000 40 37 20 13 32 31 30 29 28 12 11 10 9 5 6 7 8 1 2 3 4 ADDR
CONGERS-3 - 26  ::  1445 Derby Drive
[ BUILD: 20242223 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bathroom  
    Level 2 Granite  
    Three Drawer Stacks in B 36" and B18"  
    Expanded Driveway  
    Oak Stairs to Bedroom Level  
    LVP in upstairs hallway  
    Upgraded Gardenia LVT in Master, Hall and Bonus Baths  
    Farmhouse sink  
    Elevated Wall Outlet - fee for custom request and management charge  
    Upgraded French Model Fridge  
    Added Fan in Bonus Room and Living Room  
    Farmhouse plumbing package  
    Upgraded carpet pad in bonus and upstairs bedrooms  
    Microwave vent to exterior  
    Expanded patio 10x18  
    Digital deadbolt  
    Shower door master bath  
    White Painted cabinetry in Hall Bath and Bonus Bath  
    Amendment to increase price by $28,720  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  12.02.2024    
-- -- Inspection (Concrete Wall) (1)  12.02.2024    
-- -- Inspection (Plumbing Under Slab) (1)  12.28.2024    
-- -- Inspection (Conduit Under Slab) (1)  12.28.2024    
-- -- Inspection (Slab) (1)  12.28.2024    
-- -- Inspection (Drain Tile) (0)  02.20.2025    
-- -- Inspection (Rough In HVAC) (1)  03.24.2025     Friday, March 21
-- -- Inspection (Rough In Plumbing) (1)  03.24.2025    
-- -- Inspection (Rough In Electric) (1)  03.24.2025    
-- -- Inspection (Framing) (1) *   03.24.2025    
-- -- Inspection (Deck Piers) (0)  05.12.2025    
-- -- Inspection (Insulation) (1)  03.26.2025    
-- -- Inspection (Electric Service) (0)  04.14.2025    
-- -- Inspection (Main Sewer Line) (0)  04.14.2025    
-- -- Inspection (Main Water Line) (0)  04.14.2025    
-- -- Inspection (Final HVAC) (0)  06.04.2025    
-- -- Inspection (Final Plumbing) (0)  06.04.2025    
-- -- Inspection (Final Electric) (0)  06.04.2025    
-- -- Inspection (Final Building) (4) *   06.04.2025