Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
|
-- |
-- |
Garage floor seems to have a lot of concrete blemishes |
It’s covered 3/12 |
|
-- |
-- |
Set the bonus bathroom bathtub so plumbers can hook it up |
|
|
-- |
-- |
Install another piece of drywall in the foyer area where it’s missing |
|
|
-- |
-- |
There’s also a missing piece of drywall in the basement closet |
|
|
-- |
-- |
Repair garage floor |
|
|
-- |
-- |
Eggshell paint? |
|
|
-- |
-- |
Home Sale Contingency |
Under contract - closing June 12 |
|
-- |
-- |
Remove extra vanities from garage |
Jill |
|
-- |
-- |
Missing cabinet pull in kitchen island |
Fred |
|
-- |
-- |
White window frames need holes patched |
Davenport |
|
-- |
-- |
Front porch awning is crooked |
Framers |
|
-- |
-- |
There is a piece of wood that is sticking out under the farmhouse sink. Can that be adjusted so it’s not showing. |
Shim |
|
-- |
-- |
Interior trim needed in garage |
Jorge |
|
-- |
-- |
Finish bonus room closet, sanding |
Drywaller |
|
-- |
-- |
Side-by-side is in this kitchen as well |
Wrong refrigerator |
|
-- |
-- |
Paint bonus closet |
Jesus |
|
-- |
-- |
Correct fridge in garage |
|
|
-- |
-- |
Light cover by front door needs installed |
Electrician |
|
-- |
-- |
This garage door does not close by itself when cracked open |
Self closing hinges - Jorge |
|
-- |
-- |
Vanity light in master needs a bulb to be completed |
Electrician |
|
-- |
-- |
Trim needed in bonus closet |
|
|
-- |
-- |
Home inspection - Sunday, June 8 at 11AM |
|
|
-- |
-- |
Would like to close Friday, June 13 |
|
|
-- |
-- |
replace black aluminum from porch repair |
Jeremy |
|
-- |
-- |
Complete bonus bath vanity light |
Electrician |
|
-- |
-- |
Some flooring boards in front of basement closet have gaps |
Denny |
|
-- |
-- |
Sand banister |
Jesus |
|
-- |
-- |
Caulk and paint closet baseboards |
Jesus |
|
-- |
-- |
Paint front door |
Jesus |
|
-- |
-- |
CODED LOCKBOX 2525 |
|
|
-- |
-- |
Backfill at erosion under stairs from deck |
Tom - week of Jun 16, when we do landscaping |
|
-- |
-- |
Install screens |
Jill |
|
-- |
-- |
Repair or replace aluminum fascia on front porch with gaps |
Jeremy |
|
-- |
-- |
Splash blocks |
Tom |
|
-- |
-- |
Sand rough edges on interior handrails |
|
|
-- |
-- |
Are kitchen receptacles to right of stove GFCI protected? |
Tom |
|
-- |
-- |
Pantry pocket door rubs |
Jorge |
|
-- |
-- |
Tray ceiling drywall repair |
Jesus |
|
-- |
-- |
Nail pop above outside of bedroom door |
Jesus |
|
-- |
-- |
Shelf missing in main level closet? |
|
|
-- |
-- |
Missing light bulbs in dining area light |
Jill |
|
-- |
-- |
Door to mechanical room sticks |
Jorge |
|
-- |
-- |
Install bonus room closet shelf |
Paul |
|
-- |
-- |
Coffee and paint she molded in dining room from flooring repair |
|
|
-- |
-- |
Repair drywall HVAC closet |
Tom |
|
-- |
-- |
Repair mech room door |
|
|
-- |
-- |
Repair pantry door |
Jorge |
|
-- |
-- |
Garage spring loaded hinges |
|
|
-- |
-- |
Front awning FOX AGAIN |
|
|
-- |
-- |
Replace window screen LR right |
Jill - living room |
|
-- |
-- |
Add plastic pieces to top of wi does- |
|
|
-- |
-- |
Caulk where trim meets wall at cabinet pantry |
Jesus |
|
-- |
-- |
Scores nail holes at transition stop at top of stairs |
|
|
-- |
-- |
Paint touch up throughout |
Jesus |
|
-- |
-- |
Final clean surfaces |
Lynn |
|
-- |
-- |
Add fill at stair ost and grade yard |
|
|
-- |
-- |
Fill nail holes kitchen shop perimeter cabinets |
Jesus - shoe molding |
|
-- |
-- |
Moving items in over weekend and rekeying house on Tuesday 17th |
|
|
-- |
-- |
Caulk and paint shoe moulding in dining room |
Jesus |
|
-- |
-- |
Fix front awning again |
Davenport |
|
-- |
-- |
