Paint exterior concrete once sod is in place |
Jesus |
|
Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
Tue |
Jul 1 |
Loan Approval (0) 06.03.2025 |
USDA |
|
Tue |
Jul 1 |
Schedule Closing (0) |
|
|
Tue |
Jul 1 |
Jerry Signs Closing Documents (0) |
|
|
Tue |
Jul 1 |
Closing (1) |
|
|
Wed |
Jul 2 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
The finished basement closet seems to be facing a different direction? |
|
|
-- |
-- |
Extra set of hardwood treads in the garage |
|
|
-- |
-- |
Bonus closet doors are odd |
|
|
-- |
-- |
Remove master sink counter |
Jill |
|
-- |
-- |
Install master shower door walls |
Munzur is doing later this week |
|
-- |
-- |
Patch screw holes on outside white trim on exterior of home |
Around upper level windows |
|
-- |
-- |
Garage is missing trim. Garage door. |
|
|
-- |
-- |
Sand drywall in basement closet |
Drywaller |
|
-- |
-- |
Wrong refrigerator is in kitchen |
|
|
-- |
-- |
The vanity lights in the master bathroom do not turn off |
Electrician |
|
-- |
-- |
Weather stripping for garage door |
Davenport |
|
-- |
-- |
MOVE SIDE X SIDE FRIDGE TO 24 ( Lowes can move it on Monday when they deliver |
Side by side in kitchen 5/21 |
|
-- |
-- |
These powder bath pans are located in the middle of the powder bathroom, and you are less likely to see the raw edges of the drywall |
|
|
-- |
-- |
Hall bathtub repair will be needed |
coming today 6/2 |
|
-- |
-- |
|
|
|
-- |
-- |
Finish caulking in the shower panels |
Jesus |
|
-- |
-- |
Remove siding from garage |
Davenport |
|
-- |
-- |
CODED LOCKBOX 2727 |
|
|
-- |
-- |
Needs rear whiteboard on patio |
Tom |
|
-- |
-- |
Remove sink from master bedroom |
Tom |
|
-- |
-- |
Fan in bonus bathroom does not turn on |
Benefield |
|
-- |
-- |
Install shelf in bonus closet |
Paul |
|
-- |
-- |
Final paint touch up needed |
Jesus. In process 5/31 |
|
-- |
-- |
Potential blemishes on steps from fridge moving |
|
|
-- |
-- |
Caulk side splashes in |
|
|
-- |
-- |
Adjust closet doors |
Jill will ask George |
|
-- |
-- |
Few paint touchups on foyer ceiling still need to be completed |
|
|
-- |
-- |
Top of stairs, ceiling needs touchup |
|
|
-- |
-- |
Paint repair needed at the top of the pendant light |
Jesus |
|
-- |
-- |
Nail pop and kitchen hallway |
|
|
-- |
-- |
Master ceiling may need paint touch |
|
|
-- |
-- |
Clean out the garage |
Jill |
|
-- |
-- |
Install screens |
Jill |
|
-- |
-- |
A few of these steps have discoloration on the edge? Anything we can do about that? |
Jesus |
|
-- |
-- |
Some of the black stairs have white paint on them |
|
|
-- |
-- |
I’m assuming the black stairs get another coat? Is this right? Please patch holes in wood as well. |
Jesus |
|
-- |
-- |
House is definitely going to need to be swept before closing |
Lynn |
|
-- |
-- |
Jesus needs to fill the holes in the black set of steps. It looks like he repainted, but didn’t patch those. |
Jesus |
|
-- |
-- |
Paint touchup from walk-through needed |
Jesus |
|
-- |
-- |
Touchup clean needed before buyers move in |
|
|
-- |
-- |
Cabinet touchup needed in kitchen |
Jill |
|
-- |
-- |
Ratified Contract? (0) 12.26.2024 |
|
|
|
|
Finished Bonus Room
|
|
|
|
Finished Bonus Bath
|
|
|
|
White Kitchen Cabinetry
|
|
|
|
Upgraded French Model Fridge
|
|
|
|
Level 3 Quartz Countertops
|
|
|
|
Double Waste Basket in Island
|
|
|
|
Spice Rack in B9"
|
|
|
|
LVP in Bonus Room
|
|
|
|
LVP in Upstairs
|
|
|
|
Subway tile shower walls WHITE
|
|
|
|
Shower Door with Black Trim
|
|
|
|
Expanded Driveway
|
|
|
|
Upgraded Gardenia LVT
|
|
|
|
White cabinets in Bathrooms (and bonus)
|
|
|
|
Eggshell Paint
|
|
|
|
Painted Pine Grade Steps to Bedroom Level (black)
|
|
|
|
Quartz Level 3 in Master Bath tops ONLY
|
|
|
|
Expanded 10x18 patio
|
|
|
|
Amendment to increase price by $37,005
|
|
-- |
-- |
$2500 Deposit Received (0) 12.26.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 12.26.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.26.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.07.2025 |
12/26: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.08.2025 |
1/7: sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.06.2025 |
Need this ASAP |
|
-- |
-- |
Building Permit (30) 11.22.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 12.30.2024 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.30.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.02.2024 |
|
|
-- |
-- |
Excavate (2) 12.02.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.02.2024 |
|
|
-- |
-- |
Pour Footers (1) * 12.02.2024 |
|
|
-- |
-- |
Set Forms (2) 12.19.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.19.2024 |
|
|
-- |
-- |
Plumb Slab (2) 12.19.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Prepare Slab (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.28.2024 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.20.2025 |
