| -- | -- | Put tub in bonus room | ||
| -- | -- | Don’t forget to put insulation in all bathtubs | ||
| -- | -- | Siding color at top peak of townhouse correct? | ||
| -- | -- | Back and side splashes of kitchen quartz are not correct | ||
| -- | -- | Garage needs trim | ||
| -- | -- | Are we OK with with the courts sides/be slightly different than previous townhouses in the kitchen? | Quartz | |
| -- | -- | Bottom faucet piece of hall bathroom needs installed | tub overflow drain cover | |
| -- | -- | Needs lots of lightbulbs | Electrician | |
| -- | -- | Sand8ng needed at drywall touchup in primary bathroom | ||
| -- | -- | Tell JoDee when to order final inspection by appraiser | Johnny Hensley | |
| -- | -- | Trim needed in front of all bathtubs | Bonus bath and up hallway | |
| -- | -- | All electrical covers needed after paint 3 | Jesus | |
| -- | -- | Hall light covers need installed | In stairway | |
| -- | -- | It appears painters started painting the back patio door? And then stopped? | Painter | |
| -- | -- | Garage door opener needed | Davenport | |
| -- | -- | What is the wire in the foyer inside the garage door? It looks like where the garage door opener is wired. | Davenport | |
| -- | -- | Powder bath light fixture needed | electrician | |
| -- | -- | Front door lock and hall bath mirror needed | Hall mirror needed 3/22 | |
| -- | -- | Front electrical outlet needs complete completed | ||
| -- | -- | Lots of gravel in the back? | ||
| -- | -- | Install shower rod in primary bathroom | Paul | |
| -- | -- | CODED LOCKBOX 3838 | ||
| -- | -- | Light fixture needed, in bonus bath | Electrician | |
| -- | -- | Thermostat needed | ||
| -- | -- | Trim above the garage needs to be nailed in in a few places | Tom | |
| -- | -- | Patch hole from where garage door opener wire was routed inside the house | ||
| -- | -- | Trim needed in bonus and hall bathroom 4/9 | ||
| -- | -- | Install railings | ||
| -- | -- | Probably needs painter to wrap up and touch up before painting can begin | In process 4/12 | |
| -- | -- | Bathtub trim needed in bonus bathroom 4/9 | ||
| -- | -- | Gray outlet covers needed on kitchen island | Electrician | |
| -- | -- | Microwave vent does not function. It does appear that metal mesh on exterior is bent and that may be causing the issue. | Tom | |
| -- | -- | Attic cover needed | after inspection | |
| -- | -- | Send and repaint a few bumpy areas in the front foyer | Ceiling in foyer | |
| -- | -- | Lots of scratched up areas on the stair treads | Jill, Jesus | |
| -- | -- | Window screens needed | Jill | |
| -- | -- | Remove yellow covers from smoke detectors | Jill | |
| -- | -- | Cover needed for cables under stairs | Tom | |
| -- | -- | Clean home and garage | Lynn. In process 4/16 | |
| -- | -- | Front door weatherstripping | Jill | |
| -- | -- | Hardwood steps need to be touched up | Jill, Jesus | |
| -- | -- | Caulk on trim in front of bathtubs | Painter | |
| -- | -- | Home inspection - Sat, Apr 19, 8am | ||
| -- | -- | Should we mop out the garage? Lots of glue and drywall | ||
| -- | -- | Touch up paint | ||
| -- | -- | Are we planning to cut down the tree on the back left-hand corner of their property line? It does not look in good shape and is definitely at risk of hitting the house. | ||
| -- | -- | Push the refrigerator back in place | ||
| -- | -- | Vent cover appears to be repaired, but microwave vent is still not functioning | ||
| -- | -- | Fix handle in smaller bedroom that has come apart | ||
| -- | -- | Repair the rear exterior deck door rubs at the frame when closed. | Jeremiah | |
| -- | -- | Need Gutter downspout extensions | ||
| -- | -- | damaged window sill Bonus Room | Epoxy - Tom | |
| -- | -- | Adjust door to deck- rubs when closed | Jeremiah | |
| -- | -- | Noted larger than average gaps at the outer rim joist and decking materials | Tom | |
| -- | -- | Noted improper slope at the rear left corner gutter; | Greg | |
| -- | -- | front bedroom door appears to be warped as it does not close as intended | Jorge | |
| -- | -- | loose trim at the corner of the kitchen island; recommend repair. | Jorge | |
