| TO DO |
| KK |
Feb 20 (33) |
Contact number for Salah- 540-435-8521 |
|
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
|
|
|
Remove Coded Lockbox (0) |
|
|
|
| TO DO - COMPLETED OR DELETED |
|
|
Hardwood treads are soaked 7/2 |
|
|
|
|
Few windows needed |
|
|
|
|
Set bonus room bathtub |
|
|
|
|
Don’t forget to drywall the concrete bump out in the bonus room |
|
|
|
|
Farmhouse sink will need trim around the edges |
Fred - Arid |
|
|
|
George needs to come back and trim bathrooms now that cabinetry has been installed |
Jorge |
|
|
|
Bonus bathroom door has a split on the side of it |
Jorge - it is on site |
|
|
|
At the top of the second set of hardwood treads, there is a chunk of wood missing. I’m assuming that this can be patched. |
Denny |
|
|
|
The cabinet crown molding seems like it could be cut in a better place than in the middle of the upper cabinets? Is this being too picky? |
Fred ordered a new one |
|
|
|
Patch white board holes below under contract sign |
|
|
|
|
Brushed nickel accessories needed!!! |
Paul - on order |
|
|
|
Silver shower drain is going to be needed |
Plumber |
|
|
|
Powder bath mirror needs to be installed |
Paul |
|
|
|
Bonus bath light fixture seems really low- or maybe the mirror is high |
|
|
|
|
CODED LOCKBOX 2020 |
|
|
|
|
Brown plate cover needed for the kitchen island |
Jill, Electrician |
|
|
|
Feel light bulbs needed here |
Electrician |
|
|
|
Microwave vent does not work |
Jason |
|
|
|
Scratched up, transition strip, leading from main level to bedroom level |
Denny |
|
|
|
Please clean out bonus room carefully. Rocks and screws all over the place. Don’t want to scratch the floors. |
Jill, Lynn |
|
|
|
Shoe at island is gapping in a couple places |
Jorge |
|
|
|
Pocket door adjustment into pantry |
Jorge |
|
|
|
Clean off deck |
Jill, Lynn |
|
|
|
Paint front door again |
Jesus |
|
|
|
Paint concrete foundation located near garage |
Jesus |
|
|
|
Steps need an additional coat of stain and paint |
Jesus |
|
|
|
Few paint touchups still needed |
Jesus |
|
|
|
Lightbulb needed in bonus bathroom |
Jill |
|
|
|
Cap needed on white sewer pipe by front door |
Tom |
|
|
|
Piece of plastic needed at front door |
Tom will order |
|
|
|
The new trim at the top of the cabinet looks great, but there appears to be a color difference in the trim from what was originally installed |
|
|
|
|
Repaint steps |
Jesus |
|
|
|
missing lightbulb in bonus room |
Jill |
|
|
|
carefully clean bonus room |
Lynn |
|
|
|
Nail trim well to the rear of the island |
|
|
|
|
Nail trim well to the rear of the island |
Jorge |
|
|
|
Paddock cover needs red cutting or maybe just pushed in correctly |
|
|
|
|
attic cover needs adjusted or re-cut |
|
|
|
|
The interior door to the garage does not close on its own like it’s supposed to |
Jorge |
|
|
|
Cover to cable box needed in closet |
|
|
|
|
Home Inspection |
November 19 |
|
|
|
Little chip in the hall bathtub |
Wednesday, Nov 26 |
|
|
|
Some scuffing on the side of the master shower |
Wednesday, Nov 26 |
|
|
|
Front dead bolt - does not latch |
Paul |
|
|
|
Rear dead bolt from bonus room - does not latch |
Paul |
|
|
|
Kitchen GFCI breaker does not trip when tested |
Tester used in kitchen outlet |
|
|
|
Damaged register cover at front bedroom |
Replace - Jill |
|
|
|
Hump in flooring of second floor bedroom |
Denny |
|
|
|
Missing kitchen cabinet shelf - left of microwave |
Fred will order |
|
|
|
Dishwasher drain needs high loop |
Plumber |
|
|
|
Adjust attic access panel to sit flushly |
Tom |
|
|
|
Dent in refrigerator door |
Maybe? |
|
| KK |
Feb 20 (33) |
|
|
|
| CL |
Feb 23 (30) |
This driveway is beginning to flake. Photos for proof if owners complain later. |
|
|
| CL |
Feb 23 (30) |
This driveway is beginning to flake. Photos for proof if owners complain later. |
|
|
| CL |
Feb 25 (28) |
Owners on site 2/25 |
|
|
| KK |
Feb 20 (33) |
Cracks to be filled throughout from settling |
Jesus |
|
| KK |
