CONGERS-2 - 1  ::  501 Via Rome
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Wednesday (Apr 23)    show all photos
Wed    Apr 30      Inspection (Footers) (1)      
Thu    May 1      Inspection (Concrete Wall) (1)      
Fri    May 2      Inspection (Plumbing Under Slab) (1)      
Mon    May 5      Inspection (Conduit Under Slab) (1)      
Tue    May 6      Inspection (Slab) (1)      
Wed    May 7      Inspection (Drain Tile) (0)      
Wed    May 7      Inspection (Rough In HVAC) (1)      
Thu    May 8      Inspection (Rough In Plumbing) (1)      
Fri    May 9      Inspection (Rough In Electric) (1)      
Mon    May 12      Inspection (Deck Piers) (0)      
Mon    May 12      Inspection (Framing) (1) *       
Tue    May 13      Inspection (Insulation) (1)      
Wed    May 14      Inspection (Electric Service) (0)      
Wed    May 14      Inspection (Main Sewer Line) (0)      
Wed    May 14      Inspection (Main Water Line) (0)      
Wed    May 14      Inspection (Final HVAC) (1)      
Thu    May 15      Inspection (Final Plumbing) (1)      
Fri    May 16      Inspection (Final Electric) (1)      
Mon    May 19      Inspection (Final Building) (2) *