Messy caulk or drywall on the side of the master shower glass doors |
Jesus |
|
-- |
-- |
Clean out garage- move trim and shoe |
Jorge |
|
-- |
-- |
Remove paint off front board on bonus bathroom vanity |
Overspray - Jesus |
|
-- |
-- |
Window BR right- cracked window |
Tom |
|
-- |
-- |
Powder bath mirror needed and finish shelving in master closet |
Paul |
|
|
|
Microwave vented to exterior
|
|
|
|
French Model Refrigerator
|
|
|
|
Painted Stairs to Bedroom Level
|
|
Tue |
Jul 1 |
Gutters (0) |
|
|
Tue |
Jul 1 |
Privacy Divider / Fence (0) |
|
|
Tue |
Jul 1 |
Sod / Seed / Landscaping (0) |
|
|
Tue |
Jul 1 |
Exterior Stone (0) |
|
|
Tue |
Jul 1 |
Set Electric Meter (0) * |
|
|
Tue |
Jul 1 |
Loan Approval (0) |
Veronica @ F&M Mortgage (80% LTV) |
|
Tue |
Jul 1 |
House Numbers (0) |
|
|
Tue |
Jul 1 |
Mailbox (0) |
|
|
Tue |
Jul 1 |
Shoe Moulding (0) |
In process 6/27 |
|
Tue |
Jul 1 |
Install Coded Lockbox (add extra keys) (0) |
|
|
Tue |
Jul 1 |
Set Water Meter (0) * |
|
|
Tue |
Jul 1 |
Electric Trim Out (3) |
|
|
Fri |
Jul 4 |
Ceiling Fans (0) |
|
|
Fri |
Jul 4 |
HVAC Trim Out (1) |
|
|
Mon |
Jul 7 |
Blower Door Test (1) |
|
|
Tue |
Jul 8 |
Install Appliances (0) * |
French/ Current date: 7/7 on site 6/27 |
|
Tue |
Jul 8 |
Carpet (2) |
|
|
Thu |
Jul 10 |
Appraiser Confirms Construction Completion (0) |
|
|
Thu |
Jul 10 |
Inspection (Final HVAC) (1) |
|
|
Fri |
Jul 11 |
Inspection (Final Plumbing) (1) |
|
|
Mon |
Jul 14 |
Inspection (Final Electric) (1) |
|
|
Tue |
Jul 15 |
Inspection (Final Building) (2) * |
|
|
Thu |
Jul 17 |
Pre Walk Through (0) |
|
|
Thu |
Jul 17 |
Stain Hardwood Stairs (1) |
|
|
Fri |
Jul 18 |
Cleaning (1) |
|
|
Mon |
Jul 21 |
Certificate of Occupancy (1) * |
|
|
Tue |
Jul 22 |
C.O. to Lender (0) |
|
|
Tue |
Jul 22 |
Schedule Closing (0) |
|
|
Tue |
Jul 22 |
Buyer Walk Through (1) |
|
|
Wed |
Jul 23 |
Payment for Upgrades (0) |
|
|
Wed |
Jul 23 |
Keys to Settlement Agent (0) |
|
|
Wed |
Jul 23 |
Review Settlement Statement (0) |
|
|
Wed |
Jul 23 |
Jerry Signs Closing Documents (0) |
|
|
Wed |
Jul 23 |
Request Trash Tote From POA Manager (0) |
|
|
Wed |
Jul 23 |
Closing (1) |
|
|
Thu |
Jul 24 |
Remove Coded Lockbox (0) |
|
|
|
-- |
-- |
Deck doors need install installed |
|
|
-- |
-- |
Front windows need install installed |
|
|
-- |
-- |
Don’t forget to toss a piece of insulation in the bathtubs |
Tom |
|
-- |
-- |
Farm Sink arriving Thursday 5/22. |
|
|
-- |
-- |
Broken bonus room window, on side wall |
On order |
|
-- |
-- |
Broken front window |
|
|
-- |
-- |
Painter needs to patch closet door in foyer. |
Jesus |
|
-- |
-- |
Messi, cock or drywall on the side of the master shower glass doors |
|
|
-- |
-- |
Powder bath near needed and finish shelving in master closet |
|
|
-- |
-- |
|
|
|
-- |
-- |
Ratified Contract? (0) 12.17.2024 |
|
|
|
|
Finished Bonus Room
|
|
|
|
Finished Bonus Bathroom
|
|
|
|
Expanded Deck 12 x 18
|
|
|
|
Expanded Driveway
|
|
|
|
White Cabinetry in Kitchen
|
|
|
|
White Cabinetry for Master vanity
|
|
|
|
Farmhouse Sink- white
|
|
|
|
Glass Shower Door with black trim
|
|
|
|
Level 3 Quartz in Kitchen
|
|
|
|
10 x 10 Patio under deck
|
|
|
|
Amendment to increase price by $30,555
|
|
-- |
-- |
$2500 Deposit Received (0) 12.17.2024 |
|
|
-- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
-- |
-- |
Association Packet Received (0) 12.20.2024 |
|
|
-- |
-- |
Selections Meeting (0) 12.31.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.04.2025 |
12/30: sent to Tekle |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 01.12.2025 |
1/11: sent to Jerry to sign |
|
-- |
-- |
Deposit For Upgrades Received (0) 01.11.2025 |
|
|
-- |
-- |
Building Permit (30) 11.22.2024 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 02.20.2025 |
|
|
-- |
-- |