Missing window pieces at top inside of windows |
Living room (R), Master Bathroom, etc. |
|
-- |
-- |
Screw in screws and fill holes at top of hardwood steps |
Jesus |
|
-- |
-- |
Pantry touch up |
Jesus |
|
-- |
-- |
One paint touch up on wall |
Jesus |
|
-- |
-- |
Take out one chain link in dining chandelier |
Electrician |
|
-- |
-- |
Pressure washing |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
Ratified Contract? (0) 01.12.2025 |
|
|
|
|
Finished Bonus Room
|
|
|
|
Finished Bonus Bathroom
|
|
|
|
Painted Kitchen Cabinets
|
|
|
|
Level II Granite- Fantasy Brown
|
|
|
|
Farmhouse Sink- white
|
|
|
|
Cabinet Crown Moulding
|
|
|
|
3 drawer base in place of B 18
|
|
|
|
3 drawer base in place of B 36"
|
|
|
|
French Style Refrigerator
|
|
|
|
24" painted vanity with cultured marble in powder bath
|
|
|
|
LVP in upstairs hallway, Bedrooms and closets
|
|
|
|
LVP in Bonus Room
|
|
|
|
Stained Hardwood Treads to Bedroom Level
|
|
|
|
Upgraded LVT in Master Bath only
|
|
|
|
Eggshell Paint
|
|
|
|
Expanded Driveway
|
|
|
|
2 additional ceiling fans in Bonus and LR
|
|
|
|
Garage Door Opener Keypad
|
|
|
|
Stairs with handrail from upper deck to yard
|
|
|
|
Amendment to increase price by $30,885
|
|
-- |
-- |
$2500 Deposit Received (0) 01.15.2025 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 01.17.2025 |
|
|
-- |
-- |
Selections Meeting (0) 02.04.2025 |
|
|
-- |
-- |
Selections Sheet Signed (0) 03.27.2025 |
2/26: sent to Matt |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.07.2025 |
3/27: sent to Matt |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.03.2025 |
|
|
-- |
-- |
Building Permit (30) 11.21.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 12.30.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.30.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.02.2024 |
|
|
-- |
-- |
Excavate (2) 12.02.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.02.2024 |
|
|
-- |
-- |
Pour Footers (1) * 12.02.2024 |
|
|
-- |
-- |
Set Forms (2) 12.19.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.19.2024 |
|
|
-- |
-- |
Plumb Slab (2) 12.19.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Prepare Slab (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.20.2025 |
|
|
-- |
-- |
Pour Slab (1) * 12.28.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.11.2025 |
4/6: sent to Brittany; |
|
-- |
-- |
Framing I (9) 01.13.2025 |
|
|
-- |
-- |
Order Steps (0) 02.27.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.27.2025 |
|
|
-- |
-- |
Framing II (8) 02.02.2025 |
|
|
-- |
-- |
Framing III (8) * 02.27.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 03.03.2025 |
|
|
-- |
-- |
Install Stairs (0) 03.08.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 03.08.2025 |
N process 3/5 |
|
-- |
-- |
House Number and Status in Window (0) 03.09.2025 |
|
|
-- |
-- |
Roofing (0) * 03.13.2025 |
|
|
-- |
-- |
Order Cabinets (0) 02.26.2025 |
Ordered 2/25 |
|
-- |
-- |
Order Appliances (0) 02.20.2025 |
200509364240380441 |
|
-- |
-- |
Deck (0) 04.12.2025 |
8 x 12 with steps to yard |
|
-- |
-- |
Gutters (0) 05.07.2025 |
|
|
-- |
-- |
Driveway (0) * 05.21.2025 |
Expanded |
|
-- |
-- |
Patio (0) 04.21.2025 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 05.19.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 03.15.2025 |
In process 3/12 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.26.2025 |
Monday or Tuesday week of March 24 |
|
-- |
-- |
Rough In Microwave Vent (0) 03.15.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.19.2025 |
In process 3/15 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 03.26.2025 |
|
|
-- |
-- |
Electric Rough In (4) 03.21.2025 |
