by $5,565  
-- -- $2500 Deposit Received (0)  12.24.2024    
-- -- Association Packet Requested (0)  06.30.2025    
-- -- Association Packet Received (0)  12.27.2024    
-- -- Selections Meeting (0)  02.10.2025    
-- -- Selections Sheet Signed (0)  02.18.2025     2/10: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  03.05.2025     3/4: sent to Jerry
-- -- Deposit For Upgrades Received (0)  03.04.2025    
-- -- Building Permit (30) *   11.22.2024    
-- -- Order Roof & Floor Trusses (1)  02.20.2025    
-- -- Order Windows & Doors (0)  12.30.2024    
-- -- Stake Out Home (1)  12.02.2024    
-- -- Excavate (2)  12.02.2024    
-- -- Inspection (Footers) (1)  12.02.2024    
-- -- Inspection (Concrete Wall) (1)  12.02.2024    
-- -- Pour Footers (1) *   12.02.2024    
-- -- Set Forms (2)  12.19.2024    
-- -- Pour Foundation Walls (1)  12.19.2024    
-- -- Plumb Slab (2)  12.30.2024    
-- -- Inspection (Plumbing Under Slab) (1)  12.30.2024    
-- -- Inspection (Conduit Under Slab) (1)  12.30.2024    
-- -- Prepare Slab (1)  02.02.2025    
-- -- Inspection (Slab) (1)  02.20.2025    
-- -- Inspection (Drain Tile) (0)  06.09.2025    
-- -- Pour Slab (1) *   02.27.2025    
-- -- Settlement Agent Confirmed (0)  03.12.2025     3/5: sent to Brittany
-- -- Framing I (9)  03.29.2025    
-- -- Order Steps (0)  04.03.2025    
-- -- Order Tubs / Showers (0)  04.07.2025    
-- -- Framing II (8)  03.29.2025    
-- -- Framing III (8) *   04.07.2025    
-- -- Verify Window & Roof Structure (0)  05.07.2025    
-- -- Install Stairs (0) *   04.19.2025    
-- -- Windows & Doors (0) *   05.10.2025    
-- -- House Number and Status in Window (0)  05.19.2025    
-- -- Roofing (0) *   05.07.2025    
-- -- Order Cabinets (0)  05.03.2025     Ordered 5/2
-- -- Order Appliances (0)  06.09.2025    
-- -- Deck (0)  05.07.2025     Expanded 12 x 18
-- -- Gutters (0)  07.02.2025    
-- -- Driveway (0) *   07.04.2025    
-- -- Patio (0)  06.18.2025     Standard
-- -- Privacy Divider / Fence (0) *   05.19.2025    
-- -- Sod / Seed / Landscaping (0)  08.16.2025    
-- -- HVAC Rough In (4)  04.26.2025    
-- -- Rough In Microwave Vent (0)  04.30.2025    
-- -- Plumbing Rough In (4)  05.10.2025     In process 5/7
-- -- Electric Rough In (4)  05.17.2025     In process 5/14
-- -- Inspection (Rough In HVAC) (1)  05.17.2025    
-- -- Inspection (Rough In Plumbing) (1)  05.17.2025    
-- -- Inspection (Rough In Electric) (1)  05.17.2025    
-- -- Inspection (Framing) (1) *   05.17.2025    
-- -- Inspection (Deck Piers) (0)  06.24.2025    
-- -- Exterior Vinyl (0) *   07.02.2025    
-- -- Exterior Stone (0)  07.02.2025    
-- -- Insulation (2) *   05.17.2025    
-- -- Inspection (Insulation) (1)  05.22.2025    
-- -- Inspection (Electric Service) (0)  06.12.2025    
-- -- Set Electric Meter (0) *   08.12.2025    
-- -- Inspection (Main Sewer Line) (0)  06.09.2025    
-- -- Inspection (Main Water Line) (0)  06.09.2025    
-- -- Order Interior Doors & Trim (0)  06.24.2025    
-- -- Drywall (Hang) (4) *   05.28.2025    
-- -- Loan Approval (0)  09.08.2025     Kozhin @ Nexa (97% FHA)
-- -- Deed Preparation (0)  07.08.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   06.11.2025     In process 6/7. Needs final sanding.
-- -- Paint 1 (1)  06.11.2025    
-- -- Garage Door (0)  08.03.2025    
-- -- House Numbers (0)  07.12.2025    
-- -- Mailbox (0)  07.03.2025    
-- -- Cabinet Installation (2) *   06.21.2025     In process 6/18
-- -- Granite Installation (1) *   06.21.2025    
-- -- Interior Trim - Install (3) *   06.21.2025     In process 6/18
-- -- Order Plumbing / Lighting Fixtures (0)  06.12.2025    
-- -- Interior Trim - Paint (1)  06.25.2025    
-- -- Luxury Vinyl Plank (3) *   06.27.2025    
-- -- Luxury Vinyl Tile (0)  06.27.2025    
-- -- Paint 2 (3)  07.12.2025    
-- -- Cover Floors (1)  08.06.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  06.19.2025    
-- -- Shoe Moulding (0)  07.02.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   07.18.2025     In process 7/16
-- -- Install Coded Lockbox (add extra keys) (0)  07.18.2025    
-- -- Pay Water / Sewer Taps (0)  06.30.2025    
-- -- Set Water Meter (0) *   07.03.2025    
-- -- Electric Trim Out (3) *   08.03.2025     In process 7/18.
-- -- Ceiling Fans (0)  08.12.2025    
-- -- HVAC Trim Out (1) *   08.16.2025     HVAC trimout is completed except thermostat
-- -- Blower Door Test (1)  08.18.2025    
-- -- Plumbing Trim Out (2) *   07.18.2025     In process 7/9
-- -- Install Appliances (0) *   07.30.2025     Standard/ 7/7. Dishwasher is in 7/4
-- -- Paint 3 (2) *   07.30.2025    
-- -- Carpet (2)  07.12.2025    
-- -- Appraiser Confirms Construction Completion (0)  09.08.2025    
-- -- Inspection (Final HVAC) (1)  08.19.2025    
-- -- Inspection (Final Plumbing) (1)  08.19.2025    
-- -- Inspection (Final Electric) (1)  08.19.2025    
-- -- Inspection (Final Building) (2) *   08.19.2025     Mon, Aug 18
-- -- Pre Walk Through (0)  08.18.2025    
-- -- Stain Hardwood Stairs (1) *   07.30.2025    
-- -- Cleaning (1)  08.23.2025    
-- -- Certificate of Occupancy (1) *   08.29.2025    
-- -- C.O. to Lender (0)  08.29.2025    
-- -- Schedule Closing (0)  09.08.2025    
-- -- Buyer Walk Through (1) *   08.25.2025    
-- -- Payment for Upgrades (0)  08.21.2025    
-- -- Keys to Settlement Agent (0)  08.15.2025    
-- -- Review Settlement Statement (0)  09.08.2025    
-- -- Jerry Signs Closing Documents (0)  09.09.2025    
-- -- Request Trash Tote From POA Manager (0)  08.15.2025    
-- -- Closing (1)  09.15.2025     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  09.22.2025