| TO DO |
|
|
Install patio screen doors |
Tom - on order |
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
| --- |
|
| TO DO - COMPLETED OR DELETED |
|
|
the dormer window needs to be moved to unit 31 |
|
|
|
|
Move tub in bonus bath |
|
|
|
|
Expanded Driveway! |
Can it be added? |
|
|
|
Amendment for upgraded driveway |
|
|
|
|
Upper dormer windows need installed |
|
|
|
|
Front dormer windows that need to be installed are in this bonus room |
|
|
|
|
All bathtubs need to have plumbing rough in completed |
|
|
|
|
Buyer will be doing a home inspection |
|
|
|
|
Install side splash in the primary bathroom |
|
|
|
|
Drywall needed on primary bedroom door |
|
|
|
|
Primary door framing issue bedroom |
Jesus |
|
|
|
Cover carpet |
|
|
|
|
Cover carpet upstairs |
|
|
|
|
Shoe molding Is needed in the bonus bathroom |
Jorge |
|
|
|
Quite a bit of paint needs to be cleaned off the basement bonus bathroom vanity |
Jesus |
|
|
|
Full set of appliances in this kitchen |
|
|
|
|
Paint 2 does still need to be completed in the hallway |
|
|
|
|
Home Inspection - Tuesday, Dec 16 at 1PM |
|
|
|
|
Bonus room light fixture is broken |
Electrician. New one on floor. 12/13 |
|
|
|
Brown receptacles needed in kitchen island |
Jill |
|
|
|
Granite soda stain |
Jill. I think gone? Jill’s magic. |
|
|
|
Light bulbs needed in a few places, cable covers need to be installed? |
|
|
|
|
Lots of white scuffing around the corner of the kitchen island. Perhaps it will come off with cleaning? |
Jill |
|
|
|
Light fixtures in hallway are upside down |
Electrician |
|
|
|
Significant coffee staining on the upstairs banister. Hoping painters can repair? |
|
|
|
|
Trying to close on Dec 19 at 9AM |
|
|
|
|
Repair rear exterior vent outlet (protruding) |
Greg, Jill |
|
|
|
Install missing interior door knobs |
|
|
|
|
Add PVC board under rear deck exterior door |
|
|
|
|
Install door stop on front exterior door |
|
|
|
|
Repair drywall behind door |
|
|
|
|
Replace damaged wood on rear deck |
Tom |
|
|
|
Install handle and latch at kitchen pantry pocket door |
|
|
|
|
Turn on and test refrigerator ice maker |
|
|
|
|
Secure loose toilet in bonus room bathroom |
|
|
|
|
Repair hole in primary bathroom shower |
Jill coordinating, Wed, Dec 24 |
|
|
|
Repair broken roof trusses |
|
|
|
|
Add more insulation in attic |
|
|
|
|
Paint touch ups throughout |
A lot of blue tape still remains 12/24 |
|
|
|
Install cabinet shelf that sitting on the top of the cabinets |
Jill |
|
|
|
Few bath accessories are missing. Lynn said, shoving folks said they would be going in tomorrow. |
|
|
|
|
CODED LOCKBOX 3030 |
|
|
|
|
Straighten chandelier |
Electrician |
|
|
|
Clean out garage |
Just needs to have a small dust pile cleaned up, Jill |
|
|
|
Secure tub faucet to wall in bonus bathroom |
Munzure |
|
|
|
Clean paint off of LVP at landing |
Jesus |
|
|
|
Caulk at pedestal sink in half bathroom |
|
|
|
|
Paint touch up throughout |
|
|
|
|
Clean off scuffs on kitchen cabinets |
Jill |
|
|
|
Remove gum (?) from upstairs hallway carpet |
Jill, Eric, Denny |
|
|
|
Whiteboard needed off of patio door |
Tom |
|
|
|
All these driveways really need to be pressure washed or at least swept |
Tom |
|
|
|
Please turn off lights when leaving property as utilities are now in buyer’s name |
|
|
|
|
Repairs needed to hallway, bathroom light fixture? |
|
|
|
|
Second coat of paint needed on this front door |
|
|
|
|
Adjust front door to close more easily |
Tom |
|
| SR |
Jan 15 (19) |
Can we swap out the bathroom fans for flush mount fans? |
