Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Building Permit (30) |
|
|
Tue |
Jun 10 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Jun 11 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
Jun 12 |
Inspection (Drain Tile) (0) |
|
|
Thu |
Jun 12 |
Settlement Agent Confirmed (0) |
|
|
Thu |
Jun 12 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Jun 12 |
Patio (0) |
|
|
Thu |
Jun 12 |
Rough In Microwave Vent (0) |
|
|
Thu |
Jun 12 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
Jun 13 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
Jun 16 |
Inspection (Deck Piers) (0) |
|
|
Mon |
Jun 16 |
Inspection (Framing) (1) * |
|
|
Tue |
Jun 17 |
Exterior Stone (0) |
|
|
Tue |
Jun 17 |
Set Electric Meter (0) * |
|
|
Tue |
Jun 17 |
Inspection (Main Water Line) (0) |
|
|
Tue |
Jun 17 |
Loan Approval (0) |
|
|
Tue |
Jun 17 |
Deed Preparation (0) |
|
|
Tue |
Jun 17 |
Mailbox (0) |
|
|
Tue |
Jun 17 |
Interior Trim - Paint (1) |
|
|
Wed |
Jun 18 |
Ceiling Fans (0) |
|
|
Wed |
Jun 18 |
Blower Door Test (1) |
|
|
Thu |
Jun 19 |
Inspection (Final HVAC) (1) |
|
|
Fri |
Jun 20 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
Jun 23 |
Inspection (Final Electric) (1) |
|
|
Tue |
Jun 24 |
Stain Hardwood Stairs (1) |
|
|
Wed |
Jun 25 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Handicapped accessible walkway? |
|
|
-- |
-- |
CODED LOCKBOX 0201 |
|
|
-- |
-- |
Weather stripping |
After paint 3 |
|
-- |
-- |
Bathroom vanity countertops |
On order per Kimberly-Kimberly sending date-MB in 4/7 |
|
-- |
-- |
Threshold where shower meets bathroom floor |
Jill to install |
|
-- |
-- |
Guest bathroom top |
Installed Thursday, 4/15 |
|
-- |
-- |
Bedroom door needs shaved down 4/17 |
Trim guys - Courtney will check it |
|
-- |
-- |
One closet needs shelving 4/17 |
Not complete 5/1 |
|
-- |
-- |
One closet needs shelving 4/17 |
|
|
-- |
-- |
Few handles |
Ron |
|
-- |
-- |
White receptacle in kitchen needs grey |
Jill will tell Harry |
|
-- |
-- |
Cracked tub (MB) |
Jill to schedule |
|
-- |
-- |
Adjust front door threshold |
|
|
-- |
-- |
Patch hole at bathroom light |
|
|
-- |
-- |
Sweep out debris and repair and secure shower to floor |
|
|
-- |
-- |
Cut light in over shower |
|
|
-- |
-- |
Patch drywall hole in master bath as well as vent in laundry room |
In process 4/28 |
|
-- |
-- |
Swap front door closet shelving with coat closet shelving |
|
|
-- |
-- |
Swap front door closet shelving with coat closet shelving |
|
|
-- |
-- |
Leave construction lockbox |
|
|
-- |
-- |
Leave construction lockbox |
|
|
-- |
-- |
Swap front door closet shelving with coat closet shelving |
|
|
-- |
-- |
Clean outdoor siding |
|
|
-- |
-- |
Cleaning again? |
|
|
-- |
-- |
Shower update |
|
|
-- |
-- |
Hole in back of shower in hall bathroom |
Jill is scheduling |
|
-- |
-- |
Shower grab bar |
Ron |
|
-- |
-- |
Tile shower |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
in process 5/3 |
|
-- |
-- |
Electric Rough In (4) |
In process 6/17 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
stocked 9/19 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs final sanding 10/10 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
In process 3/17 |
|
-- |
-- |
Granite Installation (1) * |
Kitchen in 3/21. Vanities are not. |
|
-- |
-- |
Interior Trim - Install (3) * |
On site 11/18 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
After first week of April |
|
-- |
-- |
Luxury Vinyl Tile (0) |
|
|
-- |
-- |
Paint 2 (3) |
Agreeable grey is completed 2/24 |
|
-- |
-- |
Cover Floors (1) |
Jill after install |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
Kate will check on this |
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
|
|
-- |
-- |
Electric Trim Out (3) |
In process 4/21 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
in process 4/15 |
|
-- |
-- |
Install Appliances (0) * |
Waiting on range plug install from Harry |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
Mon, 4/12 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
After Harry finishes |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
5/14 |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Closing (1) |
West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|