Tue    Jul 1      Sod / Seed / Landscaping (0)      
--   --   Concrete floors have multiple blemishes 3/5. Specifically garage
--   --   Higher location for coffee station receptacle Kate to respond to buyer
--   --   Duct for microwave exhaust ends lower than necessary? Kate to respond to buyer
--   --   Unsightly meter box next to front door :-) Kate to respond to buyer
--   --   When is low voltage box installed under stairs? Kate to respond to buyer
--   --   Where will the water meter be located? Kate to respond to buyer
--   --   I do not see an elevated wall outlet anywhere? Is it supposed to be above a future kitchen coffee cabinet?
--   --   There are two three sets of drawers in kitchen cabinets
--   --   Missing handle 7nder kitchen sink Under - Fred
--   --   Hall and bonus cabinets are not white ready for pick up at Lowes
--   --   Finish patching drywall near foyer space
--   --   Can conduits going into electric meter be parallel? Buyer request
--   --   Granite needs to have the side piece that goes against the wood be beside the refrigerator
--   --   Hall and bonus cabinets - waiting Just need countertops
--   --   Finish the bonus room closet drywall Drywaller
--   --   Plastic piece needed for front faucet Munzur
--   --   Is the kitchen sink faucet supposed to be farmhouse style?
--   --   Cover carpet
--   --   Farmhouse plumbing has not been installed. Munzur
--   --   Bonus room needs carpet. I’m assuming they need light fixtures installed first. Denny
--   --   Dori going into the closet in the foyer, does not open Jorge. It opens , but now it doesn’t close.
--   --   Install doors so knobs can be installed. Maybe they need to be cu down? Jorge
--   --   Hall bath popped lights and not working now Electrician
--   --   Garage floor needs trim Jorge
--   --   Trim doors in bonus room that won’t open due to carpet installation Jorge
--   --   Repair the fan in the bonus room so that it functions properly. Electrician
--   --   Basement closet needs trim inside of door. Jorge
--   --   Door knob needed to utility room. Paul
--   --   Shelving needs finished in master closet Paul
--   --   Which plate cover needed on side of kitchen island Brown - Jill
--   --   Light switch cover needed by front door Jesus
--   --   Sand, bonus room, closet, and install shelving Drywaller
--   --   Side-by-side refrigerator is in kitchen wrong refrigerator
--   --   Remove shower rod as door needs to be installed Paul
--   --   Cabinets are sitting in living room. Need to be installed.
--   --   Pretty large scratch on the back panel of the kitchen island Jill
--   --   LOCKBOX 2626
--   --   Finish weatherstripping on garage interior door Jill
--   --   Install shelving in bonus room closet getting done 6/2
--   --   Install light fixture and bathroom fan in bonus bathroom Mast & Brunk
--   --   Trim needs painting on exterior patio door Jesus
--   --   Microwave vent does not function Tom
--   --   Cable covers needed in all units Tom
--   --   Install shoe mold in bathrooms, still awaiting vanities to be installed Jorge
--   --   Install side splash and handles on cabinets Tom
--   --   Bonus bath needs mirror Paul
--   --   Thermostat is here but not on Tom
--   --   Final paint needed Jesus
--   --   Where are the vanity handles? Jill will put on before walkthrough
--   --   Fridge stair scratches - will coat of poly cover
--   --   Caulk in side vanity pieces
--   --   Add PVC/Vinyl below patio door Tom
--   --   Awning Roof Line Davenport
--   --   Adjust door lock to patio Paul/Joe
--   --   Microwave vent flap not lifting
--   --   Need pieces for the side of the farm sink Fred has ordered it
--   --   Adjust lower cabinet door hinge so it does not hit wall under kitchen window Hinge restrictor clip - Fred
--   --   epaint front door
--   --   Nail pop above powwder vantiy Painter
--   --   Several windows hard to open - please check all This is normal.