In process 3/19 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 03.26.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 05.12.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 03.26.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 05.07.2025 |
in process 4/19 |
|
-- |
-- |
Exterior Stone (0) 05.05.2025 |
|
|
-- |
-- |
Insulation (2) * 03.26.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 03.31.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 04.14.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 05.10.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.14.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 04.06.2025 |
Stocked 3/28 |
|
-- |
-- |
Loan Approval (0) 06.19.2025 |
JoDee @ United (90% Conventional) |
|
-- |
-- |
Deed Preparation (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.19.2025 |
In process. Sanding 4/16 |
|
-- |
-- |
Paint 1 (1) 04.19.2025 |
|
|
-- |
-- |
Garage Door (0) * 05.07.2025 |
|
|
-- |
-- |
House Numbers (0) 05.27.2025 |
|
|
-- |
-- |
Mailbox (0) 06.12.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.23.2025 |
Wed, Apr 23 |
|
-- |
-- |
Granite Installation (1) * 05.10.2025 |
5/1 |
|
-- |
-- |
Interior Trim - Install (3) * 04.26.2025 |
In process 4/23 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 04.14.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 05.02.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.07.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 05.10.2025 |
In process 5/7 |
|
-- |
-- |
Paint 2 (3) 05.07.2025 |
|
|
-- |
-- |
Cover Floors (1) 06.05.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.21.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 05.17.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 06.04.2025 |
Started 5/28 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.08.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.12.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 05.22.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 06.04.2025 |
Kitchen pendant lights needed and some bulbs 5/24. And smaller bedrooms need lights. |
|
-- |
-- |
Ceiling Fans (0) 05.21.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 05.17.2025 |
|
|
-- |
-- |
Blower Door Test (1) 06.02.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 06.04.2025 |
In process 5/17. Primary shower needs to be trimmed out. Everything else is completed |
|
-- |
-- |
Install Appliances (0) * 06.07.2025 |
Fridge needs installed 5/24 |
|
-- |
-- |
Paint 3 (2) * 05.14.2025 |
|
|
-- |
-- |
Carpet (2) 05.09.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.12.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 06.06.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 06.06.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 06.06.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.06.2025 |
6/5 |
|
-- |
-- |
Pre Walk Through (0) 06.09.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.07.2025 |
In process 6/4- by Friday 6/6 |
|
-- |
-- |
Cleaning (1) 06.11.2025 |
Jill cleaning |
|
-- |
-- |
Certificate of Occupancy (1) * 06.10.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 06.12.2025 |
|
|
-- |
-- |
Schedule Closing (0) 06.12.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.12.2025 |
scheduling for Tuesday, June 10th |
|
-- |
-- |
Payment for Upgrades (0) 06.09.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.09.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.12.2025 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.13.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.04.2025 |
|
|
-- |
-- |
Closing (1) 06.15.2025 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 06.18.2025 |
|
|