Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
|
-- |
-- |
Exposed black area on back corner of home-landscaping repair? 10/14 |
|
|
-- |
-- |
CODED LOCKBOX 0103 |
|
|
-- |
-- |
Molding needed in archway 12/16 |
|
|
-- |
-- |
Trim/doors need painting 1/6 |
|
|
-- |
-- |
Drywall repair laundry room 2/27 |
In process 3/10 |
|
-- |
-- |
Need side sliding door keys |
|
|
-- |
-- |
Leak at air handler? |
Alex will take care of it |
|
-- |
-- |
Finish rear of the building landscaping? |
|
|
-- |
-- |
Stove plug needed |
|
|
-- |
-- |
Side splash incorrect hall bath? |
|
|
-- |
-- |
Final drywall finishing needed in laundry room |
|
|
-- |
-- |
Fridge w missing handles is located here |
|
|
-- |
-- |
Dead landscaping 5/19 |
Tom will tell them |
|
-- |
-- |
Master bath countertops needed |
|
|
-- |
-- |
Patch holes in closet |
In process |
|
-- |
-- |
Touch up paint |
|
|
-- |
-- |
Lightbulbs |
Jill |
|
-- |
-- |
Covers for MB light |
Jill |
|
-- |
-- |
Cable |
|
|
-- |
-- |
Cable cover on wall |
Jill will contact Lumos |
|
-- |
-- |
shower rod in master bath needs installed~missing one end piece |
Jill |
|
-- |
-- |
take robe hook off the wall outside shower~owner does not want it |
Jill will tell Majer |
|
-- |
-- |
put ring around the sprinkler in the laundry room ceiling |
Tom-ring is on top of laundry shelving. Just needs installed 6/5 |
|
-- |
-- |
garbage disposal is not wired |
Jill will remind Harry- seems to work ok 6/5 |
|
-- |
-- |
caulk around the sprinkler in living room ceiling |
Jill will tell Majer |
|
-- |
-- |
splash block outside under the master bedroom window is tilted the wrong way~need to build it up a little in the back |
still needs to be adjusted as of 6/9 |
|
-- |
-- |
caulk around the pipes going in the ceiling in the mechanical room |
Jill will tell Majer |
|
-- |
-- |
|
|
|
-- |
-- |
Touch up paint at area where robe hook was located |
as of 6/9 |
|
-- |
-- |
Repair loud garbage disposal |
as of 6/9 |
|
-- |
-- |
Sweep or mop floors |
as of 6/9 |
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
One full set on site 3/10 |
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
in process 4/29 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
In process 7/15 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Stocked 9/19 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
in process 10/31 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
Installation May 13 |
|
-- |
-- |
Granite Installation (1) * |
Partially complete 5/15 |
|
-- |
-- |
Interior Trim - Install (3) * |
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Mon, May 17 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
|
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
Jill will take care of it |
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
Wed, May 19? |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
|
|
-- |
-- |
Electric Trim Out (3) |
Partially complete 5/31 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
|
|
-- |
-- |
Install Appliances (0) * |
All on site 5/15 |
|
-- |
-- |
Paint 3 (2) * |
|
|
-- |
-- |
Carpet (2) |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
6/1 afternoon |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
|
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
June 11th at 11AM |
|
-- |
-- |
Buyer Walk Through (1) |
Wed, June 2 |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) |
|
|
-- |
-- |
Closing (1) |
June 11th at 11AM |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|