| -- | -- | attic access panel is too small for the opening; recommend replacing the attic access panel to reduce the exchange of air with the attic. | Tom | |
| -- | -- | The water heater temperature seemed to be set too low at the time of inspection - just 106 degrees F. The range of 120-125 degrees F is the generally recommended temperature. This high tank temperature will reduce risks of Legionella developing in the tank. | Tom or Jill | |
| -- | -- | The refrigerator ice maker and water dispenser was not functional-the water source was not activated; recommend having water activated and the unit tested for proper operation | Jill | |
| -- | -- | Attic: Observed approximately 14 inches of insulation in the attic which is minimal for current standards; recommend installing additional insulation in the attic to conserve energy. | ||
| -- | -- | Clean behind fridge | Jill | |
| -- | -- | Cut down tree in back yard | Buddy | |
| -- | -- | clean dust from staircase lights | ||
| -- | -- | Remove dust from sconce lights | Lynn | |
| -- | -- | Broken closet door handle in Bedroom 2 | Savannah | |
| -- | -- | Is wire at liftmaster too long? | Tom | |
| -- | -- | Clean out garage | Jill or Lynn | |
| -- | -- | Paint touch up throughout | Jesus | |
| -- | -- | Splash blocks | Courtney will ask Bub | |
| -- | -- | Replace deck board that shrunk | Tom | |
| -- | -- | Install screens | Jill | |
| -- | -- | Folks are moving in4/26 | ||
| -- | -- | Mail keys (x4) | ||
| -- | -- | Carlos Olaechea, 540-830-2508 | ||
| -- | -- | Ratified Contract? (0) 10.04.2024 | ||
| Finished bonus room | ||||
| Finished bonus bath | ||||
| Expanded 12 x 18 deck | ||||
| Level 3 quartz | ||||
| White/gray painted cabinetry in kitchen | ||||
| Microwave vented to exterior | ||||
| Expanded driveway | ||||
| Oak steps to bedroom level | ||||
| Luxury Vinyl Plank upstairs | ||||
| Luxury vinyl plank, bonus room | ||||
| Amendment to increase price by $30,530 | ||||
| -- | -- | $2500 Deposit Received (0) 10.09.2024 | ||
| -- | -- | Association Packet Requested (0) 10.04.2024 | ||
| -- | -- | Association Packet Received (0) 10.11.2024 | ||
| -- | -- | Selections Meeting (0) 10.15.2024 | Requested for week of 10/14 | |
| -- | -- | Selections Sheet Signed (0) 10.24.2024 | 10/17: sent to Carlos | |
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 11.02.2024 | 11/2: sent to Jerry | |
| -- | -- | Deposit For Upgrades Received (0) 11.02.2024 | ||
| -- | -- | Building Permit (30) * 10.07.2024 | ||
| -- | -- | Order Roof & Floor Trusses (1) 10.17.2024 | ||
| -- | -- | Order Windows & Doors (0) 12.02.2024 | ||
| -- | -- | Stake Out Home (1) 10.14.2024 | ||
| -- | -- | Excavate (2) 10.21.2024 | ||
| -- | -- | Inspection (Footers) (1) 10.21.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.21.2024 | ||
| -- | -- | Pour Footers (1) * 10.21.2024 | ||
| -- | -- | Set Forms (2) 11.13.2024 | ||
| -- | -- | Pour Foundation Walls (1) 11.13.2024 | ||
| -- | -- | Plumb Slab (2) 11.13.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 11.13.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 11.13.2024 | ||
| -- | -- | Prepare Slab (1) 11.13.2024 | ||
| -- | -- | Inspection (Slab) (1) 11.13.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 12.02.2024 | ||
| -- | -- | Pour Slab (1) * 11.13.2024 | ||
| -- | -- | Settlement Agent Confirmed (0) 11.08.2024 | ||
| -- | -- | Framing I (9) 11.24.2024 | ||
| -- | -- | Order Steps (0) 12.09.2024 | ||
| -- | -- | Order Tubs / Showers (0) 12.23.2024 | ||
| -- | -- | Framing II (8) 12.02.2024 | ||
| -- | -- | Framing III (8) * 12.19.2024 | ||
| -- | -- | Verify Window & Roof Structure (0) 12.19.2024 | ||
| -- | -- | Install Stairs (0) * 12.23.2024 | ||
| -- | -- | Windows & Doors (0) * 01.05.2025 | ||
| -- | -- | House Number and Status in Window (0) 01.16.2025 | ||
| -- | -- | Roofing (0) * 01.05.2025 | ||
| -- | -- | Order Cabinets (0) 12.31.2024 | ||
| -- | -- | Order Appliances (0) 02.20.2025 | 200509339240360269 | |
| -- | -- | Deck (0) 02.26.2025 | ||
| -- | -- | Gutters (0) 02.16.2025 | ||
| -- | -- | Driveway (0) * 03.26.2025 | March 25 | |
| -- | -- | Patio (0) 03.15.2025 | Framed 3/5 | |