Order Windows & Doors (0) 12.30.2024 |
|
|
-- |
-- |
Stake Out Home (1) 12.02.2024 |
|
|
-- |
-- |
Excavate (2) 12.02.2024 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.02.2024 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 12.02.2024 |
|
|
-- |
-- |
Pour Footers (1) * 12.02.2024 |
|
|
-- |
-- |
Set Forms (2) 12.19.2024 |
|
|
-- |
-- |
Pour Foundation Walls (1) 12.19.2024 |
|
|
-- |
-- |
Plumb Slab (2) 12.30.2024 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.30.2024 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.30.2024 |
|
|
-- |
-- |
Prepare Slab (1) 02.02.2025 |
|
|
-- |
-- |
Inspection (Slab) (1) 02.20.2025 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 06.09.2025 |
|
|
-- |
-- |
Pour Slab (1) * 02.27.2025 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 01.15.2025 |
1/11: sent to Brittany |
|
-- |
-- |
Framing I (9) 03.29.2025 |
|
|
-- |
-- |
Order Steps (0) 04.03.2025 |
|
|
-- |
-- |
Order Tubs / Showers (0) 04.07.2025 |
|
|
-- |
-- |
Framing II (8) 03.29.2025 |
|
|
-- |
-- |
Framing III (8) * 04.07.2025 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 05.12.2025 |
|
|
-- |
-- |
Install Stairs (0) 04.19.2025 |
|
|
-- |
-- |
Windows & Doors (0) * 05.21.2025 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.19.2025 |
|
|
-- |
-- |
Roofing (0) * 05.07.2025 |
|
|
-- |
-- |
Order Cabinets (0) 05.03.2025 |
Ordered 5/2 |
|
-- |
-- |
Order Appliances (0) 06.09.2025 |
|
|
-- |
-- |
Deck (0) 05.21.2025 |
Expanded 12 x 18 |
|
-- |
-- |
Driveway (0) * 06.27.2025 |
Expanded |
|
-- |
-- |
Patio (0) 06.15.2025 |
Expanded 10 x 10-deck |
|
-- |
-- |
HVAC Rough In (4) 04.30.2025 |
in process 4/23 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.14.2025 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 04.30.2025 |
|
|
-- |
-- |
Plumbing Rough In (4) 04.30.2025 |
in process 4/23 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 05.14.2025 |
|
|
-- |
-- |
Electric Rough In (4) 05.10.2025 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 05.14.2025 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 06.24.2025 |
|
|
-- |
-- |
Inspection (Framing) (1) * 05.17.2025 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.27.2025 |
In process 6/15 |
|
-- |
-- |
Insulation (2) * 05.14.2025 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.19.2025 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.12.2025 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 06.09.2025 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 06.09.2025 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 06.04.2025 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.21.2025 |
In process 5/17 |
|
-- |
-- |
Deed Preparation (0) 06.09.2025 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 05.31.2025 |
In process 5/21 |
|
-- |
-- |
Paint 1 (1) 05.31.2025 |
|
|
-- |
-- |
Garage Door (0) * 06.30.2025 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.04.2025 |
Deliver June 3, Install June 4 |
|
-- |
-- |
Granite Installation (1) * 06.21.2025 |
|
|
-- |
-- |
Interior Trim - Install (3) * 06.09.2025 |
In process 6/7 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 06.12.2025 |
|
|
-- |
-- |
Interior Trim - Paint (1) 06.11.2025 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.15.2025 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 06.15.2025 |
|
|
-- |
-- |
Paint 2 (3) 06.25.2025 |
In process 6/21 |
|
-- |
-- |
Cover Floors (1) 06.26.2025 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 06.19.2025 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) * 06.27.2025 |
In process 6/25 |
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.30.2025 |
|
|
-- |
-- |
Plumbing Trim Out (2) 06.27.2025 |
Almost complete 6/25 |
|
-- |
-- |
Paint 3 (2) * 06.27.2025 |
|
|