Feb 20 (33) |
Paint touchup throughout |
Jesus |
|
| KK |
Feb 20 (33) |
Light bulb needed in exterior light off bonus room |
Jill |
|
| KK |
Feb 20 (33) |
Tighten the handrail on the first set of steps |
|
|
| KK |
Feb 20 (33) |
Remove yellow cover on smoke detector in living room |
Luke |
|
| KK |
Feb 20 (33) |
Dining chandelier by one bar |
Electrician |
|
| KK |
Feb 20 (33) |
Clean off deck |
Jill |
|
| KK |
Feb 20 (33) |
Caulk in pedestal sink |
Jesus |
|
| SR |
Feb 23 (30) |
Tighten the handrail on the first rail of second steps |
Jorge |
|
| CL |
Feb 18 (35) |
Beeping smoke detector |
Primary bedroom - Jill |
|
| KK |
Feb 20 (33) |
Prepare the crack in the attic access panel |
|
|
| KK |
Feb 20 (33) |
Rework upper bedroom door on the left |
Jorge |
|
| SR |
Feb 23 (30) |
Repair the crack in the attic access panel |
Jesus |
|
|
| UPGRADES - COMPLETED |
| |
|
Finished bonus room
|
|
| |
|
Finish bonus bath
|
|
| |
|
Luxury vinyl plank in bonus room
|
|
| |
|
Luxury vinyl plank upstairs
|
|
| |
|
Oak treads to bedroom level
|
|
| |
|
Eggshell paint
|
|
| |
|
Expanded driveway
|
|
| |
|
Farmhouse sink
|
|
| |
|
Cabinet crown molding
|
|
| |
|
Spice rack B 9”
|
|
| |
|
French style refrigerator
|
|
| |
|
Microwave vented two exterior
|
|
| |
|
Expanded 10 x 10 patio
|
|
| |
|
Expanded 10 x 18 Deck
|
|
| |
|
Amendment to increase price by $31,740
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 01.02.2025 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 01.06.2025 |
|
|
| -- |
-- |
Association Packet Requested (0) 06.30.2025 |
|
|
| -- |
-- |
Association Packet Received (0) 01.10.2025 |
|
|
| -- |
-- |
Selections Meeting (0) 01.16.2025 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 01.22.2025 |
1/16: sent to Saad |
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 05.17.2025 |
4/18: sent to Saad |
|
| -- |
-- |
Deposit For Upgrades Received (0) 01.25.2025 |
|
|
| -- |
-- |
Building Permit (30) * 01.25.2025 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 04.03.2025 |
|
|
| -- |
-- |
Order Windows & Doors (0) 06.16.2025 |
|
|
| -- |
-- |
Stake Out Home (1) 03.29.2025 |
|
|
| -- |
-- |
Excavate (2) 03.29.2025 |
|
|
| -- |
-- |
Inspection (Footers) (1) 03.29.2025 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 03.29.2025 |
|
|
| -- |
-- |
Pour Footers (1) * 03.29.2025 |
|
|
| -- |
-- |
Set Forms (2) 03.29.2025 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 03.29.2025 |
|
|
| -- |
-- |
Plumb Slab (2) 04.07.2025 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 04.24.2025 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 04.24.2025 |
|
|
| -- |
-- |
Prepare Slab (1) 05.01.2025 |
|
|
| -- |
-- |
Inspection (Slab) (1) 05.12.2025 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 07.22.2025 |
|
|
| -- |
-- |
Pour Slab (1) * 05.01.2025 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 01.29.2025 |
1/26: sent to Saad |
|
| -- |
-- |
Framing I (9) 05.27.2025 |
|
|
| -- |
-- |
Order Steps (0) 06.16.2025 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 06.16.2025 |
|
|
| -- |
-- |
Framing II (8) 06.15.2025 |
|
|
| -- |
-- |
Framing III (8) * 06.30.2025 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 07.03.2025 |
|
|
| -- |
-- |
Install Stairs (0) * 06.30.2025 |
|
|
| -- |
-- |
Windows & Doors (0) * 07.14.2025 |
|
|
| -- |
-- |
House Number and Status in Window (0) 07.17.2025 |
|
|
| -- |
-- |
Roofing (0) * 07.10.2025 |
|
|
| -- |
-- |
Order Cabinets (0) 07.28.2025 |
|
|
| -- |
-- |
Order Appliances (0) 08.18.2025 |
|
|
| -- |
-- |
Deck (0) 08.03.2025 |
Expanded 12 x 18 |
|
| -- |
-- |
Gutters (0) 09.17.2025 |
|
|
| -- |
-- |
Driveway (0) * 09.24.2025 |
|
|
| -- |
-- |
Patio (0) 08.23.2025 |
Expanded 10 x 10 |
|
| -- |
-- |
Privacy Divider / Fence (0) * 09.20.2025 |
in process 9/17 |
|
| -- |
-- |
Sod / Seed / Landscaping (0) 10.23.2025 |
|
|
| -- |
-- |
HVAC Rough In (4) 07.09.2025 |
In process 7/2 |
|
| -- |
-- |