|
|
-- |
-- |
Pour Slab (1) * 12.28.2024 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.14.2025 |
1/8: sent to Brittany |
|
-- |
-- |
Framing I (9) 01.13.2025 |
|
|
-- |
-- |
Order Steps (0) 02.27.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.27.2025 |
|
|
-- |
-- |
Framing II (8) 02.02.2025 |
|
|
-- |
-- |
Framing III (8) * 02.27.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 03.03.2025 |
|
|
-- |
-- |
Install Stairs (0) 03.08.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 03.08.2025 |
In process 3/5 |
|
-- |
-- |
House Number and Status in Window (0) 03.09.2025 |
|
|
-- |
-- |
Roofing (0) * 03.13.2025 |
|
|
-- |
-- |
Order Cabinets (0) 02.26.2025 |
Ordered 2/25 |
|
-- |
-- |
Order Appliances (0) 04.14.2025 |
|
|
-- |
-- |
Deck (0) 04.06.2025 |
|
|
-- |
-- |
Gutters (0) 05.07.2025 |
|
|
-- |
-- |
Driveway (0) * 05.07.2025 |
Expanded |
|
-- |
-- |
Patio (0) 04.09.2025 |
Expanded 10 x 18 |
|
-- |
-- |
Privacy Divider / Fence (0) 05.07.2025 |
|
|
-- |
-- |
HVAC Rough In (4) 03.15.2025 |
In process 3/5 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.19.2025 |
scheduled for 3/18 |
|
-- |
-- |
Rough In Microwave Vent (0) 03.08.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.08.2025 |
In process 3/5 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 03.19.2025 |
|
|
-- |
-- |
Electric Rough In (4) 03.15.2025 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 03.19.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 05.12.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 03.19.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.26.2025 |
In garage 4/12 |
|
-- |
-- |
Exterior Stone (0) 05.01.2025 |
|
|
-- |
-- |
Insulation (2) * 03.19.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 03.24.2025 |
Friday, March 21 |
|
-- |
-- |
Inspection (Electric Service) (0) 04.14.2025 |
|
|
-- |
-- |
Set Electric Meter (0) * 05.10.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 04.14.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 03.26.2025 |
|
|
-- |
-- |
Deed Preparation (0) 04.14.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.06.2025 |
In process 3/28 |
|
-- |
-- |
Paint 1 (1) 04.06.2025 |
|
|
-- |
-- |
Garage Door (0) * 04.06.2025 |
|
|
-- |
-- |
House Numbers (0) 05.24.2025 |
|
|
-- |
-- |
Mailbox (0) 06.12.2025 |
arriving June 9 |
|
-- |
-- |
Cabinet Installation (2) * 04.09.2025 |
Apr 9 |
|
-- |
-- |
Granite Installation (1) * 04.16.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 04.12.2025 |
In process 4/9 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 04.14.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 04.16.2025 |
Preparing to paint 4/12 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 04.30.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 04.26.2025 |
|
|
-- |
-- |
Paint 2 (3) 04.26.2025 |
In process 4/23 |
|
-- |
-- |
Cover Floors (1) 05.24.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.21.2025 |
|
|
-- |
-- |
Shoe Moulding (0) 05.07.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 05.28.2025 |
In process 5/14. shelving hung in closet, and mirror needed in bonus bathroom. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 05.21.2025 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.12.2025 |
|
|
-- |
-- |
Set Water Meter (0) * 05.22.2025 |
|
|
-- |
-- |
Electric Trim Out (3) 05.10.2025 |
In process 5/7 |
|
-- |
-- |
Ceiling Fans (0) 05.10.2025 |
|
|
-- |
-- |
HVAC Trim Out (1) 05.17.2025 |
|
|
-- |
-- |
Blower Door Test (1) 05.29.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 05.07.2025 |
|
|
-- |
-- |
Install Appliances (0) * 05.31.2025 |
Refrigerator needs installed |
|
-- |
-- |
Paint 3 (2) * 05.07.2025 |
|
|
-- |
-- |
Carpet (2) 05.07.2025 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.09.2025 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 05.30.2025 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 05.30.2025 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 05.30.2025 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 05.30.2025 |
|
|
-- |
-- |
Pre Walk Through (0) 06.02.2025 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 05.28.2025 |
Both set of steps are in process |
|
-- |
-- |
Cleaning (1) 06.07.2025 |
in process 6/5 |
|
-- |
-- |
Certificate of Occupancy (1) * 06.03.2025 |
|
|
-- |
-- |
C.O. to Lender (0) 06.03.2025 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.11.2025 |
possibly Tuesday, June 10 |
|
-- |
-- |
Payment for Upgrades (0) 06.09.2025 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.09.2025 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.26.2025 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.04.2025 |
|
|