| -- | -- | Privacy Divider / Fence (0) * 03.15.2025 | ||
| -- | -- | Sod / Seed / Landscaping (0) 04.23.2025 | in process 4/19 | |
| -- | -- | HVAC Rough In (4) 01.18.2025 | In Process 1/15 | |
| -- | -- | Rough In Microwave Vent (0) 01.05.2025 | ||
| -- | -- | Plumbing Rough In (4) 01.16.2025 | almost completed 1/11 | |
| -- | -- | Electric Rough In (4) 01.23.2025 | Started 1/18 | |
| -- | -- | Inspection (Rough In HVAC) (1) 01.23.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 01.23.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 01.23.2025 | ||
| -- | -- | Inspection (Framing) (1) * 01.23.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 01.23.2025 | ||
| -- | -- | Exterior Vinyl (0) * 02.16.2025 | ||
| -- | -- | Exterior Stone (0) 03.12.2025 | ||
| -- | -- | Insulation (2) * 01.25.2025 | ||
| -- | -- | Inspection (Insulation) (1) 01.27.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 02.20.2025 | ||
| -- | -- | Set Electric Meter (0) * 04.09.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 02.20.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 02.20.2025 | ||
| -- | -- | Order Interior Doors & Trim (0) 01.27.2025 | ||
| -- | -- | Drywall (Hang) (4) * 02.01.2025 | ||
| -- | -- | Loan Approval (0) 03.24.2025 | JoDee @ United Bank (80% LTV) | |
| -- | -- | Deed Preparation (0) 03.06.2025 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 02.08.2025 | In process 2/5 | |
| -- | -- | Paint 1 (1) 02.08.2025 | ||
| -- | -- | Garage Door (0) 03.12.2025 | ||
| -- | -- | House Numbers (0) 03.22.2025 | ||
| -- | -- | Mailbox (0) 04.16.2025 | end of this week 4/10 or 4/11 | |
| -- | -- | Cabinet Installation (2) * 02.10.2025 | Fri, Feb 7 | |
| -- | -- | Granite Installation (1) * 02.20.2025 | Monday 2/17 | |
| -- | -- | Interior Trim - Install (3) * 02.16.2025 | In process 2/12 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) 02.17.2025 | ||
| -- | -- | Interior Trim - Paint (1) 02.16.2025 | ||
| -- | -- | Luxury Vinyl Plank (3) * 02.26.2025 | ||
| -- | -- | Luxury Vinyl Tile (0) 02.26.2025 | ||
| -- | -- | Paint 2 (3) 02.26.2025 | ||
| -- | -- | Cover Floors (1) 02.26.2025 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 02.20.2025 | ||
| -- | -- | Shoe Moulding (0) 03.12.2025 | ||
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 03.15.2025 | ||
| -- | -- | Install Coded Lockbox (add extra keys) (0) 03.26.2025 | ||
| -- | -- | Pay Water / Sewer Taps (0) 03.03.2025 | ||
| -- | -- | Set Water Meter (0) * 04.14.2025 | ||
| -- | -- | Electric Trim Out (3) * 03.12.2025 | In process 3/5 | |
| -- | -- | Ceiling Fans (0) 03.05.2025 | ||
| -- | -- | HVAC Trim Out (1) * 03.26.2025 | Needs thermostat | |
| -- | -- | Blower Door Test (1) 04.16.2025 | ||
| -- | -- | Plumbing Trim Out (2) * 03.05.2025 | ||
| -- | -- | Install Appliances (0) * 04.16.2025 | Dishwasher needs to be installed 4/6 | |
| -- | -- | Paint 3 (2) * 03.15.2025 | In process 3/12 | |
| -- | -- | Carpet (2) 02.26.2025 | ||
| -- | -- | Appraiser Confirms Construction Completion (0) 04.22.2025 | Mon, Apr 21 | |
| -- | -- | Inspection (Final HVAC) (1) 04.16.2025 | ||
| -- | -- | Inspection (Final Plumbing) (1) 04.16.2025 | ||
| -- | -- | Inspection (Final Electric) (1) 04.16.2025 | ||
| -- | -- | Inspection (Final Building) (2) * 04.16.2025 | Wed, Apr 16 | |
| -- | -- | Pre Walk Through (0) 04.17.2025 | ||
| -- | -- | Stain Hardwood Stairs (1) * 04.06.2025 | In process 3/22 | |
| -- | -- | Cleaning (1) 04.19.2025 | ||
| -- | -- | Certificate of Occupancy (1) * 04.22.2025 | ||
| -- | -- | C.O. to Lender (0) 04.22.2025 | ||
| -- | -- | Schedule Closing (0) 04.24.2025 | ||
| -- | -- | Buyer Walk Through (1) * 04.24.2025 | was this completed? Blue tape on walls? | |
| -- | -- | Payment for Upgrades (0) 04.17.2025 | ||
| -- | -- | Keys to Settlement Agent (0) 04.17.2025 | ||
| -- | -- | Review Settlement Statement (0) 04.22.2025 | ||
| -- | -- | Jerry Signs Closing Documents (0) 04.22.2025 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 04.21.2025 | ||
| -- | -- | Closing (1) 04.24.2025 | Brittany @ West View Title | |
| -- | -- | Remove Coded Lockbox (0) 04.28.2025 | ||