CONGERS-3 - 44  ::  1597 Palomino Trail
[ BUILD: 20241824 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
Damaged front door awning Joel the roofer
Put BLK paint in the front dormer window
Pulls on the far right kitchen cabinet look uneven Fred
Painting will need to patch some drywall here near a few door frames Jesus
Finish drywall and paint in garage
Mid-level left window is broken in the corner On order
Bit of caulking needed in kitchen around quartz countertops Jesus
Garage needs trim
Living room ceiling fan looks crooked
Brown kitchen island receptacles needed Electrician
Few electrical outlets need to be completed in the foyer area Electrician
Patch, small hole in powder bath Jesus
Need attic access cover Jorge
Missing wall and floor registers Mast and Brunk
Fill hole in bathroom wall/garage ceiling Jesus
Strap wires in island Electrician
Disposal not wired Electrician
Mark Furnace Mast and Brunk
Missing covers on switches beside garage side door electrician
Lightbulb needed in garage electrician
Refunding deposit to buyers?
FHA appraiser - verifying completion Needs ladder in closet - Wed, May 7 at 9am
Needs screen doors installed Tom
Weatherstripping needed on exterior doors Jill
CODED LOCKBOX 4444
Paint touch up taking place 5/10 Few spots still needed. Mostly on trim.
Buyer noted metal roof at door to be fixed. Tom/Greg
Clean out garage Jill, Lynn
Clean construction materials out of grass and gravel Jill
Garage door not operating as it should Jill
Receptacle cover needed at light in garage Jesus
Clean off deck Jill
Caulk or clean up corners where Quartz backsplash meets wall Jesus
Hang up fire extinguisher in pantry Tom
Powder room door to be adjusted. Catches just a little. Jorge
Door to closet under stairs on middle level to be adjusted. Too tight. Jorge
Remove yellow covers from smoke detector Jill
Adjust upstairs closet doors. One bedroom the doors are too tight needs to be trimmed or somehow adjusted Jorge
Fan in powder bath doesn’t look right. Missing a part? Replace
The wall is a little crooked, and the shoe mold doesn’t fit quite right at laundry room dryer vent Tom
Install window screens Jill
Fill nail holes in master bathroom, vanity, shoe mold Jesus
There are gaps in one area of LVT in master bathroom floor. Does this need to be replaced for a better fit? Eric
Kate to blue tape once cleaned
Shoe mold to be filled at vanity in hallway bathroom Jesus
Trim under bump out the window needs to be fixed or corrected Davenport
Flashing or siding missing under back door to deck Tom
Whiteboard needed off of rear bottom deck Tom
various squeaks in carpet upstairs Tom/Eric
Clean paint off of carpet in bedroom 1 Jesus
Push down pins on door hinges Jill
Install fire extinguisher Jill - empty - will get another
garage- door to interior is cracked Jesus
reclean floors after punch Lynn
Paint touch up throughout Jesus
Finish weatherstripping on garage door Jill
Remove the gator and pressure washer from this house
A few spots where buyers noted cleaning needed to be done still has blue tape on it Lynn
Patch or replace the trim against the master bathroom? Jesus
Trim and drywall repairs in small bedroom Jesus
Payment needed for refrigerator
Side by side still there 5/28
Railing on lower back deck Premier
UPGRADES - COMPLETED
    Living Room Ceiling Fan  
    Quartz Level 0  
    Amendment to increase price by $1,260  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.14.2024    
-- -- $2500 Deposit Received (0)  11.22.2024    
-- -- Association Packet Requested (0)  06.30.2025    
-- -- Association Packet Received (0)  11.16.2024    
-- -- Selections Meeting (0)  12.04.2024    
-- -- Selections Sheet Signed (0)  12.10.2024     12/3: sent to Whit for initials
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  01.20.2025     1/19: sent to Jerry
-- -- Deposit For Upgrades Received (0)  01.16.2025     $1,000 needed
-- -- Building Permit (30) *   10.07.2024    
-- -- Order Roof & Floor Trusses (1)  10.17.2024    
-- -- Order Windows & Doors (0)  12.02.2024    
-- -- Stake Out Home (1)  10.14.2024    
-- -- Excavate (2)  10.21.2024    
-- -- Inspection (Footers) (1)  10.21.2024    
-- -- Inspection (Concrete Wall) (1)  10.21.2024    
-- -- Pour Footers (1) *   10.21.2024    
-- -- Set Forms (2)  11.13.2024    
-- -- Pour Foundation Walls (1)  11.13.2024    
-- -- Plumb Slab (2)  11.13.2024    
-- -- Inspection (Plumbing Under Slab) (1)  11.24.2024    
-- -- Inspection (Conduit Under Slab) (1)  11.24.2024    
-- -- Prepare Slab (1)  11.24.2024    
-- -- Inspection (Slab) (1)  12.02.2024    
-- -- Inspection (Drain Tile) (0)  12.02.2024    
