CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS


Sunday (Jun 28)    show all photos
TO DO
SR May 21 (41) Sidewalk from building to Shared Use Path Momentum
SR May 21 (41) Add stone between Stone Wall and Shared Use Path Tom
SR May 21 (41) Asphalt Repair at Stone Wall, Glass Doctor Tom to meet with John Jackson, Mark Phillips
SR May 21 (41) Final Grading & Top Soil Momentum
SR May 21 (41) Meet with Building Inspector Tom will coordinate
SR May 21 (41) Stripe Parking Lot Momentum
SR Jun 23 (8) Move Porta Potty
SR Jun 23 (8) New bushes at boundary with 1820 CCR?
SR Jun 23 (8) Large river stone instead of grass on top side of large retaining wall?
SR Jun 26 (5) Asphalt Berm on Larson Property
SR Jun 26 (5) Rerouting Larson water and sewer laterals
SR Jun 30 (1) Mowing - who shall do it?
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Internet Plan Tom to talk to Danny Beam
Water Metering Confirm plan with third party company
Foyer Flooring LVP everywhere?
Water Connection to First Building Complete?
Property Manager
Gas Line Relocation Mid December or Early January?
Ashlar Stamped Concrete - ramp, future foyers Stamped concrete overlay in foyer? Stamped concrete sidewalks?
Electricity Gil to talk to HEC about new pole
Glo Fiber Bulk Plan and Pricing, Alarm Room
Replace Sign Light at 1820 CCR
Lamp Posts
Phase 2 - Bond
Phase 2 - BMP Agreement signed, notarized, City, recorded, City
Phase 2 - Monitoring Agreement
Grading Easement for Revised Phase 2
CL May 9 (53) Patch a few places in the stucco that were damaged for electric installation
SR May 21 (41) Stone on Stone Wall Dale
SR May 21 (41) Mini Retaining Wall at Left Front Storm Drain Tom
SR May 21 (41) Seeding Pettit
SR Jun 9 (22) Stabilize dorman areas
SR Jun 9 (22) Stabilize dormant areas
SR Jun 9 (22) Maintain silt fencing at back corner
SR Jun 9 (22) Add inlet protection at stormwater curb inlets
SR Jun 23 (8) Move Momentum materials
SR Jun 23 (8) Soil & Seed behind Building 1
SR Jun 23 (8) Speed bump for drainage? Gil will find the specs
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  10.21.2025    
-- -- $2500 Deposit Received (0)  10.21.2025    
-- -- Association Packet Requested (0)  10.21.2025    
-- -- Association Packet Received (0)  02.09.2026    
-- -- Selections Meeting (0)  10.21.2025    
-- -- Selections Sheet Signed (0)  10.21.2025    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.21.2025    
-- -- Deposit For Upgrades Received (0)  10.21.2025    
-- -- Building Permit (30) *   10.21.2025    
-- -- Order Roof & Floor Trusses (1)  10.21.2025    
-- -- Order Windows & Doors (0)  10.21.2025    
-- -- Stake Out Home (1)  10.21.2025    
-- -- Excavate (2)  10.21.2025    
-- -- Inspection (Footers) (1)  10.21.2025    
-- -- Inspection (Concrete Wall) (1)  10.21.2025    
-- -- Pour Footers (1) *   05.21.2026    
-- -- Set Forms (2)  10.21.2025    
-- -- Pour Foundation Walls (1)  10.21.2025    
-- -- Plumb Slab (2)  10.21.2025    
-- -- Inspection (Plumbing Under Slab) (1)  10.21.2025    
-- -- Inspection (Conduit Under Slab) (1)  10.21.2025    
-- -- Prepare Slab (1)  10.21.2025    
-- -- Inspection (Slab) (1)  10.21.2025    
-- -- Inspection (Drain Tile) (0)  10.21.2025    
-- -- Pour Slab (1) *   10.21.2025    
-- -- Settlement Agent Confirmed (0)  10.21.2025    
-- -- Framing I (9)  10.21.2025    
-- -- Order Steps (0)  10.21.2025    
-- -- Order Tubs / Showers (0)  10.21.2025    
-- -- Framing II (8)  10.21.2025    
-- -- Framing III (8) *   10.21.2025    
-- -- Verify Window & Roof Structure (0)  10.21.2025    
-- -- Install Stairs (0) *   10.21.2025    
-- -- Windows & Doors (0) *   10.21.2025    
