1 14 73 65 61 62 63 ADDR
CONGERS-2 - 2  ::  1280 Constitution Court #104
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   CODED LOCKBOX --- 9593 Or 9074
--   --   Broken window
--   --   Cleaning
Tue    Apr 29      Ratified Contract? (0)      
Tue    Apr 29      $2500 Deposit Received (0)      
Tue    Apr 29      Association Packet Requested (0)      
Tue    Apr 29      Association Packet Received (0)      
Tue    Apr 29      Selections Meeting (0)      
Tue    Apr 29      Selections Sheet Signed (0)      
Tue    Apr 29      Amendment for Upgrades (B,S,L,T,BCP) (0)      
Tue    Apr 29      Deposit For Upgrades Received (0)      
Tue    Apr 29      Inspection (Concrete Wall) (1)      
Wed    Apr 30      Inspection (Conduit Under Slab) (1)      
Thu    May 1      Inspection (Drain Tile) (0)      
Thu    May 1      Settlement Agent Confirmed (0)      
Thu    May 1      Verify Window & Roof Structure (0)      
Thu    May 1      Order Appliances (0)      
Thu    May 1      Patio (0)      
Thu    May 1      Rough In Microwave Vent (0)      
Thu    May 1      Inspection (Rough In Plumbing) (1)      
Fri    May 2      Inspection (Rough In Electric) (1)      
Mon    May 5      Inspection (Deck Piers) (0)      
Mon    May 5      Inspection (Framing) (1) *       
Tue    May 6      Exterior Stone (0)      
Tue    May 6      Set Electric Meter (0) *       
Tue    May 6      Inspection (Main Water Line) (0)      
Tue    May 6      Loan Approval (0)      
Tue    May 6      Deed Preparation (0)      
Tue    May 6      Mailbox (0)      
Tue    May 6      Order Plumbing / Lighting Fixtures (0)      
Tue    May 6      Interior Trim - Paint (1)      
Wed    May 7      Set Water Meter (0) *       
Wed    May 7      Ceiling Fans (0)      
Wed    May 7      Blower Door Test (1)      
Thu    May 8      Inspection (Final HVAC) (1)      
Fri    May 9      Inspection (Final Plumbing) (1)      
Mon    May 12      Inspection (Final Electric) (1)      
Tue    May 13      Stain Hardwood Stairs (1)      
Wed    May 14      Schedule Closing (0)      
Wed    May 14      Keys to Settlement Agent (0)      
Wed    May 14      Review Settlement Statement (0)      
Wed    May 14      Jerry Signs Closing Documents (0)      
Wed    May 14      Request Trash Tote From POA Manager (0)      
Wed    May 14      Closing (1)      
Thu    May 15      Remove Coded Lockbox (0)      
--   --   Remove furniture, etc.
--   --   Install all heat registers
--   --   Move clock and table to Townes 105
--   --   Move clock to Jerry's house, table to Townes 105
--   --   Trim guy confused on a Cole of doors
--   --   Trim guy confused on a couple of doors
--   --   Remove stuff Kate will coordinate with Tom ASAP
--   --   Patch drywall on ceiling Interior Finishing
--   --   Touch up paint Isaac
--   --   Install bathroom vanity Alex
--   --   Repair sliding glass door Osbaldo
--   --   Repair master bedroom window Osbaldo
--   --   Check temperature at master bathroom shower Osbaldo - check on it
--   --   Install weather stripping at front door Osbaldo
--   --   Remove ladder Osbaldo
--   --   Fix four way light switch Alex
--   --   Install side splash
--   --   Add receptacle for microwave Tom
--   --   Move pillows to storage container Osbaldo
--   --   Install bed skirt on master bed Osbaldo
--   --   Install screens Tom will pick up and install
--   --   Move furniture to Heritage 5 Tues, Apr 3
--   --   Extend downspouts away from building Tom
--   --   Install filter in the plenum at the furnace
--   --   Make auxiliary heat work at the thermostat Ronnie is thinking about it
--   --   Flip laundry connection box right side up and swap hot/cold indicators ??????
