1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 3  ::  1780 Heritage Estates Circle
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Ratified Contract? (0)      
Thu    Nov 28      $2500 Deposit Received (0)      
Thu    Nov 28      Association Packet Requested (0)      
Thu    Nov 28      Association Packet Received (0)      
Thu    Nov 28      Selections Meeting (0)      
Thu    Nov 28      Selections Sheet Signed (0)      
Thu    Nov 28      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Thu    Nov 28      Deposit For Upgrades Received (0)      
Thu    Nov 28      Inspection (Concrete Wall) (1)      
Fri    Nov 29      Inspection (Conduit Under Slab) (1)      
Mon    Dec 2      Inspection (Drain Tile) (0)      
Mon    Dec 2      Settlement Agent Confirmed (0)      
Mon    Dec 2      Verify Window & Roof Structure (0)      
Mon    Dec 2      Patio (0)      
Mon    Dec 2      Rough In Microwave Vent (0)      
Mon    Dec 2      Inspection (Rough In Plumbing) (1)      
Tue    Dec 3      Inspection (Rough In Electric) (1)      
Wed    Dec 4      Inspection (Deck Piers) (0)      
Wed    Dec 4      Inspection (Framing) (1)      
Thu    Dec 5      Exterior Stone (0)      
Thu    Dec 5      Set Electric Meter (0)      
Thu    Dec 5      Inspection (Main Water Line) (0)      
Thu    Dec 5      Loan Approval (0)      
Thu    Dec 5      Deed Preparation (0)      
Thu    Dec 5      Mailbox (0)      
Thu    Dec 5      Order Plumbing / Lighting Fixtures (0)      
Thu    Dec 5      Interior Trim - Paint (1)      
Fri    Dec 6      Ceiling Fans (0)      
Fri    Dec 6      Blower Door Test (1)      
Mon    Dec 9      Inspection (Final HVAC) (1)      
Tue    Dec 10      Inspection (Final Plumbing) (1)      
Wed    Dec 11      Inspection (Final Electric) (1)      
Thu    Dec 12      Stain Hardwood Stairs (1)      
--   --   Replace Window Ready to replace 9/1/2021
--   --   Rick out of town Sept 28 - Oct 5
-- -- Building Permit (30)  09.01.2021    
-- -- Order Roof & Floor Trusses (1)  09.01.2021    
-- -- Order Windows & Doors (0)  09.01.2021    
-- -- Stake Out Home (1)  09.01.2021    
-- -- Excavate (2)  09.01.2021    
-- -- Inspection (Footers) (1)  09.01.2021    
-- -- Pour Footers (1)  09.01.2021    
-- -- Set Forms (2)  09.01.2021    
-- -- Pour Foundation Walls (1)  09.01.2021    
-- -- Plumb Slab (2)  09.01.2021    
-- -- Inspection (Plumbing Under Slab) (1)  09.01.2021    
-- -- Prepare Slab (1)  09.01.2021    
-- -- Inspection (Slab) (1)  09.01.2021    
-- -- Pour Slab (1) *   09.01.2021    
-- -- Framing I (9)  09.01.2021    
-- -- Order Steps (0)  09.01.2021    
-- -- Order Tubs / Showers (0)  09.01.2021    
-- -- Framing II (8)  09.01.2021    
-- -- Framing III (8) *   09.01.2021    
-- -- Install Stairs (0)  09.01.2021    
-- -- Windows & Doors (0)  09.01.2021    
-- -- House Number and Status in Window (0)  09.01.2021    
-- -- Roofing (0)  09.01.2021    
-- -- Order Cabinets (0)  09.01.2021    
-- -- Order Appliances (0)  09.01.2021    
-- -- Deck (0)  09.01.2021    
-- -- Gutters (0)  09.01.2021    
-- -- Driveway (0)  09.01.2021    
-- -- Privacy Divider / Fence (0)  09.01.2021    
-- -- Sod / Seed / Landscaping (0)  09.01.2021    
-- -- HVAC Rough In (4)  09.01.2021    
-- -- Inspection (Rough In HVAC) (1)  09.01.2021    
-- -- Plumbing Rough In (4)  09.01.2021    
-- -- Electric Rough In (4)  09.01.2021    
-- -- Exterior Vinyl (0) *   09.01.2021    
-- -- Insulation (2)  09.01.2021    
-- -- Inspection (Insulation) (1)  09.01.2021    
-- -- Inspection (Electric Service) (0)  09.01.2021    
-- -- Inspection (Main Sewer Line) (0)  09.01.2021    
-- -- Order Interior Doors & Trim (0)  09.01.2021    
-- -- Drywall (Hang) (4) *   09.01.2021    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   09.01.2021    
-- -- Paint 1 (1)  09.01.2021    
-- -- Garage Door (0)  09.01.2021    
-- -- House Numbers (0)  09.01.2021    
-- -- Cabinet Installation (2) *   09.01.2021    
-- -- Granite Installation (1) *   09.01.2021    
-- -- Interior Trim - Install (3)  09.01.2021    
-- -- Luxury Vinyl Plank (3) *   09.01.2021    
-- -- Luxury Vinyl Tile (0)  09.01.2021    
-- -- Paint 2 (3)  09.01.2021    
-- -- Cover Floors (1)  09.01.2021    
-- -- Deliver Plumbing / Lighting Fixtures (0)  09.01.2021    
-- -- Shoe Moulding (0)  09.01.2021    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  09.01.2021    
-- -- Install Coded Lockbox (add extra keys) (0)  09.01.2021    
-- -- Pay Water / Sewer Taps (0)  09.01.2021    
-- -- Set Water Meter (0)  09.01.2021    
-- -- Electric Trim Out (3)  09.01.2021    
-- -- HVAC Trim Out (1)  09.01.2021    
-- -- Plumbing Trim Out (2)  09.01.2021    
-- -- Install Appliances (0) *   09.01.2021    
-- -- Paint 3 (2) *   09.01.2021    
-- -- Carpet (2)  09.01.2021    
-- -- Appraiser Confirms Construction Completion (0)  09.01.2021    
-- -- Inspection (Final Building) (2) *   09.01.2021    
-- -- Pre Walk Through (0)  09.01.2021    
-- -- Cleaning (1)  09.01.2021    
-- -- Certificate of Occupancy (1) *   09.01.2021    
-- -- C.O. to Lender (0)  09.01.2021    
-- -- Schedule Closing (0)  09.01.2021    
-- -- Buyer Walk Through (1)  09.01.2021    
-- -- Payment for Upgrades (0)  09.01.2021    
-- -- Keys to Settlement Agent (0)  09.01.2021    
-- -- Review Settlement Statement (0)  09.01.2021    
-- -- Jerry Signs Closing Documents (0)  09.01.2021    
-- -- Request Trash Tote From POA Manager (0)  09.01.2021    
-- -- Closing (1)  09.01.2021    
-- -- Remove Coded Lockbox (0)  09.01.2021