Rough In Microwave Vent (0) 07.09.2025 |
|
|
| -- |
-- |
Plumbing Rough In (4) 07.16.2025 |
In process 7/12 |
|
| -- |
-- |
Electric Rough In (4) 07.28.2025 |
|
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 07.28.2025 |
|
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 07.28.2025 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 07.28.2025 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 07.28.2025 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 08.04.2025 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 08.27.2025 |
|
|
| -- |
-- |
Exterior Stone (0) 09.08.2025 |
|
|
| -- |
-- |
Insulation (2) * 07.28.2025 |
|
|
| -- |
-- |
Inspection (Insulation) (1) 07.28.2025 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 08.21.2025 |
|
|
| -- |
-- |
Set Electric Meter (0) * 09.16.2025 |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) 08.14.2025 |
|
|
| -- |
-- |
Inspection (Main Water Line) (0) 08.14.2025 |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) 07.31.2025 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 08.03.2025 |
|
|
| -- |
-- |
Loan Approval (0) 02.13.2026 |
USDA |
|
| -- |
-- |
Deed Preparation (0) 09.26.2025 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 08.09.2025 |
In process 8/6 |
|
| -- |
-- |
Paint 1 (1) 08.09.2025 |
|
|
| -- |
-- |
Garage Door (0) 08.20.2025 |
|
|
| -- |
-- |
House Numbers (0) 10.01.2025 |
|
|
| -- |
-- |
Mailbox (0) 09.08.2025 |
|
|
| -- |
-- |
Cabinet Installation (2) * 08.16.2025 |
Delivery 8/13, Install 8/14 |
|
| -- |
-- |
Granite Installation (1) * 09.13.2025 |
Installing Sep 9 |
|
| -- |
-- |
Interior Trim - Install (3) * 08.16.2025 |
In process 8/13 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) 08.21.2025 |
|
|
| -- |
-- |
Interior Trim - Paint (1) 08.20.2025 |
|
|
| -- |
-- |
Luxury Vinyl Plank (3) * 09.03.2025 |
In process 8/27 |
|
| -- |
-- |
Luxury Vinyl Tile (0) 08.27.2025 |
|
|
| -- |
-- |
Paint 2 (3) 09.17.2025 |
In process 9/13 |
|
| -- |
-- |
Cover Floors (0) 09.25.2025 |
|
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 08.28.2025 |
|
|
| -- |
-- |
Shoe Moulding (0) 09.17.2025 |
In process 9/10 |
|
| -- |
-- |
Shelving, Door Knobs, Fire Extinguisher (1) * 09.17.2025 |
|
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) 09.25.2025 |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) 09.04.2025 |
|
|
| -- |
-- |
Set Water Meter (1) * 09.29.2025 |
|
|
| -- |
-- |
Electric Trim Out (3) * 10.01.2025 |
In process 9/24 |
|
| -- |
-- |
Ceiling Fans (0) 09.25.2025 |
|
|
| -- |
-- |
HVAC Trim Out (1) * 10.01.2025 |
|
|
| -- |
-- |
Blower Door Test (1) 10.02.2025 |
|
|
| -- |
-- |
Plumbing Trim Out (2) * 09.24.2025 |
In process 9/20 |
|
| -- |
-- |
Install Appliances (0) * 09.20.2025 |
French 7/30 |
|
| -- |
-- |
Paint 3 (2) * 09.20.2025 |
|
|
| -- |
-- |
Carpet (2) 09.17.2025 |
|
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) 12.22.2025 |
|
|
| -- |
-- |
Inspection (Final HVAC) (0) 10.02.2025 |
|
|
| -- |
-- |
Inspection (Final Plumbing) (0) 10.02.2025 |
|
|
| -- |
-- |
Inspection (Final Electric) (0) 10.02.2025 |
|
|
| -- |
-- |
Inspection (Final Building) (4) * 10.02.2025 |
|
|
| -- |
-- |
Pre Walk Through (0) 10.06.2025 |
|
|
| -- |
-- |
Stain Hardwood Stairs (1) * 10.25.2025 |
In process 10/8 |
|
| -- |
-- |
Cleaning (1) 11.23.2025 |
In process 11/19 |
|
| -- |
-- |
Certificate of Occupancy (1) * 10.04.2025 |
|
|
| -- |
-- |
C.O. to Lender (0) 10.04.2025 |
|
|
| -- |
-- |
Schedule Closing (0) 02.13.2026 |
|
|
| -- |
-- |
Buyer Walk Through (1) * 02.20.2026 |
Thu, Feb 19, 10:30 AM ? |
|
| -- |
-- |
Payment for Upgrades (0) 10.04.2025 |
|
|
| -- |
-- |
Keys to Settlement Agent (0) 02.13.2026 |
|
|
| -- |
-- |
Review Settlement Statement (0) 02.17.2026 |
|
|
| -- |
-- |
Jerry Signs Closing Documents (0) 02.19.2026 |
|
|
| -- |
-- |
Request Trash Tote From POA Manager (0) 10.15.2025 |
|
|
| -- |
-- |
Closing (1) 02.22.2026 |
Brittany @ West View Title (Feb 20, 9AM) |
|