ADDR
VILLAS - 507-201 :: 507 Roman Way #201
CRITICAL PATH
|
INSPECTIONS
|
FLOOR PLANS
|
SELECTIONS
|
SPECS
|
CHANGES
|
NHS
view photo archive
TO DO
---
UPGRADES
---
CRITICAL PATH
Order Appliances
(0)
Wed
Jul 1
HVAC Rough In
(4)
Tue
Jul 7
Plumbing Rough In
(4)
Mon
Jul 13
Electric Rough In
(4)
Fri
Jul 17
Inspection (Rough In HVAC)
(1)
Mon
Jul 20
Inspection (Rough In Plumbing)
(1)
Tue
Jul 21
Inspection (Rough In Electric)
(1)
Wed
Jul 22
Inspection (Framing)
(1)
*
Thu
Jul 23
Insulation
(2)
*
Mon
Jul 27
Inspection (Insulation)
(1)
Inspection (Electric Service)
(0)
Set Electric Meter
(0)
*
Inspection (Main Sewer Line)
(0)
Inspection (Main Water Line)
(0)
Order Interior Doors & Trim
(0)
Tue
Jul 28
Drywall (Hang)
(4)
*
Mon
Aug 3
Drywall (Tape, Block, Skim, Sand)
(6)
*
Tue
Aug 11
Paint 1
(1)
House Numbers
(0)
Mailbox
(0)
Wed
Aug 12
Cabinet Installation
(2)
*
Fri
Aug 14
Granite Installation
(1)
*
Mon
Aug 17
Interior Trim - Install
(3)
*
Order Plumbing / Lighting Fixtures
(0)
Thu
Aug 20
Interior Trim - Paint
(1)
Fri
Aug 21
Luxury Vinyl Plank
(3)
*
Luxury Vinyl Tile
(0)
Wed
Aug 26
Paint 2
(3)
Cover Floors
(0)
Deliver Plumbing / Lighting Fixtures
(0)
Shoe Moulding
(0)
Mon
Aug 31
Shelving, Door Knobs, Fire Extinguisher
(1)
*
Install Coded Lockbox (add extra keys)
(0)
Pay Water / Sewer Taps
(0)
Tue
Sep 1
Set Water Meter
(1)
*
Wed
Sep 2
Electric Trim Out
(3)
*
Ceiling Fans
(0)
Mon
Sep 7
HVAC Trim Out
(1)
*
Tue
Sep 8
Blower Door Test
(1)
Wed
Sep 9
Plumbing Trim Out
(2)
*
Install Appliances
(0)
*
Fri
Sep 11
Paint 3
(2)
*
Tue
Sep 15
Carpet
(2)
Inspection (Final HVAC)
(0)
Inspection (Final Plumbing)
(0)
Inspection (Final Electric)
(0)
Thu
Sep 17
Inspection (Final Building)
(4)
*
Pre Walk Through
(0)
Wed
Sep 23
Stain Hardwood Stairs
(1)
*
Thu
Sep 24
Cleaning
(1)
Fri
Sep 25
Certificate of Occupancy
(1)
*
Keys to Settlement Agent
(0)
Request Trash Tote From POA Manager
(0)
Mon
Sep 28
Closing
(1)
Remove Coded Lockbox
(0)
TO DO - COMPLETED OR DELETED
---
UPGRADES - COMPLETED
---
CRITICAL PATH - COMPLETED
--
--
Ratified Contract?
(0) 09.25.2025
--
--
$2500 Deposit Received
(0) 09.25.2025
--
--
Association Packet Requested
(0) 09.25.2025
--
--
Association Packet Received
(0) 09.25.2025
--
--
Selections Meeting
(0) 09.25.2025
--
--
Selections Sheet Signed
(0) 09.25.2025
--
--
Amendment for Upgrades (B,S,L,T,BCP)
(0) 09.25.2025
--
--
Deposit For Upgrades Received
(0) 09.25.2025
--
--
Building Permit
(30)
*
06.12.2026
--
--
Order Roof & Floor Trusses
(1) 06.12.2026
--
--
Order Windows & Doors
(0) 06.12.2026
--
--
Stake Out Home
(1) 10.09.2025
--
--
Excavate
(2) 10.09.2025
--
--
Inspection (Footers)
(1) 10.09.2025
--
--
Inspection (Concrete Wall)
(1) 06.12.2026
--
--
Pour Footers
(1)
*
10.09.2025
--
--
Set Forms
(2) 06.12.2026
--
--
Pour Foundation Walls
(1) 06.12.2026
--
--
Plumb Slab
(2) 06.12.2026
--
--
Inspection (Plumbing Under Slab)
(1) 06.12.2026
--
--
Inspection (Conduit Under Slab)
(1) 06.12.2026
--
--
Prepare Slab
(1) 06.12.2026
--
--
Inspection (Slab)
(1) 06.12.2026
--
--
Inspection (Drain Tile)
(0) 06.12.2026
--
--
Pour Slab
(1)
*
06.12.2026
--
--
Settlement Agent Confirmed
(0) 09.25.2025
--
--
Framing I
(9) 06.12.2026
--
--
Order Steps
(0) 06.12.2026
--
--
Order Tubs / Showers
(0) 06.12.2026
--
--
Framing II
(8) 06.12.2026
--
--
Framing III
(8)
*
06.12.2026
--
--
Verify Window & Roof Structure
(0) 06.12.2026
--
--
Install Stairs
(0)
*
06.12.2026
--
--
Windows & Doors
(0)
*
06.12.2026
--
--
House Number and Status in Window
(0) 06.12.2026
--
--
Roofing
(0)
*
06.12.2026
--
--
Order Cabinets
(0) 06.13.2026
--
--
Deck
(0) 06.12.2026
--
--
Gutters
(0) 06.12.2026
--
--
Driveway
(0)
*
06.12.2026
--
--
Patio
(0) 06.12.2026
--
--
Privacy Divider / Fence
(0)
*
09.25.2025
--
--
Sod / Seed / Landscaping
(0) 06.12.2026
--
--
Rough In Microwave Vent
(0) 06.12.2026
--
--
Inspection (Deck Piers)
(0) 06.12.2026
--
--
Exterior Vinyl
(0)
*
06.12.2026
--
--
Exterior Stone
(0) 06.12.2026
--
--
Loan Approval
(0) 09.25.2025
--
--
Deed Preparation
(0) 09.25.2025
--
--
Garage Door
(0) 09.25.2025
--
--
Appraiser Confirms Construction Completion
(0) 09.25.2025
--
--
C.O. to Lender
(0) 09.25.2025
--
--
Schedule Closing
(0) 09.25.2025
--
--
Buyer Walk Through
(1)
*
09.25.2025
--
--
Payment for Upgrades
(0) 09.25.2025
--
--
Review Settlement Statement
(0) 09.25.2025
--
--
Jerry Signs Closing Documents
(0) 09.25.2025