| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bathroom | ||||
| Painted Kitchen Cabinets | ||||
| Level II Granite- Fantasy Brown | ||||
| Farmhouse Sink- white | ||||
| Cabinet Crown Moulding | ||||
| 3 drawer base in place of B 18 | ||||
| 3 drawer base in place of B 36" | ||||
| French Style Refrigerator | ||||
| 24" painted vanity with cultured marble in powder bath | ||||
| LVP in upstairs hallway, Bedrooms and closets | ||||
| LVP in Bonus Room | ||||
| Stained Hardwood Treads to Bedroom Level | ||||
| Upgraded LVT in Master Bath only | ||||
| Eggshell Paint | ||||
| Expanded Driveway | ||||
| 2 additional ceiling fans in Bonus and LR | ||||
| Garage Door Opener Keypad | ||||
| Stairs with handrail from upper deck to yard | ||||
| Amendment to increase price by $30,885 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.02.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.02.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 02.20.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.26.2025 | Monday or Tuesday week of March 24 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 03.26.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.26.2025 | ||
| -- | -- | Inspection (Framing) (1) * 03.26.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.12.2025 | ||
| -- | -- | Inspection (Insulation) (1) 03.31.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 06.06.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 06.06.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 06.06.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 06.06.2025 | 6/5 | |