Damaged front door awning |
Davenport |
|
Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
|
-- |
-- |
Put BLK paint in the front dormer window |
|
|
-- |
-- |
Pulls on the far right kitchen cabinet look uneven |
Fred |
|
-- |
-- |
Painting will need to patch some drywall here near a few door frames |
Jesus |
|
-- |
-- |
Finish drywall and paint in garage |
|
|
-- |
-- |
Mid-level left window is broken in the corner |
On order |
|
-- |
-- |
Bit of caulking needed in kitchen around quartz countertops |
Jesus |
|
-- |
-- |
Garage needs trim |
|
|
-- |
-- |
Living room ceiling fan looks crooked |
|
|
-- |
-- |
Brown kitchen island receptacles needed |
Electrician |
|
-- |
-- |
Few electrical outlets need to be completed in the foyer area |
Electrician |
|
-- |
-- |
Patch, small hole in powder bath |
Jesus |
|
-- |
-- |
Need attic access cover |
Jorge |
|
-- |
-- |
Missing wall and floor registers |
Mast and Brunk |
|
-- |
-- |
Fill hole in bathroom wall/garage ceiling |
Jesus |
|
-- |
-- |
Strap wires in island |
Electrician |
|
-- |
-- |
Disposal not wired |
Electrician |
|
-- |
-- |
Mark Furnace |
Mast and Brunk |
|
-- |
-- |
Missing covers on switches beside garage side door |
electrician |
|
-- |
-- |
Lightbulb needed in garage |
electrician |
|
-- |
-- |
Refunding deposit to buyers? |
|
|
-- |
-- |
FHA appraiser - verifying completion |
Needs ladder in closet - Wed, May 7 at 9am |
|
-- |
-- |
Needs screen doors installed |
Tom |
|
-- |
-- |
Weatherstripping needed on exterior doors |
Jill |
|
-- |
-- |
CODED LOCKBOX 4444 |
|
|
-- |
-- |
Paint touch up taking place 5/10 |
Few spots still needed. Mostly on trim. |
|
-- |
-- |
Buyer noted metal roof at door to be fixed. |
Tom/Greg |
|
-- |
-- |
Clean out garage |
Jill, Lynn |
|
-- |
-- |
Clean construction materials out of grass and gravel |
Jill |
|
-- |
-- |
Garage door not operating as it should |
Jill |
|
-- |
-- |
Receptacle cover needed at light in garage |
Jesus |
|
-- |
-- |
Clean off deck |
Jill |
|
-- |
-- |
Caulk or clean up corners where Quartz backsplash meets wall |
Jesus |
|
-- |
-- |
Hang up fire extinguisher in pantry |
Tom |
|
-- |
-- |
Powder room door to be adjusted. Catches just a little. |
Jorge |
|
-- |
-- |
|
|
|
-- |
-- |
Door to closet under stairs on middle level to be adjusted. Too tight. |
Jorge |
|
-- |
-- |
Remove yellow covers from smoke detector |
Jill |
|
-- |
-- |
Adjust upstairs closet doors. One bedroom the doors are too tight needs to be trimmed or somehow adjusted |
Jorge |
|
-- |
-- |
Fan in powder bath doesn’t look right. Missing a part? |
Replace |
|
-- |
-- |
The wall is a little crooked, and the shoe mold doesn’t fit quite right at laundry room dryer vent |
Tom |
|
-- |
-- |
Install window screens |
Jill |
|
-- |
-- |
Fill nail holes in master bathroom, vanity, shoe mold |
Jesus |
|
-- |
-- |
There are gaps in one area of LVT in master bathroom floor. Does this need to be replaced for a better fit? |
Eric |
|
-- |
-- |
Kate to blue tape once cleaned |
|
|
-- |
-- |
Shoe mold to be filled at vanity in hallway bathroom |
Jesus |
|
-- |
-- |
Trim under bump out the window needs to be fixed or corrected |
Davenport |
|
-- |
-- |
Flashing or siding missing under back door to deck |
Tom |
|
-- |
-- |
Whiteboard needed off of rear bottom deck |
Tom |
|
-- |
-- |
various squeaks in carpet upstairs |
Tom/Eric |
|
-- |
-- |
Clean paint off of carpet in bedroom 1 |
Jesus |
|
-- |
-- |
Push down pins on door hinges |
Jill |
|
-- |
-- |
Install fire extinguisher |
Jill - empty - will get another |
|
-- |
-- |
garage- door to interior is cracked |
Jesus |
|
-- |
-- |
reclean floors after punch |
Lynn |
|
-- |
-- |
Paint touch up throughout |
Jesus |
|
-- |
-- |
Finish weatherstripping on garage door |
Jill |
|
-- |
-- |
Remove the gator and pressure washer from this house |
|
|
-- |
-- |
A few spots where buyers noted cleaning needed to be done still has blue tape on it |
Lynn |
|
-- |
-- |
Patch or replace the trim against the master bathroom? |
Jesus |
|
-- |
-- |
Trim and drywall repairs in small bedroom |
Jesus |
|
-- |
-- |
Payment needed for refrigerator |
|
|
-- |
-- |
Side by side still there 5/28 |
|
|
-- |
-- |
Railing on lower back deck |
Premier |
|
-- |
-- |
Ratified Contract? (0) 11.14.2024 |
|
|
|
|
Living Room Ceiling Fan
|
|
|
|
Quartz Level 0
|
|
|
|
Amendment to increase price by $1,260
|
|
-- |
-- |
$2500 Deposit Received (0) 11.22.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 11.16.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.04.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.10.2024 |
12/3: sent to Whit for initials |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.20.2025 |
1/19: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.16.2025 |
$1,000 needed |
|
-- |
-- |
Building Permit (30) 10.07.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 10.17.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.02.2024 |
|
|
-- |
-- |
Stake Out Home (1) 10.14.2024 |
|
|
-- |
-- |
Excavate (2) 10.21.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.21.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.21.2024 |
|
|
-- |
-- |
Pour Footers (1) * 10.21.2024 |
|
|
-- |
-- |
Set Forms (2) 11.13.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.13.2024 |
