| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bathroom | ||||
| Expanded Deck 12 x 18 | ||||
| Expanded Driveway | ||||
| Microwave vented to exterior | ||||
| White Cabinetry in Kitchen | ||||
| White Cabinetry for Master vanity | ||||
| French Model Refrigerator | ||||
| Farmhouse Sink- white | ||||
| Glass Shower Door with black trim | ||||
| Painted Stairs to Bedroom Level | ||||
| Level 3 Quartz in Kitchen | ||||
| 10 x 10 Patio under deck | ||||
| Amendment to increase price by $30,555 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.02.2024 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.02.2024 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.30.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.30.2024 | ||
| -- | -- | Inspection (Slab) (1) 02.20.2025 | ||
| -- | -- | Inspection (Drain Tile) (0) 06.09.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 05.14.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 05.14.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 05.14.2025 | ||
| -- | -- | Inspection (Framing) (1) * 05.17.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 06.24.2025 | ||
| -- | -- | Inspection (Insulation) (1) 05.19.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 06.12.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 06.09.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 06.09.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 08.19.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 08.19.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 08.19.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 08.19.2025 | Tuesday, Aug 19 | |