-- -- House Number and Status in Window (0)  10.21.2025    
-- -- Roofing (0) *   10.21.2025    
-- -- Order Cabinets (0)  10.21.2025    
-- -- Order Appliances (0)  10.21.2025    
-- -- Deck (0)  10.21.2025    
-- -- Gutters (0)  10.21.2025    
-- -- Driveway (0) *   10.21.2025    
-- -- Patio (0)  10.21.2025    
-- -- Privacy Divider / Fence (0) *   10.21.2025    
-- -- Sod / Seed / Landscaping (0)  10.21.2025    
-- -- HVAC Rough In (4)  10.21.2025    
-- -- Rough In Microwave Vent (0)  10.21.2025    
-- -- Plumbing Rough In (4)  10.21.2025    
-- -- Electric Rough In (4)  10.21.2025    
-- -- Inspection (Rough In HVAC) (1)  10.21.2025    
-- -- Inspection (Rough In Plumbing) (1)  10.21.2025    
-- -- Inspection (Rough In Electric) (1)  10.21.2025    
-- -- Inspection (Framing) (1) *   10.21.2025    
-- -- Inspection (Deck Piers) (0)  10.21.2025    
-- -- Exterior Vinyl (0) *   10.21.2025    
-- -- Exterior Stone (0)  10.21.2025    
-- -- Insulation (2) *   10.21.2025    
-- -- Inspection (Insulation) (1)  10.21.2025    
-- -- Inspection (Electric Service) (0)  10.21.2025    
-- -- Set Electric Meter (0) *   10.21.2025    
-- -- Inspection (Main Sewer Line) (0)  10.21.2025    
-- -- Inspection (Main Water Line) (0)  10.21.2025    
-- -- Order Interior Doors & Trim (0)  10.21.2025    
-- -- Drywall (Hang) (4) *   10.21.2025    
-- -- Loan Approval (0)  10.21.2025    
-- -- Deed Preparation (0)  10.21.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   10.21.2025    
-- -- Paint 1 (1)  10.21.2025    
-- -- Garage Door (0)  10.21.2025    
-- -- House Numbers (0)  10.21.2025    
-- -- Mailbox (0)  10.21.2025    
-- -- Cabinet Installation (2) *   10.21.2025    
-- -- Granite Installation (1) *   10.21.2025    
-- -- Interior Trim - Install (3) *   10.21.2025    
-- -- Order Plumbing / Lighting Fixtures (0)  10.21.2025    
-- -- Interior Trim - Paint (1)  10.21.2025    
-- -- Luxury Vinyl Plank (3) *   10.21.2025    
-- -- Luxury Vinyl Tile (0)  10.21.2025    
-- -- Paint 2 (3)  10.21.2025    
-- -- Cover Floors (0)  10.21.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.21.2025    
-- -- Shoe Moulding (0)  10.21.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   10.21.2025    
-- -- Install Coded Lockbox (add extra keys) (0)  10.21.2025    
-- -- Pay Water / Sewer Taps (0)  10.21.2025    
-- -- Set Water Meter (1) *   10.21.2025    
-- -- Electric Trim Out (3) *   10.21.2025    
-- -- Ceiling Fans (0)  10.21.2025    
-- -- HVAC Trim Out (1) *   10.21.2025    
-- -- Blower Door Test (1)  10.21.2025    
-- -- Plumbing Trim Out (2) *   10.21.2025    
-- -- Install Appliances (0) *   10.21.2025    
-- -- Paint 3 (2) *   10.21.2025    
-- -- Carpet (2)  10.21.2025    
-- -- Appraiser Confirms Construction Completion (0)  10.21.2025    
-- -- Inspection (Final HVAC) (0)  10.21.2025    
-- -- Inspection (Final Plumbing) (0)  10.21.2025    
-- -- Inspection (Final Electric) (0)  10.21.2025    
-- -- Inspection (Final Building) (4) *   10.21.2025    
-- -- Pre Walk Through (0)  10.21.2025    
-- -- Stain Hardwood Stairs (1) *   10.21.2025    
-- -- Cleaning (1)  10.21.2025    
-- -- Certificate of Occupancy (1) *   10.21.2025    
-- -- C.O. to Lender (0)  10.21.2025    
-- -- Schedule Closing (0)  10.21.2025    
-- -- Buyer Walk Through (1) *   10.21.2025    
-- -- Payment for Upgrades (0)  10.21.2025    
-- -- Keys to Settlement Agent (0)  10.21.2025    
-- -- Review Settlement Statement (0)  10.21.2025    
-- -- Jerry Signs Closing Documents (0)  10.21.2025    
-- -- Request Trash Tote From POA Manager (0)  10.21.2025    
-- -- Closing (1)  10.21.2025    
-- -- Remove Coded Lockbox (0)  10.21.2025