Tue |
Apr 29 |
Ratified Contract? (0) |
|
|
Tue |
Apr 29 |
$2500 Deposit Received (0) |
|
|
Tue |
Apr 29 |
Association Packet Requested (0) |
|
|
Tue |
Apr 29 |
Association Packet Received (0) |
|
|
Tue |
Apr 29 |
Selections Meeting (0) |
|
|
Tue |
Apr 29 |
Selections Sheet Signed (0) |
|
|
Tue |
Apr 29 |
Amendment for Upgrades (B,S,L,T,BCP) (0) |
|
|
Tue |
Apr 29 |
Deposit For Upgrades Received (0) |
|
|
Tue |
Apr 29 |
Inspection (Concrete Wall) (1) |
|
|
Wed |
Apr 30 |
Inspection (Conduit Under Slab) (1) |
|
|
Thu |
May 1 |
Inspection (Drain Tile) (0) |
|
|
Thu |
May 1 |
Settlement Agent Confirmed (0) |
|
|
Thu |
May 1 |
Verify Window & Roof Structure (0) |
|
|
Thu |
May 1 |
Patio (0) |
|
|
Thu |
May 1 |
Rough In Microwave Vent (0) |
|
|
Thu |
May 1 |
Inspection (Rough In Plumbing) (1) |
|
|
Fri |
May 2 |
Inspection (Rough In Electric) (1) |
|
|
Mon |
May 5 |
Inspection (Deck Piers) (0) |
|
|
Mon |
May 5 |
Inspection (Framing) (1) * |
|
|
Tue |
May 6 |
Exterior Stone (0) |
|
|
Tue |
May 6 |
Set Electric Meter (0) * |
|
|
Tue |
May 6 |
Inspection (Main Water Line) (0) |
|
|
Tue |
May 6 |
Loan Approval (0) |
|
|
Tue |
May 6 |
Deed Preparation (0) |
|
|
Tue |
May 6 |
Mailbox (0) |
|
|
Tue |
May 6 |
Interior Trim - Paint (1) |
|
|
Wed |
May 7 |
Ceiling Fans (0) |
|
|
Wed |
May 7 |
Blower Door Test (1) |
|
|
Thu |
May 8 |
Inspection (Final HVAC) (1) |
|
|
Fri |
May 9 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
May 12 |
Inspection (Final Electric) (1) |
|
|
Tue |
May 13 |
Stain Hardwood Stairs (1) |
|
|
Wed |
May 14 |
Request Trash Tote From POA Manager (0) |
|
|
|
-- |
-- |
Framing issue? 8/30 |
|
|
-- |
-- |
CODED LOCKBOX 0303 |
|
|
-- |
-- |
Gray vinyl plank flooring |
|
|
-- |
-- |
small square to fill before flooring |
Tom |
|
-- |
-- |
Hole in white trim above front door |
Sprinkler? |
|
-- |
-- |
Rate lock expires 2/10 |
|
|
-- |
-- |
Sprinkler inspection |
Waiting on re-inspect by fire marshal on Feb 17 |
|
-- |
-- |
Paint 3 does not look completed 2/6 |
|
|
-- |
-- |
Mixed metal bath fixtures 2/6 |
|
|
-- |
-- |
Cabinet trim needed 2/6 |
Painter |
|
-- |
-- |
Bath cabinet trim needed 2/6 |
Painter |
|
-- |
-- |
Paint door 2/6 |
Trim - Painter. Not done 2/17 |
|
-- |
-- |
More keys? 2/6 |
|
|
-- |
-- |
Need black shower rods |
just one |
|
-- |
-- |
Need black towel rings |
Towel bar, towel ring, toilet paper holder |
|
-- |
-- |
Cable outlet covers needed 2/10 |
|
|
-- |
-- |
Paint and caulk angle between ceiling and wall |
|
|
-- |
-- |
Fridge seems to be abnormally loud 2/14 |
|
|
-- |
-- |
Fridge seems to be abnormally loud 2/14 |
|
|
-- |
-- |
For Kimberly Dash missing handle cabinet under sink also new cabinet correct size and scratch on drawer panel in half bath |
|
|
-- |
-- |
Paint exterior door and trim |
|
|
-- |
-- |
Sand and paint area next to Arch going into the living room |
|
|
-- |
-- |
Replacement door front, cabinet door and drawer pull |
On order, then Tom will install |
|
-- |
-- |
Drywall repair at ceilings |
Mon, Feb 22 |
|
-- |
-- |
Send Isaac Hull an update on timing |
hullisaac@gmail.com |
|
-- |
-- |
Sand drywall repairs |
|
|
-- |
-- |
Paint drywall repairs |
|
|
-- |
-- |
Building Permit (30) |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) |
|
|
-- |
-- |
Order Windows & Doors (0) |
|
|
-- |
-- |
Stake Out Home (1) |
