| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Painted Kitchen Cabinetry | ||||
| Level 3 Granite | ||||
| 3 drawer base in place of B 36" | ||||
| 3 drawer base in place of B 18 | ||||
| Pull Out Trash Cans | ||||
| 2 roll out trays in B 36" | ||||
| Microwave vented to Exterior | ||||
| Stained Hardwood Treads to bedroom Level | ||||
| Upgraded LVT in Master Bath and Hall Bath ( not laundry) | ||||
| Expanded Driveway | ||||
| Additional ceiling fans (2) in Bedrooms 1 and 2 | ||||
| Digital Deadbolt at front door and bonus room French door | ||||
| Ecobee 3 Lite Smart WiFi enabled Thermostat | ||||
| Expanded 10 x 18 Deck | ||||
| Amendment to increase price by $10,820 | ||||
| vanity with three drawer stack | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 03.29.2025 | ||
| -- | -- | Inspection (Concrete Wall) (1) 03.29.2025 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 04.24.2025 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 04.24.2025 | ||
| -- | -- | Inspection (Slab) (1) 05.12.2025 | ||
| -- | -- | Inspection (Drain Tile) (0) 07.22.2025 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 07.28.2025 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 07.28.2025 | ||
| -- | -- | Inspection (Rough In Electric) (1) 07.28.2025 | ||
| -- | -- | Inspection (Framing) (1) * 07.28.2025 | ||
| -- | -- | Inspection (Deck Piers) (0) 08.04.2025 | ||
| -- | -- | Inspection (Insulation) (1) 07.28.2025 | ||
| -- | -- | Inspection (Electric Service) (0) 08.21.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 08.21.2025 | ||
| -- | -- | Inspection (Main Water Line) (0) 08.21.2025 | ||
| -- | -- | Inspection (Final HVAC) (0) 10.02.2025 | ||
| -- | -- | Inspection (Final Plumbing) (0) 10.02.2025 | ||
| -- | -- | Inspection (Final Electric) (0) 10.02.2025 | ||
| -- | -- | Inspection (Final Building) (4) * 10.02.2025 | Mon, Sep 29 | |