| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bonus Bathroom | ||||
| Stone Gray Painted Kitchen Cabinetry | ||||
| Level 0 Quartz- Carrara Delphi | ||||
| Double Waste Basket | ||||
| Three Drawer Base 36" | ||||
| LVP (Mist) in Bonus Room | ||||
| Upgraded Acrylic tile imprinted shower | ||||
| Vented Microwave to Exterior | ||||
| One added Ceiling Fan Bonus Room | ||||
| French Model Refrigerator | ||||
| Amendment to increase price by $22,320 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 03.29.2025 | ||
| -- | -- | Inspection (Concrete Wall) (1) 03.29.2025 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 04.24.2025 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 05.01.2025 | ||
| -- | -- | Inspection (Slab) (1) 05.12.2025 | ||
| -- | -- | Inspection (Drain Tile) (0) 07.22.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 08.04.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 08.07.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 08.04.2025 | ||
| -- | -- | Inspection (Framing) (1) * 08.04.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 08.04.2025 | ||
| -- | -- | Inspection (Insulation) (1) 08.11.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 08.14.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 08.14.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 08.14.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 10.20.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 10.20.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 10.20.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 10.22.2025 | Wed, Oct 22 | |