1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 39  ::  1665 Bald Eagle Circle
[ BUILD: 16060127 ]       [ ELEC: 16080113 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
Client View In Progress....
Change Order #1
Change Order #2
Change Order #3
One additional paint color
Upgrade to rocker switches ($300), 4 dimmer switches ($140), 7 data covers ($280)
Mirror Credit
 
Completed....
6 x12 dining room bump out
Screened Porch (100 sq feet) screen door to deck CWD
2 foot stretch in garage width 22 x 20
Master bedroom tray ceiling
Add window to storage room down
Bump out 6 x 12 lower per plan (utility area)
Add stucco with stone shown to North
Brick vs. Shutters
Double doors for garage
Down finish bed, bath and closets
Upgrade down bath to tile
Add finished half bath
Upgrade powder bath down to tile
Bath up pedestal vs.vanity
12 x 18 decking ala Premier
10 x 10 slab off furnace under S porch (not stamped)
12 x 18 lower slab at walkout at basement past posts
Soffitt under all decking with fan
Stone bases on posts
Fireplace ( includes gas piping and chimney stack)
Stone fireplace facing allowance ($500)
Stainless Steel Appliances
Cabinets outlets standard (under cabinet flourescent like model)
Cabinets to ceiling add $10,000 allowance (total 12 k allowance)
TV connects (No surcharge)
Hinge Style Door Stops
Add 3 x 7 ceramic entry at basement
Hardwood and Wrought iron railing
Peep Hole entry door
Sod Lawn
Eggshell paint throughout
Shower seat
 
Deleted....
Room over garage trusses ($300)
200 feet of plywood floor ($480)
Firerated pull down stairs installed ($150)
CREDIT- Rounded Corners up and down
CREDIT- Brick Driveway perimeter
Additional concrete poured in basement (with attic space credit applied)
Eggshell Paint
CREDIT- from double to single garage door
Addition of two master bath windows
CREDIT- for Master Bath Tub
CREDIT- Laundry Room Shelving
Build out laundry wall
Master Bathroom Upgrades ( Wall to Wall Shower, Upgraded Tile and $100 change order fee)
Kitchen Upgrades (over standard- 2,000 contract allowance applied)
Hardware Allowance (buyer supplying her own)
Upgraded Carpet Pad
Cabinet Hardware Allowance ( Buyer providing her own)
Upgraded Carpet Pad
Lighting Upgrades
Plumbing Upgrades
Appliance Upgrades
CREDIT- VA Installations
Additional electrical charges Labor only per electrician