4' x 10' pop out on garage |
|
12' x 12' patio off rec room |
|
12' x 12' screened porch |
|
4' x 12' observation deck |
|
Lower Level Improvements |
|
Upper Level Layout Changes |
|
Broom closet |
|
Linen closet |
|
Garage closet |
|
Hardwood in master bedroom |
|
Whirlpool tub in master bath in place of standard tub |
|
Hardwood treads on stairs |
|
Bar faucet |
|
Kitchen faucet upgrade |
|
1/2 bath faucet upgrade |
|
Carpet Upgrade |
|
Pad Upgrade |
|
Additional can lights over 11 (7 extra) |
|
Replace damaged wood at basement bar (Gabby) |
|
Replace kitchen sink large/small CQ3220L |
|
Tilt outs in kitchen with soft close doors on all cabinets? |
|
Tile basement wet bar area not large enough for portable bar with 36 inch requirement space from the back cabinet |
|
No cubby hole in master bath |
|
Increase tile area at wet bar |
|
Labor cost for basement ceramic tile |
|
missing a ceiling fan in basement family room |
|
New hood on order |
|
Basement exterior light on order |
|
Reseed yard |
|
Dedicated bar circuit |
|
Freezer outlet |
|
Sink receptacle |
|