Jill will ask Mast & Brunk |
|
| SR |
Jan 13 (21) |
Patch, sand and paint at hall bathroom light fixture |
Jesus |
|
|
| UPGRADES - COMPLETED |
| |
|
Finished Bonus Room
|
|
| |
|
Finished Bonus Bathroom
|
|
| |
|
Microwave vented to Exterior
|
|
| |
|
Expanded Driveway
|
|
| |
|
Amendment to increase price by $18,170
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 02.12.2025 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 02.15.2025 |
|
|
| -- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
| -- |
-- |
Association Packet Received (0) 02.15.2025 |
|
|
| -- |
-- |
Selections Meeting (0) 03.28.2025 |
10:30 AM 11/27 |
|
| -- |
-- |
Selections Sheet Signed (0) 04.04.2025 |
3/27: sent to Luke |
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 09.18.2025 |
9/15: sent updated version to Luke |
|
| -- |
-- |
Deposit For Upgrades Received (0) 04.08.2025 |
|
|
| -- |
-- |
Building Permit (30) * 01.31.2025 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 08.04.2025 |
|
|
| -- |
-- |
Order Windows & Doors (0) 08.04.2025 |
|
|
| -- |
-- |
Stake Out Home (1) 03.29.2025 |
|
|
| -- |
-- |
Excavate (2) 03.29.2025 |
|
|
| -- |
-- |
Inspection (Footers) (1) 04.07.2025 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 05.15.2025 |
|
|
| -- |
-- |
Pour Footers (1) * 04.07.2025 |
|
|
| -- |
-- |
Set Forms (2) 05.15.2025 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 05.15.2025 |
|
|
| -- |
-- |
Plumb Slab (2) 05.15.2025 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 06.05.2025 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 06.05.2025 |
|
|
| -- |
-- |
Prepare Slab (1) 06.05.2025 |
|
|
| -- |
-- |
Inspection (Slab) (1) 07.31.2025 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 07.22.2025 |
|
|
| -- |
-- |
Pour Slab (1) * 06.08.2025 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 04.16.2025 |
4/9: sent to Brittany |
|
| -- |
-- |
Framing I (9) 07.31.2025 |
|
|
| -- |
-- |
Order Steps (0) 08.04.2025 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 08.14.2025 |
|
|
| -- |
-- |
Framing II (8) 08.07.2025 |
|
|
| -- |
-- |
Framing III (8) * 08.11.2025 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 08.14.2025 |
|
|
| -- |
-- |
Install Stairs (0) * 08.18.2025 |
|
|
| -- |
-- |
Windows & Doors (0) * 08.25.2025 |
|
|
| -- |
-- |
House Number and Status in Window (0) 09.04.2025 |
|
|
| -- |
-- |
Roofing (0) * 08.25.2025 |
|
|
| -- |
-- |
Order Cabinets (0) 08.19.2025 |
|
|
| -- |
-- |
Order Appliances (0) 10.27.2025 |
|
|
| -- |
-- |
Deck (0) 10.04.2025 |
Standard |
|
| -- |
-- |
Gutters (0) 10.20.2025 |
|
|
| -- |
-- |
Driveway (0) * 09.03.2025 |
|
|
| -- |
-- |
Patio (0) 11.15.2025 |
Standard |
|
| -- |
-- |
Privacy Divider / Fence (0) * 12.10.2025 |
|
|
| -- |
-- |
Sod / Seed / Landscaping (0) 12.24.2025 |
|
|
| -- |
-- |
HVAC Rough In (4) 08.23.2025 |
|
|
| -- |
-- |
Rough In Microwave Vent (0) 09.01.2025 |
|
|
| -- |
-- |
Plumbing Rough In (4) 09.17.2025 |
In process 9/3 |
|
| -- |
-- |
Electric Rough In (4) 09.13.2025 |
In process 9/10 |
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 09.18.2025 |
|
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 09.18.2025 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 09.18.2025 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 09.18.2025 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 11.10.2025 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 10.19.2025 |
|
|
| -- |
-- |
Exterior Stone (0) 09.08.2025 |
|
|
| -- |
-- |
