| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finish Bonus Room | ||||
| Finished Bathroom | ||||
| Expanded Driveway | ||||
| Level zero quartz kitchen countertops | ||||
| Coffee bar with stained cabinetry with level 0 quartz | ||||
| Baguette seating | ||||
| Double waste basket in the island | ||||
| Farmhouse sink | ||||
| Cabinet crown molding | ||||
| Three drawer stack in both the base 36 and 18 inch cabinets | ||||
| Spice rack | ||||
| Upgraded luxury vinyl plank in the bonus room | ||||
| Luxury vinyl plank in upstairs hallway and bedrooms | ||||
| Upgraded LVT in all baths and laundry | ||||
| Eggshell paint finish | ||||
| Living room ceiling fan | ||||
| Digital deadbolt | ||||
| Garage door opener keypad | ||||
| Ecobee3 light, smart Wi-Fi and enable thermostat | ||||
| 4 inch crown molding on main level | ||||
| White subway Tile shower walls in the master bathroom | ||||
| Heavy glass bypass shower door with black trim | ||||
| Farmhouse, plumbing package ( all baths) | ||||
| French Model Fridge | ||||
| Roll Out Trays in Base 36" | ||||
| Oak stairs to Bedroom Level | ||||
| Level 0 Quartz in ALL THREE bathrooms | ||||
| Amendment to increase price by $44,665 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 07.31.2025 | ||
| -- | -- | Inspection (Concrete Wall) (1) 07.31.2025 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 07.31.2025 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 07.31.2025 | ||
| -- | -- | Inspection (Slab) (1) 07.31.2025 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.28.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 10.22.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 10.22.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 10.22.2025 | ||
| -- | -- | Inspection (Framing) (1) * 10.22.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 12.22.2025 | ||
| -- | -- | Inspection (Insulation) (1) 10.30.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 10.30.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 10.30.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 10.30.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 01.24.2026 | ||
| -- | -- | Inspection (Final Plumbing) (0) 01.24.2026 | ||
| -- | -- | Inspection (Final Electric) (0) 01.24.2026 | ||
| -- | -- | Inspection (Final Building) (4) * 01.24.2026 | Friday, Jan 23 | |