Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
|
-- |
-- |
Kate - does the upgrade pricing need to be adjusted? |
|
|
-- |
-- |
Framing adjustment per owner request |
completed per Jill 2/12 |
|
-- |
-- |
Some type of mesh is flaking off the bottom of the granite kitchen island countertop |
Jill checking it out |
|
-- |
-- |
Patch drywall on side of master bedroom door, framing |
Jesus |
|
-- |
-- |
Patch drywall framing around storage closet on main level as well |
Jesus |
|
-- |
-- |
Trim needed in garage |
Jorge |
|
-- |
-- |
Jim around garage is quite gapped |
Trim - nail it in - Buddy |
|
-- |
-- |
Upgraded fridge? |
Move to 45 |
|
-- |
-- |
Brown receptacle covers needed |
Jill |
|
-- |
-- |
CODED LOCKBOX 4343 |
|
|
-- |
-- |
Few electrical items in process 4/23 |
Finish foyer lights |
|
-- |
-- |
Master bathroom fan has not been put together for multiple days, is something wrong? |
Benefield - ceiling fan |
|
-- |
-- |
Need attic acces cover |
Jorge |
|
-- |
-- |
Ceiling Fan in Master Bedroom needs to be completed |
Electrician |
|
-- |
-- |
Starp wire in island |
Electrician |
|
-- |
-- |
need blower doorntest |
|
|
-- |
-- |
Closing May 23 |
|
|
-- |
-- |
Various places need to be sanded and painted |
Jesus. In process 5/7. One small space near the snap light above the refrigerator. |
|
-- |
-- |
Cabin and trim at stairs leading up to main level |
Gap |
|
-- |
-- |
Cable box cover needed |
Jill |
|
-- |
-- |
Final set of stain needed on steps leading to the bedroom level of the home |
Jesus |
|
-- |
-- |
Piece of shoe mold needs nailed at top level of staircase |
Jorge |
|
-- |
-- |
Gap in trim at stairs leading up to main level |
Caulk - Jesus |
|
-- |
-- |
CLOSING - MAY 22 (out of town) |
|
|
-- |
-- |
BUYER WALK THROUGH - MAY 22 (morning) |
Thursday AM |
|
-- |
-- |
Repaint wall from shenanigans |
Jesus |
|
-- |
-- |
Install deck screen |
Tom |
|
-- |
-- |
Remove broken fan from master bedroom |
Jill |
|
-- |
-- |
Closet under first set of steps, LVP does not go under shoe mold in the corner |
Denny |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Clean out bonus room |
Jill |
|
-- |
-- |
Sweep off patio |
Jill |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Stain on stairs a shade too dark (for future reference) |
|
|
-- |
-- |
Dark Mark on island next to receptacle |
Jill |
|
-- |
-- |
Remove yellow covers from smoke detector |
Jill |
|
-- |
-- |
Adjust upstairs bedroom closet doors |
Jill |
|
-- |
-- |
Remove the needed fan remote from wall- patch and paint |
Jesus |
|
-- |
-- |
A few more obvious gaps in deck boards |
Tom |
|
-- |
-- |
Exterior microwave vent cover a little wonky |
Tom |
|
-- |
-- |
Trim under master bump out window looks a little rough |
Exterior trim - Davenport |
|
-- |
-- |
Clean off deck |
Jill |
|
-- |
-- |
Kate to go back with blue tape once home is cleaned |
Kate |
|
-- |
-- |
Red staining on garage floor |
Jill |
|
-- |
-- |
Painter needs to clean up paint on the luxury vinyl plank |
Jesus |
|
-- |
-- |
Pressure wash front of house |
Jill |
|
-- |
-- |
BUYER WALK THROUGH - MAY 22 (11AM) |
|
|
-- |
-- |
Repaint front door |
|
|
-- |
-- |
Pressure wash front |
|
|
-- |
-- |
Repaint front door |
|
|
-- |
-- |
Owner stuff is in the garage |
|
|
-- |
-- |
Ratified Contract? (0) 11.19.2024 |
|
|
|
|
Level II Granite- Fantasy Brown
|
|
|
|
3 drawer stack in place of B36"- kitchen
|
|
|
|
LVP Up Hallway, Bedrooms,closets
|
|
|
|
Oak Stairs to Bedroom Level
|
|
|
|
Expanded 12 x 18 Deck
|
|
|
|
Expanded 10x10 Patio under deck
|
|
|
|
Expanded Driveway
|
|
|
|
Amendment to increase price by $11,320
|
|
-- |
-- |
$2500 Deposit Received (0) 12.05.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 11.23.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.05.2024 |
12/4: sent to Cindy |
|
-- |
-- |
Selections Sheet Signed (0) 01.23.2025 |
12/4: sent to Cindy |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.24.2025 |
1/23: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.23.2025 |
|
|
-- |
-- |
Building Permit (30) 10.07.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.17.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.02.2024 |
|
|
-- |
-- |
Stake Out Home (1) 10.14.2024 |
|
|
-- |
-- |
Excavate (2) 10.21.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.21.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.21.2024 |
|
|
-- |
-- |
Pour Footers (1) * 10.21.2024 |
|
|
-- |
-- |
Set Forms (2) 11.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 11.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Prepare Slab (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.02.2024 |
|
|
-- |
-- |
