| TO DO |
| KK |
Jan 7 (227) |
Buyer Contact- Ali- 540-705-4068 |
|
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
| --- |
|
| TO DO - COMPLETED OR DELETED |
|
|
Bonus bathtub needs to be put into place |
|
|
|
|
Both sets of patio doors need to be set |
|
|
|
|
Plan for revised deck shape |
|
|
|
|
Both sets of patio doors need to be installed |
|
|
|
|
PAUSE CONSTRUCTION |
Buyer unhappy about the deck |
|
|
|
loose rock on front near garage (bottom) |
|
|
|
|
loose rock on front near garage (bottom) |
|
|
|
|
I do not think that the drywaller cleaned up after finishing the drywall. It is exceptionally dirty. Even the cabinets are coated in dust. |
|
|
|
|
Patching is going to be needed on the garage door frame |
In process 11/22 |
|
|
|