| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bathroom | ||||
| Level 2 Granite | ||||
| Three Drawer Stacks in B 36" and B18" | ||||
| Expanded Driveway | ||||
| Oak Stairs to Bedroom Level | ||||
| LVP in upstairs hallway | ||||
| Upgraded Gardenia LVT in Master, Hall and Bonus Baths | ||||
| Farmhouse sink | ||||
| Elevated Wall Outlet - fee for custom request and management charge | ||||
| Upgraded French Model Fridge | ||||
| Added Fan in Bonus Room and Living Room | ||||
| Farmhouse plumbing package | ||||
| Upgraded carpet pad in bonus and upstairs bedrooms | ||||
| Microwave vent to exterior | ||||
| Expanded patio 10x18 | ||||
| Digital deadbolt | ||||
| Shower door master bath | ||||
| White Painted cabinetry in Hall Bath and Bonus Bath | ||||
| Amendment to increase price by $28,720 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.02.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.02.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 02.20.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.24.2025 | Friday, March 21 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 03.24.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.24.2025 | ||
| -- | -- | Inspection (Framing) (1) * 03.24.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.12.2025 | ||
| -- | -- | Inspection (Insulation) (1) 03.26.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 06.04.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 06.04.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 06.04.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 06.04.2025 | ||