Pour Slab (1) * 12.02.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.25.2025 |
Tomahawk Title |
|
-- |
-- |
Framing I (9) 12.19.2024 |
|
|
-- |
-- |
Order Steps (0) 01.16.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 01.23.2025 |
|
|
-- |
-- |
Framing II (8) 12.28.2024 |
|
|
-- |
-- |
Framing III (8) * 01.13.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 01.16.2025 |
|
|
-- |
-- |
Install Stairs (0) 01.16.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 01.23.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.29.2025 |
|
|
-- |
-- |
Roofing (0) * 02.02.2025 |
|
|
-- |
-- |
Order Cabinets (0) 01.28.2025 |
|
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
Order # 200509355240380212 |
|
-- |
-- |
Deck (0) 03.21.2025 |
In process 3/19 |
|
-- |
-- |
Gutters (0) 03.19.2025 |
|
|
-- |
-- |
Driveway (0) * 04.06.2025 |
|
|
-- |
-- |
Patio (0) 03.15.2025 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.06.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 01.25.2025 |
in process 1/25 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.08.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.25.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 01.29.2025 |
|
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.08.2025 |
|
|
-- |
-- |
Electric Rough In (4) 02.05.2025 |
In process 2/1 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.08.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 02.08.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.15.2025 |
|
|
-- |
-- |
Exterior Stone (0) 04.12.2025 |
|
|
-- |
-- |
Insulation (2) * 02.08.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 02.12.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 02.20.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.20.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 02.20.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.16.2025 |
In process 2/12 |
|
-- |
-- |
Loan Approval (0) 04.28.2025 |
Cash |
|
-- |
-- |
Deed Preparation (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 02.26.2025 |
|
|
-- |
-- |
Paint 1 (1) 03.01.2025 |
|
|
-- |
-- |
Garage Door (0) * 03.19.2025 |
|
|
-- |
-- |
House Numbers (0) 04.28.2025 |
|
|
-- |
-- |
Mailbox (0) 04.16.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 03.05.2025 |
Install Tuesday, March 4 |
|
-- |
-- |
Granite Installation (1) * 03.08.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 03.15.2025 |
|
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 03.21.2025 |
In process 3/19 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 04.06.2025 |
In process 3/28. Almost completed. |
|
-- |
-- |
Luxury Vinyl Tile (0) 03.28.2025 |
In process 3/26 |
|
-- |
-- |
Paint 2 (3) 03.08.2025 |
|
|
-- |
-- |
Cover Floors (1) 04.12.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 04.06.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 04.19.2025 |
In process 4/16. Shelving and mirrors need finishing. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.21.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.27.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 04.14.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 04.16.2025 |
In process 4/12 |
|
-- |
-- |
Ceiling Fans (0) 04.12.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 04.12.2025 |
|
|
-- |
-- |
Blower Door Test (1) 05.06.2025 |
Monday, May 5th at 4pm |
|
-- |
-- |
Plumbing Trim Out (2) 04.06.2025 |
|
|
-- |
-- |
Install Appliances (0) * 04.27.2025 |
Microwave and refrigerator need installed |
|
-- |
-- |
Paint 3 (2) * 04.06.2025 |
|
|
-- |
-- |
Carpet (2) 04.06.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 05.23.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 05.08.2025 |
Tuesday, May 6 |
|
-- |
-- |
Inspection (Final Plumbing) (1) 05.08.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 05.08.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 05.08.2025 |
|
|
-- |
-- |
Pre Walk Through (0) 05.17.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 05.07.2025 |
Started 4/27 |
|
-- |
-- |
Cleaning (1) 05.17.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 05.09.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 05.09.2025 |
|
|
-- |
-- |
Schedule Closing (0) 05.23.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 05.23.2025 |
|
|
-- |
-- |
Payment for Upgrades (0) 05.05.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 05.22.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.22.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.23.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 05.08.2025 |
|
|
-- |
-- |
Closing (1) 05.23.2025 |
Tomahawk Title, Ashley, ashley@jwlpc.com, 757-340-8822 |
|
-- |
-- |
Remove Coded Lockbox (0) 05.31.2025 |
|
|