|
|
-- |
-- |
Plumb Slab (2) 11.13.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 11.24.2024 |
|
|
-- |
-- |
Prepare Slab (1) 11.24.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.02.2024 |
|
|
-- |
-- |
Pour Slab (1) * 12.02.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.22.2025 |
1/20: sent to Brittany |
|
-- |
-- |
Framing I (9) 12.19.2024 |
|
|
-- |
-- |
Order Steps (0) 01.16.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 01.23.2025 |
|
|
-- |
-- |
Framing II (8) 12.28.2024 |
|
|
-- |
-- |
Framing III (8) * 01.13.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 01.16.2025 |
|
|
-- |
-- |
Install Stairs (0) 01.16.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 01.23.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.29.2025 |
|
|
-- |
-- |
Roofing (0) * 02.02.2025 |
|
|
-- |
-- |
Order Cabinets (0) 01.23.2025 |
|
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
Order # 200509354240390393 |
|
-- |
-- |
Deck (0) 03.21.2025 |
In process 3/19 |
|
-- |
-- |
Gutters (0) 03.19.2025 |
|
|
-- |
-- |
Driveway (0) * 04.06.2025 |
|
|
-- |
-- |
Patio (0) 03.21.2025 |
In process 3/19 |
|
-- |
-- |
Privacy Divider / Fence (0) 04.06.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 01.29.2025 |
in process 1/25 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 02.08.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 02.05.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 02.01.2025 |
In process 1/29 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.08.2025 |
|
|
-- |
-- |
Electric Rough In (4) 02.26.2025 |
In process 2/8 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.20.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 02.20.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.16.2025 |
|
|
-- |
-- |
Exterior Stone (0) 04.09.2025 |
|
|
-- |
-- |
Insulation (2) * 02.20.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 02.26.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 02.20.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 04.09.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 02.20.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.20.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 02.20.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 02.26.2025 |
|
|
-- |
-- |
Loan Approval (0) 05.01.2025 |
JoDee @ United Bank (96.5% LTV FHA) |
|
-- |
-- |
Deed Preparation (0) 03.24.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 03.15.2025 |
Final sanding in process 3/12 |
|
-- |
-- |
Paint 1 (1) 03.01.2025 |
|
|
-- |
-- |
Garage Door (0) * 04.09.2025 |
|
|
-- |
-- |
House Numbers (0) 04.27.2025 |
|
|
-- |
-- |
Mailbox (0) 04.16.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 03.12.2025 |
Install Wed, Mar 12 |
|
-- |
-- |
Granite Installation (1) * 03.19.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 03.26.2025 |
In process 3/21 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 03.28.2025 |
In process 3/26 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 04.09.2025 |
In process 4/6 |
|
-- |
-- |
Luxury Vinyl Tile (0) 04.12.2025 |
In process 4/9 |
|
-- |
-- |
Paint 2 (3) 04.12.2025 |
|
|
-- |
-- |
Cover Floors (1) 04.12.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.24.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 04.16.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 04.27.2025 |
Started 4/23 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 05.07.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 03.27.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 04.14.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 04.27.2025 |
In process 4/19. A few outlets need completing in the foyer. |
|
-- |
-- |
Ceiling Fans (0) 04.16.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 04.12.2025 |
|
|
-- |
-- |
Blower Door Test (1) 04.27.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 04.23.2025 |
|
|
-- |
-- |
Install Appliances (0) * 04.27.2025 |
Appliances are on site 4/23. Dishwasher and oven are installed |
|
-- |
-- |
Paint 3 (2) * 04.16.2025 |
|
|
-- |
-- |
Carpet (2) 04.12.2025 |
In process 4/9 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 05.08.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 05.01.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 05.01.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 05.01.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 05.01.2025 |
|
|
-- |
-- |
Pre Walk Through (0) 05.14.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 05.10.2025 |
In process 4/7 |
|
-- |
-- |
Cleaning (1) 05.14.2025 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 05.01.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 05.01.2025 |
|
|
-- |
-- |
Schedule Closing (0) 05.08.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 05.14.2025 |
Tues, May 13 at 8:20 AM |
|
-- |
-- |
Payment for Upgrades (0) 05.01.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 05.05.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 05.22.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 05.17.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 05.08.2025 |
|
|
-- |
-- |
Closing (1) 05.23.2025 |
Brittany @ West View Title, Thu, May 15 |
|
-- |
-- |
Remove Coded Lockbox (0) 05.31.2025 |
|
|