Insulation (2) * 09.20.2025 |
|
|
| -- |
-- |
Inspection (Insulation) (1) 09.25.2025 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 10.06.2025 |
|
|
| -- |
-- |
Set Electric Meter (0) * 10.27.2025 |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) 08.14.2025 |
|
|
| -- |
-- |
Inspection (Main Water Line) (0) 08.14.2025 |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) 10.23.2025 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 10.04.2025 |
In process 9/26 |
|
| -- |
-- |
Loan Approval (0) 12.15.2025 |
JoDee @ United (80% Conventional) |
|
| -- |
-- |
Deed Preparation (0) 11.18.2025 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 10.11.2025 |
In process 10/8. Final sanding. |
|
| -- |
-- |
Paint 1 (1) 10.15.2025 |
In process 10/11 |
|
| -- |
-- |
Garage Door (0) 10.15.2025 |
|
|
| -- |
-- |
House Numbers (0) 11.15.2025 |
|
|
| -- |
-- |
Mailbox (0) 11.24.2025 |
|
|
| -- |
-- |
Cabinet Installation (2) * 10.15.2025 |
Oct 15 |
|
| -- |
-- |
Granite Installation (1) * 10.25.2025 |
Fri, Oct 24 |
|
| -- |
-- |
Interior Trim - Install (3) * 11.05.2025 |
In process 10/31 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) 10.16.2025 |
|
|
| -- |
-- |
Interior Trim - Paint (1) 11.08.2025 |
Painting 11/5 |
|
| -- |
-- |
Luxury Vinyl Plank (3) * 11.12.2025 |
|
|
| -- |
-- |
Luxury Vinyl Tile (0) 11.12.2025 |
|
|
| -- |
-- |
Paint 2 (3) 11.22.2025 |
|
|
| -- |
-- |
Cover Floors (0) 11.22.2025 |
|
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 10.27.2025 |
|
|
| -- |
-- |
Shoe Moulding (0) 11.22.2025 |
In process 11/19 |
|
| -- |
-- |
Shelving, Door Knobs, Fire Extinguisher (1) * 12.20.2025 |
|
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) 12.17.2025 |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) 11.10.2025 |
|
|
| -- |
-- |
Set Water Meter (1) * 12.01.2025 |
|
|
| -- |
-- |
Electric Trim Out (3) * 12.13.2025 |
In process 12/10 |
|
| -- |
-- |
Ceiling Fans (0) 12.13.2025 |
|
|
| -- |
-- |
HVAC Trim Out (1) * 11.22.2025 |
|
|
| -- |
-- |
Blower Door Test (1) 12.16.2025 |
|
|
| -- |
-- |
Plumbing Trim Out (2) * 12.10.2025 |
Completed except for small fixture on hall bathroom. And the completion of installing the dishwasher. |
|
| -- |
-- |
Install Appliances (0) * 12.16.2025 |
Delivery set for 11/20. Full set of appliances are in the kitchen. |
|
| -- |
-- |
Paint 3 (2) * 12.16.2025 |
|
|
| -- |
-- |
Carpet (2) 11.15.2025 |
In process 11/12 |
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) 12.19.2025 |
|
|
| -- |
-- |
Inspection (Final HVAC) (0) 12.16.2025 |
|
|
| -- |
-- |
Inspection (Final Plumbing) (0) 12.16.2025 |
|
|
| -- |
-- |
Inspection (Final Electric) (0) 12.16.2025 |
|
|
| -- |
-- |
Inspection (Final Building) (4) * 12.16.2025 |
|
|
| -- |
-- |
Pre Walk Through (0) 12.18.2025 |
|
|
| -- |
-- |
Stain Hardwood Stairs (1) * 12.17.2025 |
|
|
| -- |
-- |
Cleaning (1) 12.20.2025 |
|
|
| -- |
-- |
Certificate of Occupancy (1) * 12.18.2025 |
|
|
| -- |
-- |
C.O. to Lender (0) 12.18.2025 |
|
|
| -- |
-- |
Schedule Closing (0) 12.18.2025 |
|
|
| -- |
-- |
Buyer Walk Through (1) * 12.19.2025 |
|
|
| -- |
-- |
Payment for Upgrades (0) 12.15.2025 |
|
|
| -- |
-- |
Keys to Settlement Agent (0) 12.15.2025 |
|
|
| -- |
-- |
Review Settlement Statement (0) 12.17.2025 |
|
|
| -- |
-- |
Jerry Signs Closing Documents (0) 08.27.2025 |
|
|
| -- |
-- |
Request Trash Tote From POA Manager (0) 12.16.2025 |
|
|
| -- |
-- |
Closing (1) 12.20.2025 |
Brittany @ West View Title |
|
| -- |
-- |
Remove Coded Lockbox (0) 01.08.2026 |
|
|