-- -- Pour Slab (1) *   12.02.2024    
-- -- Settlement Agent Confirmed (0)  01.22.2025     1/20: sent to Brittany
-- -- Framing I (9)  12.19.2024    
-- -- Order Steps (0)  01.16.2025    
-- -- Order Tubs / Showers (0)  01.23.2025    
-- -- Framing II (8)  12.28.2024    
-- -- Framing III (8) *   01.13.2025    
-- -- Verify Window & Roof Structure (0)  01.16.2025    
-- -- Install Stairs (0) *   01.16.2025    
-- -- Windows & Doors (0) *   01.23.2025    
-- -- House Number and Status in Window (0)  01.29.2025    
-- -- Roofing (0) *   02.02.2025    
-- -- Order Cabinets (0)  01.23.2025    
-- -- Order Appliances (0)  02.20.2025     Order # 200509354240390393
-- -- Deck (0)  03.21.2025     In process 3/19
-- -- Gutters (0)  03.19.2025    
-- -- Driveway (0) *   04.06.2025    
-- -- Patio (0)  03.21.2025     In process 3/19
-- -- Privacy Divider / Fence (0) *   04.06.2025    
-- -- Sod / Seed / Landscaping (0)  08.07.2025    
-- -- HVAC Rough In (4)  01.29.2025     in process 1/25
-- -- Rough In Microwave Vent (0)  02.05.2025    
-- -- Plumbing Rough In (4)  02.01.2025     In process 1/29
-- -- Electric Rough In (4)  02.26.2025     In process 2/8
-- -- Inspection (Rough In HVAC) (1)  02.08.2025    
-- -- Inspection (Rough In Plumbing) (1)  02.08.2025    
-- -- Inspection (Rough In Electric) (1)  02.20.2025    
-- -- Inspection (Framing) (1) *   02.20.2025    
-- -- Inspection (Deck Piers) (0)  02.20.2025    
-- -- Exterior Vinyl (0) *   03.16.2025    
-- -- Exterior Stone (0)  04.09.2025    
-- -- Insulation (2) *   02.20.2025    
-- -- Inspection (Insulation) (1)  02.26.2025    
-- -- Inspection (Electric Service) (0)  02.20.2025    
-- -- Set Electric Meter (0) *   04.09.2025    
-- -- Inspection (Main Sewer Line) (0)  02.20.2025    
-- -- Inspection (Main Water Line) (0)  02.20.2025    
-- -- Order Interior Doors & Trim (0)  02.20.2025    
-- -- Drywall (Hang) (4) *   02.26.2025    
-- -- Loan Approval (0)  05.01.2025     JoDee @ United Bank (96.5% LTV FHA)
-- -- Deed Preparation (0)  03.24.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.15.2025     Final sanding in process 3/12
-- -- Paint 1 (1)  03.01.2025    
-- -- Garage Door (0)  04.09.2025    
-- -- House Numbers (0)  04.27.2025    
-- -- Mailbox (0)  04.16.2025    
-- -- Cabinet Installation (2) *   03.12.2025     Install Wed, Mar 12
-- -- Granite Installation (1) *   03.19.2025    
-- -- Interior Trim - Install (3) *   03.26.2025     In process 3/21
-- -- Order Plumbing / Lighting Fixtures (0)  03.24.2025    
-- -- Interior Trim - Paint (1)  03.28.2025     In process 3/26
-- -- Luxury Vinyl Plank (3) *   04.09.2025     In process 4/6
-- -- Luxury Vinyl Tile (0)  04.12.2025     In process 4/9
-- -- Paint 2 (3)  04.12.2025    
-- -- Cover Floors (0)  04.12.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  03.24.2025    
-- -- Shoe Moulding (0)  04.16.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   04.27.2025     Started 4/23
-- -- Install Coded Lockbox (add extra keys) (0)  05.07.2025    
-- -- Pay Water / Sewer Taps (0)  03.27.2025    
-- -- Set Water Meter (1) *   04.14.2025    
-- -- Electric Trim Out (3) *   04.27.2025     In process 4/19. A few outlets need completing in the foyer.
-- -- Ceiling Fans (0)  04.16.2025    
-- -- HVAC Trim Out (1) *   04.12.2025    
-- -- Blower Door Test (1)  04.27.2025    
-- -- Plumbing Trim Out (2) *   04.23.2025    
-- -- Install Appliances (0) *   04.27.2025     Appliances are on site 4/23. Dishwasher and oven are installed
-- -- Paint 3 (2) *   04.16.2025    
-- -- Carpet (2)  04.12.2025     In process 4/9
-- -- Appraiser Confirms Construction Completion (0)  05.08.2025    
-- -- Inspection (Final HVAC) (0)  05.01.2025    
-- -- Inspection (Final Plumbing) (0)  05.01.2025    
-- -- Inspection (Final Electric) (0)  05.01.2025    
-- -- Inspection (Final Building) (4) *   05.01.2025    
-- -- Pre Walk Through (0)  05.14.2025    
-- -- Stain Hardwood Stairs (1) *   05.10.2025     In process 4/7
-- -- Cleaning (1)  05.14.2025    
-- -- Certificate of Occupancy (1) *   05.01.2025    
-- -- C.O. to Lender (0)  05.01.2025    
-- -- Schedule Closing (0)  05.08.2025    
-- -- Buyer Walk Through (1) *   05.14.2025     Tues, May 13 at 8:20 AM
-- -- Payment for Upgrades (0)  05.01.2025    
-- -- Keys to Settlement Agent (0)  05.05.2025    
-- -- Review Settlement Statement (0)  05.22.2025    
-- -- Jerry Signs Closing Documents (0)  05.17.2025    
-- -- Request Trash Tote From POA Manager (0)  05.08.2025    
-- -- Closing (1)  05.23.2025     Brittany @ West View Title, Thu, May 15
-- -- Remove Coded Lockbox (0)  05.31.2025