--   --   Adjust bathroom vanity top installation with gaps between wall Osbaldo - caulk
--   --   Install missing vent fan cover in bathroom Ronnie
--   --   Repair exterior vent where grill is missing and flapper is stuck open. A bird was flying in/out - Tom
--   --   Adjust main entry strike plate so that the door will lock properly Dead bolt
--   --   Repair or replace master bedroom window - tilt lock mechanism not working properly Has arrived
--   --   Install missing shoe molding behind the toilet and between tub and vanity Tom
--   --   Touch up paint Kate will touch base with Isaac
--   --   Alert Suzanne that (when) all repairs are complete On order from Mongers
-- -- Building Permit (30)      
-- -- Order Roof & Floor Trusses (1)      
-- -- Order Windows & Doors (0)      
-- -- Stake Out Home (1)      
-- -- Excavate (2)      
-- -- Inspection (Footers) (1)      
-- -- Pour Footers (1) *       
-- -- Set Forms (2)      
-- -- Pour Foundation Walls (1)      
-- -- Plumb Slab (2)      
-- -- Inspection (Plumbing Under Slab) (1)      
-- -- Prepare Slab (1)      
-- -- Inspection (Slab) (1)      
-- -- Pour Slab (1) *       
-- -- Framing I (9)      
-- -- Order Steps (0)      
-- -- Order Tubs / Showers (0)      
-- -- Framing II (8)      
-- -- Framing III (8) *       
-- -- Install Stairs (0)      
-- -- Windows & Doors (0) *       
-- -- House Number and Status in Window (0)      
-- -- Roofing (0) *       
-- -- Order Cabinets (0)      
-- -- Deck (0)      
-- -- Gutters (0)      
-- -- Driveway (0) *       
-- -- Privacy Divider / Fence (0)      
-- -- Sod / Seed / Landscaping (0)      
-- -- HVAC Rough In (4)      
-- -- Inspection (Rough In HVAC) (1)      
-- -- Plumbing Rough In (4)      
-- -- Electric Rough In (4)      
-- -- Exterior Vinyl (0) *       
-- -- Insulation (2) *       
-- -- Inspection (Insulation) (1)      
-- -- Inspection (Electric Service) (0)      
-- -- Inspection (Main Sewer Line) (0)      
-- -- Order Interior Doors & Trim (0)      
-- -- Drywall (Hang) (4) *       
-- -- Drywall (Tape, Block, Skim, Sand) (6) *       
-- -- Paint 1 (1)      
-- -- Garage Door (0) *       
-- -- House Numbers (0)      
-- -- Cabinet Installation (2) *        Delivery Dec 2, Installation Dec 5
-- -- Granite Installation (1) *        Thurs Dec 15
-- -- Interior Trim - Install (3) *        11/28 will be complete today.
-- -- Luxury Vinyl Plank (3) *       
-- -- Luxury Vinyl Tile (0)       In process
-- -- Paint 2 (3)      
-- -- Cover Floors (1)      
-- -- Deliver Plumbing / Lighting Fixtures (0)      
-- -- Shoe Moulding (0)      
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *       
-- -- Install Coded Lockbox (add extra keys) (0)      
-- -- Pay Water / Sewer Taps (0)      
-- -- Electric Trim Out (3)      
-- -- HVAC Trim Out (1)      
-- -- Plumbing Trim Out (2)      
-- -- Install Appliances (0) *       
-- -- Paint 3 (2) *       
-- -- Carpet (2)      
-- -- Appraiser Confirms Construction Completion (0)      
-- -- Inspection (Final Building) (2) *       
-- -- Pre Walk Through (0)      
-- -- Cleaning (1)      
-- -- Certificate of Occupancy (1) *       
-- -- C.O. to Lender (0)      
-- -- Buyer Walk Through (1)       Tomorrow 4/24 at 10am
-- -- Payment for Upgrades (0)