| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bath | ||||
| White Kitchen Cabinetry | ||||
| Upgraded French Model Fridge | ||||
| Level 3 Quartz Countertops | ||||
| Double Waste Basket in Island | ||||
| Spice Rack in B9" | ||||
| LVP in Bonus Room | ||||
| LVP in Upstairs | ||||
| Subway tile shower walls WHITE | ||||
| Shower Door with Black Trim | ||||
| Expanded Driveway | ||||
| Upgraded Gardenia LVT | ||||
| White cabinets in Bathrooms (and bonus) | ||||
| Eggshell Paint | ||||
| Painted Pine Grade Steps to Bedroom Level (black) | ||||
| Quartz Level 3 in Master Bath tops ONLY | ||||
| Expanded 10x18 patio | ||||
| Amendment to increase price by $37,005 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.02.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.02.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Slab) (1) 12.28.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 02.20.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.19.2025 | scheduled for 3/18 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 03.19.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.19.2025 | ||
| -- | -- | Inspection (Framing) (1) * 03.19.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.12.2025 | ||
| -- | -- | Inspection (Insulation) (1) 03.24.2025 | Friday, March 21 | |
| -- | -- | Inspection (Electric Service) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.14.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 05.30.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 05.30.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 05.30.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 05.30.2025 | ||