|
|
-- |
-- |
Excavate (2) |
|
|
-- |
-- |
Inspection (Footers) (1) |
|
|
-- |
-- |
Pour Footers (1) * |
|
|
-- |
-- |
Set Forms (2) |
|
|
-- |
-- |
Pour Foundation Walls (1) |
|
|
-- |
-- |
Plumb Slab (2) |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) |
|
|
-- |
-- |
Prepare Slab (1) |
|
|
-- |
-- |
Inspection (Slab) (1) |
|
|
-- |
-- |
Pour Slab (1) * |
|
|
-- |
-- |
Framing I (9) |
|
|
-- |
-- |
Order Steps (0) |
|
|
-- |
-- |
Order Tubs / Showers (0) |
|
|
-- |
-- |
Framing II (8) |
|
|
-- |
-- |
Framing III (8) * |
|
|
-- |
-- |
Install Stairs (0) |
|
|
-- |
-- |
Windows & Doors (0) * |
|
|
-- |
-- |
House Number and Status in Window (0) |
|
|
-- |
-- |
Roofing (0) * |
|
|
-- |
-- |
Order Cabinets (0) |
|
|
-- |
-- |
Order Appliances (0) |
|
|
-- |
-- |
Deck (0) |
|
|
-- |
-- |
Gutters (0) |
|
|
-- |
-- |
Driveway (0) * |
|
|
-- |
-- |
Privacy Divider / Fence (0) |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) |
|
|
-- |
-- |
HVAC Rough In (4) |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) |
|
|
-- |
-- |
Plumbing Rough In (4) |
|
|
-- |
-- |
Electric Rough In (4) |
In process 7/8 |
|
-- |
-- |
Exterior Vinyl (0) * |
|
|
-- |
-- |
Insulation (2) * |
|
|
-- |
-- |
Inspection (Insulation) (1) |
|
|
-- |
-- |
Inspection (Electric Service) (0) |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) |
|
|
-- |
-- |
Order Interior Doors & Trim (0) |
|
|
-- |
-- |
Drywall (Hang) (4) * |
Stocked 9/19 |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * |
Needs final sanding 11/4 |
|
-- |
-- |
Paint 1 (1) |
|
|
-- |
-- |
Garage Door (0) * |
|
|
-- |
-- |
House Numbers (0) |
|
|
-- |
-- |
Cabinet Installation (2) * |
1/28 delivery, 1/29 install |
|
-- |
-- |
Granite Installation (1) * |
Set for 2/1 GWB |
|
-- |
-- |
Interior Trim - Install (3) * |
Needs painting 1/9 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * |
Mon, Feb 1 - Tue, Feb 2 |
|
-- |
-- |
Luxury Vinyl Tile (0) |
Mon, Feb 1 - Tue, Feb 2 on site GWB |
|
-- |
-- |
Paint 2 (3) |
|
|
-- |
-- |
Cover Floors (1) |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) |
|
|
-- |
-- |
Shoe Moulding (0) |
2/4 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * |
Wed, Feb 3 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) |
|
|
-- |
-- |
Set Water Meter (0) * |
|
|
-- |
-- |
Electric Trim Out (3) |
Needs panel - 2/4 |
|
-- |
-- |
HVAC Trim Out (1) |
|
|
-- |
-- |
Plumbing Trim Out (2) |
2/4 hopefully |
|
-- |
-- |
Install Appliances (0) * |
CJ - 2/4 hopefully |
|
-- |
-- |
Paint 3 (2) * |
Galindez set to finish 2/4 GWB |
|
-- |
-- |
Carpet (2) |
Padding down 2/3 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) |
|
|
-- |
-- |
Inspection (Final Building) (2) * |
2/5 |
|
-- |
-- |
Pre Walk Through (0) |
|
|
-- |
-- |
Cleaning (1) |
Jill will talk to Kelly, 2/11 |
|
-- |
-- |
Certificate of Occupancy (1) * |
|
|
-- |
-- |
C.O. to Lender (0) |
|
|
-- |
-- |
Schedule Closing (0) |
|
|
-- |
-- |
Buyer Walk Through (1) |
Mon, Feb 15? |
|
-- |
-- |
Payment for Upgrades (0) |
|
|
-- |
-- |
Keys to Settlement Agent (0) |
|
|
-- |
-- |
Review Settlement Statement (0) |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) |
West View Title, Mon, Feb 22 @ 12:30 PM |
|
-- |
-- |
Closing (1) |
West View Title, Mon, Feb 22 @ 10:00 AM |
|
-- |
-- |
Remove Coded Lockbox (0) |
|
|