--   --   Bathrooms- switch knobs to bar pulls- bonus and hall Tom
--   --   Adjust 1upper bedroom door- locks you inside Paul/Joe
--   --   Remove pencil mark in LVP on floor of powder Jill
--   --   Sweep off patio Jill
--   --   Several island scratches and nail pops Jill
--   --   several cabient door scratches Jill
--   --   double check insulation in HVAC closet
--   --   HVAC closet- drywall only half done not adding drywall - Kate will email
--   --   Adjust door stop on Bonus Room door Paul/joe
--   --   Add door stop to bonus bath Paul/Joe
--   --   Paint touchup Jesus
--   --   Front door handle lock Paul
--   --   Clean concrete back patio
--   --   Irene or Victor, 804-314-7253
-- -- Ratified Contract? (0)  12.13.2024    
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Level 2 Granite  
    Three Drawer Stacks in B 36" and B18"  
    Expanded Driveway  
    Oak Stairs to Bedroom Level  
    LVP in upstairs hallway  
    Upgraded Gardenia LVT in Master, Hall and Bonus Baths  
    Farmhouse sink  
    Elevated Wall Outlet - fee for custom request and management charge  
    Upgraded French Model Fridge  
    Added Fan in Bonus Room and Living Room  
    Farmhouse plumbing package  
    Upgraded carpet pad in bonus and upstairs bedrooms  
    Microwave vent to exterior  
    Expanded patio 10x18  
    Digital deadbolt  
    Shower door master bath  
    White Painted cabinetry in Hall Bath and Bonus Bath  
    Amendment to increase price by $28,720  
-- -- $2500 Deposit Received (0)  12.19.2024    
-- -- Association Packet Requested (0)  06.30.2025    
-- -- Association Packet Received (0)  12.14.2024    
-- -- Selections Meeting (0)  01.28.2025     1 PM Friday 1/17
-- -- Selections Sheet Signed (0)  02.12.2025     2/10: sent to Mattias
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  03.05.2025     3/4: sent to Jerry
-- -- Deposit For Upgrades Received (0)  03.04.2025    
-- -- Building Permit (30)  11.21.2024    
-- -- Order Roof & Floor Trusses (1)  12.30.2024    
-- -- Order Windows & Doors (0)  12.30.2024    
-- -- Stake Out Home (1)  12.02.2024    
-- -- Excavate (2)  12.02.2024    
-- -- Inspection (Footers) (1)  12.02.2024    
-- -- Inspection (Concrete Wall) (1)  12.02.2024    
-- -- Pour Footers (1) *   12.02.2024    
-- -- Set Forms (2)  12.19.2024    
-- -- Pour Foundation Walls (1)  12.19.2024    
-- -- Plumb Slab (2)  12.19.2024    
-- -- Inspection (Plumbing Under Slab) (1)  12.28.2024    
-- -- Inspection (Conduit Under Slab) (1)  12.28.2024    
-- -- Prepare Slab (1)  12.28.2024    
-- -- Inspection (Slab) (1)  12.28.2024    
-- -- Inspection (Drain Tile) (0)  02.20.2025    
-- -- Pour Slab (1) *   12.28.2024    
-- -- Settlement Agent Confirmed (0)  03.11.2025     3/5: sent to Brittany
-- -- Framing I (9)  01.13.2025    
-- -- Order Steps (0)  02.27.2025    
-- -- Order Tubs / Showers (0)  02.27.2025    
-- -- Framing II (8)  02.02.2025    
-- -- Framing III (8) *   02.27.2025    
-- -- Verify Window & Roof Structure (0)  03.03.2025    
-- -- Install Stairs (0)  03.12.2025    
-- -- Windows & Doors (0) *   03.08.2025    
-- -- House Number and Status in Window (0)  03.09.2025    
-- -- Roofing (0) *   03.13.2025    
-- -- Order Cabinets (0)  02.26.2025     Ordered 2/25
-- -- Order Appliances (0)  04.14.2025    
-- -- Deck (0)  04.06.2025    
-- -- Gutters (0)  05.07.2025    
-- -- Driveway (0) *   05.07.2025     Expanded
-- -- Patio (0)  04.14.2025    
-- -- Privacy Divider / Fence (0)  05.17.2025    
-- -- HVAC Rough In (4)  03.12.2025     In process 3/5
-- -- Inspection (Rough In HVAC) (1)  03.24.2025     Friday, March 21
-- -- Rough In Microwave Vent (0)  03.08.2025    
-- -- Plumbing Rough In (4)  03.15.2025     Almost complete 3/12
-- -- Inspection (Rough In Plumbing) (1)  03.24.2025    
-- -- Electric Rough In (4)  03.19.2025    
-- -- Inspection (Rough In Electric) (1)  03.24.2025    
-- -- Inspection (Deck Piers) (0)  05.12.2025    
-- -- Inspection (Framing) (1) *   03.24.2025    
-- -- Exterior Vinyl (0) *   04.19.2025    
-- -- Exterior Stone (0)  05.05.2025    
-- -- Insulation (2) *   03.24.2025    
-- -- Inspection (Insulation) (1)  03.26.2025    
-- -- Inspection (Electric Service) (0)  04.14.2025    
-- -- Set Electric Meter (0) *   05.12.2025    
-- -- Inspection (Main Sewer Line) (0)  04.14.2025    
-- -- Inspection (Main Water Line) (0)  04.14.2025    
-- -- Order Interior Doors & Trim (0)  04.12.2025    
-- -- Drywall (Hang) (4) *   03.28.2025     In process 3/26
-- -- Loan Approval (0)  04.03.2025     Cash
-- -- Deed Preparation (0)  05.05.2025    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   04.12.2025     In process 4/9. Sanding.
-- -- Paint 1 (1)  04.12.2025    
-- -- Garage Door (0) *   05.10.2025    
-- -- House Numbers (0)  05.24.2025    
-- -- Mailbox (0)  06.12.2025    
-- -- Cabinet Installation (2) *   04.12.2025     Apr 9
-- -- Granite Installation (1) *   05.02.2025    
-- -- Interior Trim - Install (3) *   04.19.2025     In process 4/16
-- -- Order Plumbing / Lighting Fixtures (0)  04.14.2025    
-- -- Interior Trim - Paint (1)  04.23.2025     Prepping to paint 4/19
-- -- Luxury Vinyl Plank (3) *   05.02.2025     In process 4/30
-- -- Luxury Vinyl Tile (0)  05.02.2025    
-- -- Paint 2 (3)  05.02.2025     In process 4/30
-- -- Cover Floors (1)  05.21.2025    
-- -- Deliver Plumbing / Lighting Fixtures (0)  04.21.2025    
-- -- Shoe Moulding (0)  05.10.2025    
-- -- Shelving, Door Knobs, Fire Extinguisher (0) *   05.28.2025     Bonus bathroom mirror needs to be hung
-- -- Install Coded Lockbox (add extra keys) (0)  05.21.2025    
-- -- Pay Water / Sewer Taps (0)  05.12.2025    
-- -- Set Water Meter (0) *   05.22.2025    
-- -- Electric Trim Out (3)  05.17.2025     In process 5/14. Just needs bonus and installed and lights above bonus bathroom vanity.
-- -- Ceiling Fans (0)  05.14.2025    
-- -- HVAC Trim Out (1)  05.17.2025    
-- -- Blower Door Test (1)  05.29.2025    
-- -- Plumbing Trim Out (2)  05.28.2025     Plumbing fixtures need installed on new vanities that will be installed
-- -- Install Appliances (0) *   05.31.2025     Fridge needs installed 5/24
-- -- Paint 3 (2) *   05.14.2025    
-- -- Carpet (2)  05.10.2025    
-- -- Appraiser Confirms Construction Completion (0)  06.04.2025    
-- -- Inspection (Final HVAC) (1)  06.04.2025    
-- -- Inspection (Final Plumbing) (1)  06.04.2025    
-- -- Inspection (Final Electric) (1)  06.04.2025    
-- -- Inspection (Final Building) (2) *   06.04.2025    
-- -- Pre Walk Through (0)  06.02.2025    
-- -- Stain Hardwood Stairs (1)  05.31.2025     In process 5/28
-- -- Cleaning (1)  05.31.2025    
-- -- Certificate of Occupancy (1) *   06.04.2025    
-- -- C.O. to Lender (0)  06.04.2025    
-- -- Schedule Closing (0)  06.06.2025     potentially 6/5
-- -- Buyer Walk Through (1)  06.04.2025     3:30pm 6/2
-- -- Payment for Upgrades (0)  06.04.2025    
-- -- Keys to Settlement Agent (0)  06.05.2025    
-- -- Review Settlement Statement (0)  06.06.2025    
-- -- Jerry Signs Closing Documents (0)  06.06.2025    
-- -- Request Trash Tote From POA Manager (0)  06.04.2025    
-- -- Closing (1)  06.06.2025     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  06.12.2025